Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 88 for “"Pay back"”.

  1. The Pink Pony

    In an absurd and desperate attempt to pay back taxes, an eccentric Charlestonian socialite turns his beloved boutique hotel into a male brothel.

    lmu Repository record for The Pink Pony (opens in a new tab)

  2. It Rains in ClearSkies

    … corpse cleaner must harvest his boss's organs to pay back his and his brother's immense debt, but in doing so, he miraculously discovers empathy toward others.

    lmu Repository record for It Rains in ClearSkies (opens in a new tab)

  3. Analyzing sustainable energy opportunities for a small scale off-grid facility: a case study at Experimental Lakes Area (ELA), Ontario

    … system using the existing diesel generators as back-up has the shortest pay back period of the technologies modeled. The biomass based CHP system has a pay back period of 4.1 years at $0.80 per liter of diesel, as diesel price approaches $ 2.00 per liter the pay back period reduces to 0.9 years, …

    manitoba Repository record for Analyzing sustainable energy opportunities for a small scale off-grid facility: a case study at Experimental Lakes Area (ELA), Ontario (opens in a new tab)

  4. Eficiência energética e energia solar fotovoltaica em prédios públicos no setor de educação no nordeste do Brasil: o caso da expansão do IFRN

    … to the Energy Efficiency Label (ENCE). Energy Pay-Back Time, Green House Gas Emission Rate (GHGe-rate) and Emission Pay-Back Time were. It was demonstrated the great influence in the results of the electrical matrix characteristics of the place where the PV systems were manufactured. It was …

    brazil-uerj Repository record for Eficiência energética e energia solar fotovoltaica em prédios públicos no setor de educação no nordeste do Brasil: o caso da expansão do IFRN (opens in a new tab)

  5. Spillvärmeåtervinning via avgaspanna - En jämförande analys av våt-ångturbin och skruvexpander

    … the different systems, but with a similar pay-back time because of the systems different prices. Both systems pay-back time is around 9 years.

    chalmers Repository record for Spillvärmeåtervinning via avgaspanna - En jämförande analys av våt-ångturbin och skruvexpander (opens in a new tab)

  6. A reality-based cost-benefit analysis of high performance residences in Victoria, BC

    … disadvantage, energy advantage, and expected pay-back period associated with building an above-code residence in Victoria, BC. In addition, this initiative created a much-needed benchmark for contractors to gain a firm understanding of the construction details required to achieve the various …

    uvic Repository record for A reality-based cost-benefit analysis of high performance residences in Victoria, BC (opens in a new tab)

  7. Improved Heat Recovery at Skoghall Mill - Pinch analysis with economic and technical considerations

    … of live steam can be reduced by 10 to 20 MW. The pay back periods for these investments lie around one year when the saved fuel is oil. For the case with bark the pay back periods are approximately 2.5 to 4 years.

    chalmers Repository record for Improved Heat Recovery at Skoghall Mill - Pinch analysis with economic and technical considerations (opens in a new tab)

  8. Modern användning av vind för framdrivning av kommersiella fartyg - En ekonomisk analys av alternativa lösningar

    … lösningar vilket innebär att de är lönsamma. Pay back-tiderna på moderna segellösningar ligger på runt åtta år. Vid högre drivmedelspris ökar nuvärdena och pay back-tiderna minskar. I dagsläget är det endast Flettnerrotorer som används för kommersiell sjöfart. Ungefär 20 rotorer finns …

    chalmers Repository record for Modern användning av vind för framdrivning av kommersiella fartyg - En ekonomisk analys av alternativa lösningar (opens in a new tab)

  9. Water consumption practices in Michigan State University residence halls and general fund buildings

    … projects, cost-benefit analyses were conducted. Pay-back periods varied between the projects, but with some as low as one year, it is clear that changes to Michigan State University's water infrastructure can result in significant economic improvements and reductions in water consumption.

    msu Repository record for Water consumption practices in Michigan State University residence halls and general fund buildings (opens in a new tab)

  10. Plan de negocio para implementar un restaurante de platos cocinados de manera artesanal

    … y un período de recuperación de inversión (PAY BACK) de dos años y diez meses.

    upc-peru Repository record for Plan de negocio para implementar un restaurante de platos cocinados de manera artesanal (opens in a new tab)

