Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 2 of 2 for “"PSCo IRP"”.
-
An Integrated Resource Plan for Public Service Company of Colorado (PSCo)
An Integrated Resource Plan (IRP) is a tool used by load serving entities (LSEs) to plan how they will meet forecasted energy demand and system reliability requirements through a combination of supply-side and demand-side resources. The goal of an IRP is to identify the lowest cost option to meet …
-
2050 Integrated Resource Plan for Public Services Company of Colorado
Our IRP aims to determine the optimal resource mix that will meet the forecasted load in 2030, 2040, and 2050. This report models a Reference or “business-as-usual” case and four alternative scenarios that deploy renewable energy resources or carbon capture technologies at varying levels to meet …