Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 8 of 8 for “"Phase-1 Upgrade"”.
-
Occupancy Study of the CMS Pixel Subdetector for the Phase 1 Upgrade
The Phase 1 Upgrade for CMS includes the installation of a new pixel subdetector, complete with newly designed readout chips as well as a new geometry. This upgrade is necessary to replace the existing irradiated pixel subdetector with one designed for higher instantaneous luminosities. It also …
-
An electronic model of the ATLAS Phase-1 Upgrade Hadronic Endcap Calorimeter Front End Crate Baseplane
… model of two pairs of interconnects of the ATLAS Phase-1 Upgrade Hadronic Endcap Front End Crate prototype baseplane. Stripline transmission lines of the baseplane are modeled using Keysight Technologies' Electromagnetic Professional's (EMPro) 3D electromagnetic simulation (Finite Element Method) …
-
Measurements of single dissociative diffraction of protons in √s = 13 TeV collisions with the ATLAS experiment
… = 1.15 ± 0.13. Simulation work on the L1CALO upgrade of ATLAS is also presented, studying the design of the e/γ algorithm for the phase-1 upgrade.
-
Simulation of the upgraded Phase-1 Trigger Readout Electronics of the Liquid-Argon Calorimeter of the ATLAS Detector at the LHC
In the context of an intensive upgrade plan for the Large Hadron Collider (LHC) in order to provide proton beams of increased luminosity, a revision of the data readout electronics of the Liquid-Argon-Calorimeter of the ATLAS detector is scheduled. This is required to retain the efficiency of the …
-
An innovative beam halo monitor system for the cms experiment at the lhc: design, commissioning and first beam results
… are based on the CMS Hadronic Calorimeter Phase 1 upgrade electronics. The electronics record the time of arrival and the integrated charge over 25 ns of each detector unit signal and deliver bunch-by-bunch occupancy histograms. The BHM software then receives and normalizes the results and …
-
Upgrade of the (barrel) muon trigger electronic system of the CMS experiment at CERN
… luminosity of 1034cm-2s-1. According to the LHC phase I schedule, on 2016 the luminosity has been increased by a factor of two and reached 5x1034cm-2s-1 with the LHC phase II upgrade in 2025. The phase-1 upgrade of the L1T system is completed in 2016 and provides the required hardware with state …