  11. Recuperação de mais-valias fundiárias urbanas em Natal: estudo sobre a valorização do solo e os efeitos dos investimentos pré/pós copa do mundo 2014

    … who benefit from this process have to pay back and contribute towards investments to develop less favoured, and poorer areas. This dissertation sought to identify the most valued areas in Natal, Brazil, using three data sets related to taxation on land transactions, property and use …

    brazil-ufrn Repository record for Recuperação de mais-valias fundiárias urbanas em Natal: estudo sobre a valorização do solo e os efeitos dos investimentos pré/pós copa do mundo 2014 (opens in a new tab)

  12. Moral responsibilities between parent and children though lifespan

    … children unconditionally. In return, children pay back their moral debts to parents by fulfilling filial piety, including doing well in school, respecting family members and supporting parents. However, the traditional parent-child relationship may have changed after the one-child policy due to …

    texas Repository record for Moral responsibilities between parent and children though lifespan (opens in a new tab)

  13. Developing and evaluating continuously changing schedules for Hardwood lumber dry kilns

    … Energy and time savings result in a 3.8 year pay back period for the investment of computer equipment.</p>

    ut-knoxville Repository record for Developing and evaluating continuously changing schedules for Hardwood lumber dry kilns (opens in a new tab)

  14. Atsinaujinančiųjų energijos šaltinių efektyvumo tyrimas /

    … for different heating systems, calculation of pay back period for heat pump. The conclusions and recomendations are given. This thesis cam be useful in selection of heating system for building , and selection of heat pump type.

    vilnius Repository record for Atsinaujinančiųjų energijos šaltinių efektyvumo tyrimas / (opens in a new tab)

  15. The Technical and Economic Feasibility of Producing Methane from Biomass Using a Leaching-Bed/Packed-Bed Conversion Process

    … using a life cycle cost model to determine pay back period. The results indicate that payoff period will be less than equipment life and that net energy production occurs. Areas where further research would promote the introduction of this technology are identified and discussed.

    ucf Repository record for The Technical and Economic Feasibility of Producing Methane from Biomass Using a Leaching-Bed/Packed-Bed Conversion Process (opens in a new tab)

  16. Legal regulations of tip pooling and tip sharing in the United States hospitality industry

    … Starbucks, for example, has just been ordered to pay back $105 million to their baristas for violating California labor laws regulating tip pooling. Hospitality driven companies can benefit from understanding their state and federal laws pertaining to tips to avoid expensive lawsuits and negative …

    unlv Repository record for Legal regulations of tip pooling and tip sharing in the United States hospitality industry (opens in a new tab) Download PDF for Legal regulations of tip pooling and tip sharing in the United States hospitality industry (opens in a new tab)

  17. Torrefied-Hydrochar Blend Wood Biomass Improvement for Fuel Pellet Production: A Tree-to-Customer Analysis

    … viable at this scale with a relatively short pay-back period and high internal rate of return. A hazard and operability analysis with health and safety review is presented with appropriate mitigation techniques. Described in this research are the reasons for the chosen ratio of torre ed …

    unr Repository record for Torrefied-Hydrochar Blend Wood Biomass Improvement for Fuel Pellet Production: A Tree-to-Customer Analysis (opens in a new tab)

  18. AN ANALYSIS OF THE EFFECT OF THE CONTINUATION PAY BONUS ON ACTIVE DUTY MARINE PERSONNEL

    … this new retirement system is the continuation pay (CP) bonus. The CP bonus is a retention incentive and force shaping tool offered to Marines at 12 years of service. Taking the CP bonus obligates a four year pay back. In this thesis, I explore the impact of the Marine Corps’ bonus multiplier …

    nps Repository record for AN ANALYSIS OF THE EFFECT OF THE CONTINUATION PAY BONUS ON ACTIVE DUTY MARINE PERSONNEL (opens in a new tab)

  19. Essays on the economic feasibility of irrigation systems in cotton production

    … others using center pivot or furrow. In terms of payback period, furrow and center pivot need less time to recover investment cost than pivot & SDI. Overall, pivot & SDI combination system is not a good option for producers with limited irrigation. The sensitivity analysis by changing SDI durable …

    ttu Repository record for Essays on the economic feasibility of irrigation systems in cotton production (opens in a new tab)

Page 1 of 5