Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 101 for “"Planning period"”.
-
The effects of the loss of the middle school team planning period on student discipline, grades, achievement
… components of this philosophy is the common team planning period, which is in addition to the teacher's individual planning period. This planning period was designed to have team teachers meet together to discuss curriculum, students, and interdisciplinary units. The common team planning period …
-
Optimizing container retrieval operation at a port container terminal
… distance travelled by them. The concept of a planning period is introduced for models where theHungarian Algorithm and the Heuristic with Integer Enumeration are used.The planning period is defined as a time interval within which one canfind the optimal solution to the straddle assignment …
-
EXPOSURE ASSESSMENT OF CITIZENS TO TRAFFIC RELATED AIR POLLUTANTS IN A LONG-RANGE TRANSPORTATION PLAN
… performance metrics between the current time period and the end of the planning period, which is typically 30 years into the future. This evaluation method does not consider the performance of the plan during the planning period, a 30 year period or almost half a person’s lifetime. The …
-
A SYSTEM INTEGRATION AND OPTIMIZATION MODEL FOR FUEL MANAGEMENT AND SCHEDULING OF POWER GENERATORS
… to determine the optimal policy for the entire planning period. The final results are printed as a scheduling log along with the weekly or monthly summary of the unit scheduling, fuel inventory, fuel costs, capacity factor, and number of starts and trips for each unit. The computer program is …
-
Investigation of stochastic optimization methods for operating reservoirs with snowmelt-dominant local inflows and limited storage capability in British Columbia during the spring freshet
… through electricity trading over a short-term planning period. Project and watershed data, stochastic inflows, and estimated electricity prices are used to calculate optimal expected turbine release policies over a short-term planning period. Results are used to provide decision support to …
-
A polyperiod production-investment model of growth of large-size livestock farms in Southwest Virginia
A polyperiod model was developed for investigating production investment decisions associated with firm growth. A fifteen year planning horizon divided into three production periods was used. Initial resources were those of a large-size livestock farm (410 acres of open land) located in Southwest …
-
An application of decision theory to water quality management
… quality of the lake; (3) the need for long-term planning strategies so that the problem can be controlled and not just delayed. The technique provides the planners with a systematic procedure for evaluating the scientific data. It measures deterioration of the lake in non-economic units of …
-
Capacity Planning in a Discrete Item Manufacturing Environment
Capacity planning is a medium-to-long- term production planning tool that enables management to better understand how the demand of its customers have and will affect the available capacity planning. For a successful production and planning control system, management needs to consider the …
-
Interdisciplinary team organization: the distribution, structure, and important components of implementation in Virginia high schools
… who share the same students and have a common planning period. A stratified sampling was used to select 123 Virginia high schools of which 67 consented to participate in the study. All core subject teachers in each school were surveyed. The survey used Erb and Doda's (1989) model of four …
-
A decision model to evaluate cattle feeding alternatives
… the goal of maximizing profit over a specified period of time. The development and functioning of the model is the content of this thesis. In analyzing the problem of maximizing profits over time, it behooves the feeder to produce gain as efficiently and inexpensively as possible. Feed costs …
-
A dynamic input/output control system for job shop manufacturing operations
… The problem is modelled such that at periodic intervals, the best combination of input and output variables for the forthcoming period are identified. The purpose of the control system is to determine the set of jobs to be released into the shop (input variables) and the capacity …
-
The Use of Capacity and Inventory in a Rate-Based Planning and Scheduling System to Achieve Strategic Goals in Industrial Applications
… production variability.</p> <p>Current planning and scheduling systems do not produce a plan that minimizes fluctuations. If the schedule is frozen for several periods, they are slow to react to changes in demand, which eventually produces many changes in production and inventory (the …
-
Models and algorithms for hard optimization problems
… be assigned to several routes within the same planning period. The second variant considers the combination of the rst problem, without time windows, with a location problem. This means that the depots to be used must be selected from a set of available ones. For both of these variants, we …
-
The sensitivity of optimal value functions in differential inclusion problems
… II to treat free time problems, in which the planning period is a further choice variable. A brief discussion of controllability and an example from mathematical economics constitute Chapter IV.
-
Economic Considerations for Artificial Reef Development in Coastal Virginia
… used to forecast future benefits for a 15-year planning period. Future costs and benefits were converted to present values using three preselected discount rates. Projected benefits were greater than projected costs for all discount rates.
-
Data-Driven Optimization of Automated Speed Enforcement Logistics
… highest deterrence impact on speeding during a planning period. This study proposes a data-driven model to classify camera site locations based on the effectiveness of ASE enforcement. Then, a Markov decision process optimization model is presented to find the optimal camera locations at each …
-
Climate adaptation method for resilience of coastal communities over long time horizons
… reducing hurricane impacts within a defined planning period. The outcomes of resilience planning are presented in a novel and interpretable format, the Climate Adaptation Matrix (CAM), which links various levels of adaptation strategies to different climate change scenarios. The CAM enables …
-
A smart house energy management system
… computes better operating strategies over a planning period of time, and enables control of house resources. The smart house energy management system provides benefits for the good of utility and customer. In case of variable electricity rates, the management system can reduce the customer’s …
-
Strategic planning of electricity systems: Integrating renewable energies
… deal with problems in the scope of electricity planning. The continuous growth of renewable energy sources (RES) to generate electricity became sustainable over the last years. This growth is justified by the increasing concerns related to the security of supply, the reduction of external energy …
-
Going with the flow or swimming against the current?: The influence of rules and norms on advocacy strategies of NGO coalitions along the Mekong River
… and the Vietnam Rivers Network during the planning period for the dams in 2011-2013. <br/>The main findings of the study is that rules, norms, actors, biophysical and material conditions interact with each other in creating influence over advocacy strategies. Different patterns of …
Page 1 of 6