Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 122 for “"PWC"”.
-
Rate stabilization effectiveness at PWC San Diego
Since 1 July 1975, Public Works Centers (PWC's) have tilled their industrial fund customers on the basis of stabilized rates. The effectiveness of this rate stabilization is addressed using PWC San Diago as the model activity. The thesis (1) explores the policy of rate stabilization with its …
-
Capital equipment acquisition procedures for enhancing productivity at PWC San Francisco.
… Program at the Navy Public Works Center (PWC) San Francisco, Calif. The Department of Defense and Navy programs provide a broad framework within all PWCs have developed their own unique Productivity Programs. The Asset Capitalization program (ACP) has provided industrial fund activities …
-
Critical time in the PWC 170 test: the influences of work load duration, work load intensity, and state of training
The purpose of this study was to examine the concept of "critical time" (i.e. the time required to achieve steady-state heart rates) in the administration of the PWG 170 three-stage submaximal bicycle ergometer test. Specifically, the problem involved determining the effects of four different work …
-
La complejidad en la aplicación de la NIA 315 y su impacto en los procesos de auditoría realizados por PwC en 2022
… en los procedimientos de auditoría financiera en PwC. El desarrollo metodológico de este trabajo se basó en 3 capítulos, los mismos que permitieron que se abordará el tema de forma integral. En el capítulo I: Presentación de la situación problemática, está basado en la descripción y contextos de …
-
Plant-wide Control: Methodologies, Applications and Performance Assessment
Plant-wide control (PWC) methodologies are important given the increasing degree of integration in chemical processes due to material recycle, energy integration and stringent product quality requirements. All these, though economically favourable, pose challenges to smooth plant operation making …
-
Comparing satisfaction with occupational performance using a pushrim-activated power-assisted wheelchair and a power wheelchair among task-specific power wheelchair users
The manual wheelchair (MWC) and power wheelchair (PWC) each present advantages and disadvantages to participation and occupational performance. Consequently, some individuals choose to use both devices, depending upon the activity. A pushrim-activated, power-assisted wheelchair (PPW) may provide an …
-
FACTORS CONTRIBUTING TO CONFLICTS AND USER SATISFACTION AT LAKE GASTON : EXAMINING CONFLICT BETWEEN PERSONAL WATERCRAFT USERS AND ANGLERS
Over the past thirty years, personal watercraft (PWC) use has grown widely and become common on many waterways. Despite evidence that links PWC use to disturbances with other recreationists, fishery activities, and wildlife at recreational resource sites, few studies of recreational user conflict …
-
The effects of an elevated pre-test heart rate on a cardiovascular test
… of the Physical Working Capacity Maximum (PWC max) test and Steady State Heart Rates (SSHR) during the two workloads that are used to predict PWC max. Fifteen subjects (ages 18-33 yrs, height 169.38 +/- 9.77 cm, body mass 68.43 +/- 12.53 kg, percent body fat 22.27 +/- 7.40 %) participated …
-
Examining product differentiation within the big 4 in the Australian audit market
… I single out PricewaterhouseCoopers (PwC) as the firm which is most likely to be using vertical product differentiation as its predecessor firm Price Waterhouse is historically considered to be the most prestigious of the Big N firms. In particular, I investigate if there is evidence …
-
An investigation into the Navy Public Works Centers specific work service processing problems.
This thesis is about Navy Public Works Centers (PWC) and the problems associated with specific work service processing. The PWC concept is described with emphasis on the development of PWCs, the organization and mission, accounting and management systems, and the services offered to customers. …
-
plant-wide control of industrial processes using rigorous simulation and heuristics
… for efficient and effective plant-wide control (PWC) systems is more than ever. First, a comprehensive review of various PWC methodologies in the literature is carried out, and systematic classifications of PWC methodologies are presented. Then, a methodically-driven integrated framework, that …
-
Phase plane analysis of physical working capacity
… procedure in which physical working capacity (PWC₁₇₀) was determined. On the testing day a resting phase plane loop was first recorded. The PWC₁₇₀ test was then administered, followed by the immediate recording of a post-exercise loop. Two subsequent loops were then recorded at recovery …
-
The interrelationships of oxygen intake capacity, strength, body composition and physical working capacity.
… working capacity, as measured by the Sjostrand PWC₁₇₀ test. The subsidiary problems were: 1. to determine what statistical procedure, i.e., zero order correlations, first order partial correlations, twenty-second order partial correlations or stepwise multiple regression analysis, gave the …
-
Application of the commercial or industrial activities program to Public Works Centers
… of Defense to the level of the individual PWC. A sample submission prepared by PWC San Francisco Bay is presented to demonstrate some of the problems encountered. Following this are the results of a study to demonstrate the potential effect on PWC San Francisco Bay overhead rates if various …
-
Lower leg injuries and personal watercraft sports activities
… study, data from personal watercraft (PWC) accidents are examined in order to increase the understanding of lower leg injuries resulting from PWC sports activities. The literature indicates that approximately 33% of all PWC related injuries involve the lower leg, yet studies containing …
-
Analysis of construction design estimation practices at Public Works Center
… process for assigning projects to PWC engineers and Architect-Engineer firms. This study was performed at PWC, Great Lakes and consisted of personnel interviews and the compilation of a database from internal reports. Although a predictive model was not developed, it was discovered …
-
An evaluation of indirect cost rate determination at the Naval Postgraduate School
… 2003, NPS commissioned PricewaterhouseCoopers (PwC), a professional consulting firm, to study the current rate structure and make recommendations as to what rates NPS should charge for reimbursable research and education. PwC's final report was submitted to the school in the spring of 2004. The …
-
Powered wheelchair skills training for older adults with cognitive impairment : using shared control to facilitate independence
Powered wheelchairs (PWCs) promote participation and well-being for individuals with limited mobility. However, many individuals who would benefit from a PWC do not have access to one. This is particularly true for older adults with cognitive limitations who are perceived as being unable to learn …
-
Politics and ideology in a Protestant working class community in Belfast
… Irish Marxism has been dismissive of the PWC reducing their politics to the protection of marginal privelege sustained by Britain's Imperialist presence. This thesis argues that such a perspective is inadequate. It is essential to move away from the concept of loyalist ideology as a …
Page 1 of 7