Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 2055 for “"Pit"”.
-
The Viper Pit
he Viper Pit was born out of a writing prompt from Jim Braziel’s fiction writing class. We had to write a short story based on a photo from The American Photobooth. On page 174 of that book, a photo on the far right corner sparked my interest last year. It was the type of picture you see and …
-
Optimizing the ultimate pit
Includes bibliographical references.
-
Open pit mine production scheduling
Includes bibliographical references.
-
Open pit mine production scheduling
Includes bibliographical references.
-
Prediction and study of bitter pit on apples using Mg² induced bitter pit-like symptoms
Thesis (Ph. D.)--Michigan State University. Department of Horticulture, 1993
-
Pit veiklos kryptys, ugdant mokinius karjerai /
Relevance of the research: Selection of a profession for a pupil studying in a general education school is a very important and complex task. Very often young people do not know what profession to choose. Professional information assistance is required for the expedient choice. In order to provide …
-
Pit initiation on austenitic stainless steels
… of the initiation and early stages of growth of pitting corrosion on stainless steels in dilute chloride solution are described. Electrochemical techniques have been used to detect and follow the evolution of anodic current transients which occur at the nano-amp level prior to the onset of …
-
Implicit Bias and Pit Bull Welfare
… the United States, the majority of places target Pit Bulls, either in conjunction with other breeds or solely. The negative view of Pit Bulls is based on a multitude of factors, one of which could be the perception of the likely owner of this breed. Pit Bulls are frequently associated with …
-
Open pit mine planning with stockpiling
… apply operations research techniques to open pit mine production scheduling with stockpiling (OPMPS+S). The first paper, "Linear Models for Stockpiling in Open-pit Mine Production Scheduling Problems," reviews existing models to solve OPMPS+S and shows that a nonlinear-integer model provides …
-
An interdisciplinary approach to the prediction of pit lake water quality, Martha Mine pit lake, New Zealand
Lakes resulting from open pit mining may be potential water resources or potential environmental problems, depending on their water quality. As the global abundance of pit mines and pit lakes increases, there is increasing pressure on the mining industry to create pit lakes that have environmental, …
-
In-pit crushing and conveying as an alternative to an all truck system in open pit mines
The material transport system in an open pit mine significantly affects the capital and operating costs. All truck haulage is the most common and is a reliable and flexible transport system. On the other hand, this system is very expensive and can cost up to 50% of total mining costs. Its cost is …
-
Open Pit Mining Slopes: Special Stability Considerations
… in mining geotechnical engineering, as open-pits have slopes cut as steep as possible to ensure efficient mining. We must mine the ore while keeping the total waste to a minimum, aiming for a reasonable factor of safety (FS) and tolerable probability of failure (PoF). Therefore the safety …
-
Open pit limit analysis on a microcomputer
Includes bibliographical references.
-
Slope management for economic pit wall control
Includes bibliographical references.
-
Open-pit mine planning with operational constraints
Open-pit mines must be designed to develop the Earth’s natural resources in the most responsible, sustainable, and economic way. Traditional mine planning optimization methods do not consider operational constraints; such as minimum mining width or minimum pushback width constraints, and often do …
-
Interactive open-pit design using parameterization techniques
The standard approach to open pit design is to optimize the pit shape using the criterion of maximum total profit on the basis of a revenue block model of the orebody. There are some difficult problems inherent in such an approach. For example, scheduling and production rates will have a …
Page 1 of 103