Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 3 of 3 for “"Payment times"”

  1. A Project payment scheduling problem with discounted cash flows

    In this study we consider a project payment model with discounted cash flows. We assume that the client payment times are defined in the project contract. The activities are characterized by their processing times and costs that are incurred at their completions. Our problem is to find the client …

    metu Repository record for A Project payment scheduling problem with discounted cash flows (opens in a new tab)

  2. Heuristic algorithms for payment models in project scheduling

    … This schedule holds the start and finish times of each activity (e.g. pouring concrete for the bridge foundations), and respects the imposed resource restrictions and the order in which the activities have to be executed (e.g. excavate the river banks before pouring concrete for the …

    ghent Repository record for Heuristic algorithms for payment models in project scheduling (opens in a new tab)

  3. Les créances de sécurite sociale et l'entreprise en difficulté : vers la contribution des organismes percepteurs au soutien de l'activité économique

    Un affaiblissement des prérogatives de recouvrement et un renforcement de l’accompagnement : telle pourrait-être la synthèse de l’étude de l’évolution des rapports entre les organismes de sécurité sociale et les entreprises en difficulté. Progressivement, le sauvetage de l’activité a été érigé en …

    star-france Repository record for Les créances de sécurite sociale et l'entreprise en difficulté : vers la contribution des organismes percepteurs au soutien de l'activité économique (opens in a new tab) Restricted access