Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 3 of 3 for “"Planned Shutdown"”
-
Continuous Oscillation: Vibrational Effects and Acceptable Frequency Ranges of Small Bore Piping in Field Applications
… Each incidence of these cracks causes a forced shutdown to perform repairs that cost millions of dollars. This type of failure is predominately seen in small bore piping, which has a nominal diameter of 2 inches and smaller. This thesis addresses the failure prediction analysis of small bore …
-
Sequential Decision-Making Models and Algorithms for Piping Maintenance Optimization
… preventive piping replacement is done during a planned shutdown, also known as a Turnaround, this policy considers making a preventive replacement decision two Turnaround cycles ahead. Most of the literature in this area considers maintenance activities executed in the time epoch of the …
-
Telemetrie a dispečerské řízení mřížové sítě nízkého napětí
Obsah diplomovej práce je úvod do problematiky mrežových sietí, spôsob dispečerského riadenia týchto sietí a popis technológie využitej v napájacích uzloch mrežových sietí mesta Brna. Ďalej sú v práci popísané nízkonapäťové rozvádzače použité v týchto mrežových sieťach. V práci je uvedený vývoj …