Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 5 of 5 for “"Operations and support (O&S)"”

  1. Unmanned surface combatant considerations for concept exploration

    This capstone project explored the operational and design considerations/constraints for an autonomous Unmanned Surface Combatant (USC). Using a USC in selected missions could lead to cost reductions and enhanced capabilities when compared with similar manned combatants by eliminating personnel and …

    nps Repository record for Unmanned surface combatant considerations for concept exploration (opens in a new tab)

  2. Cost implications of the Broad Area Maritime Surveillance Unmanned Aircraft System for the Navy Flying Hour Program and Operation and Maintenence budget

    … in existing organic Intelligence, Surveillance, and Reconnaissance (ISR) collection capabilities within the Navy. To fill this capability gap, the Navy has initiated a recapitalization plan of its airborne ISR force to leverage the technological capabilities of unmanned systems, of which the …

    nps Repository record for Cost implications of the Broad Area Maritime Surveillance Unmanned Aircraft System for the Navy Flying Hour Program and Operation and Maintenence budget (opens in a new tab)

  3. Other transactions for prototypes as used in the commercial operations and support savings initiative 1997: a contractors' perspective

    The Commercial Operations and Support Savings Initiative (COSSI) is a Government effort to reduce Operations and Support (O&S) costs by inserting commercial products and processes into fielded military systems. This initiative utilizes Other Transactions for Prototypes, also known as Section 845 …

    nps Repository record for Other transactions for prototypes as used in the commercial operations and support savings initiative 1997: a contractors' perspective (opens in a new tab)

  4. Why Army program managers struggle as life cycle managers: a study of the PMs roles, responsibilities, and barriers in the execution of Operations and Support

    … plan (LCSP) after transition into the Operations and Support (O&S) phase. Due to concerns with the M 777 Howitzer program, Program Executive Office Ammunition (PEO-Ammo) requested a review of the perceived lack of PM control during the O&S phase. This lack of control is focused on the …

    nps Repository record for Why Army program managers struggle as life cycle managers: a study of the PMs roles, responsibilities, and barriers in the execution of Operations and Support (opens in a new tab)

  5. Adapting the Past for Future Flight: Preliminary Design Framework for Long Duration O&S Aerospace Programs

    … due to their immense scale, extended timelines, and substantial budgets. While the reuse of heritage technologies helps reduce costs and mitigate risks, it introduces complications as these elements often struggle to meet modern requirements. This incompatibility, coupled with increasingly …

    gatech Repository record for Adapting the Past for Future Flight: Preliminary Design Framework for Long Duration O&S Aerospace Programs (opens in a new tab)