Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 18 of 18 for “"Power Purchase Agreement"”.

  1. Applications of Traditional and Concentrated Photovoltaic Technologies for Reducing Electricity Costs at Ontario Data Centers

    … tariff scenarios – time-of-use, feed-in tariff, power purchase agreement, and a peak-dependent electricity charge involving the province’s global adjustment fee – will be used to determine if there is a business case for using solar technology at data centers in Ontario to reduce energy costs. …

    ottawa-retro Repository record for Applications of Traditional and Concentrated Photovoltaic Technologies for Reducing Electricity Costs at Ontario Data Centers (opens in a new tab)

  2. Hydrogen production for a net zero refinery

    … storage, and an offshore wind farm with a power purchase agreement (PPA). The assessment focuses on achieving a net zero refinery in the year 2035. The model minimizes the total cost of investments and operation of CCS, and all technologies comprising the green system while meeting a …

    chalmers Repository record for Hydrogen production for a net zero refinery (opens in a new tab)

  3. Offtake Strategy Design for Wind Energy Projects under Uncertainty

    … the market risk exposure through a long-term Power Purchase Agreement (PPA). With Conditional Value-at-Risk (CVaR) introduced as a risk measure, this dissertation first develops two stochastic programming models for optimizing offtake designs under short and long-term strategies respectively. …

    maryland Repository record for Offtake Strategy Design for Wind Energy Projects under Uncertainty (opens in a new tab)

  4. Design and dispatch of concentrating solar power tower systems with utility-scale photovoltaics

    … thermal energy storage, concentrating solar power (CSP) can provide dispatchable, stable, and renewable electricity generation; however, current system capital costs are uneconomical for widespread deployment. Conversely, the costs of photovoltaic (PV) systems have dropped significantly in …

    colo-mines Repository record for Design and dispatch of concentrating solar power tower systems with utility-scale photovoltaics (opens in a new tab)

  5. Business Models for a Battery Electric Truck Manufacturer to Increase Customer Use of Renewable Electricity A Case Study of a Swedish Truck Manufacturer

    … which makes decreasing carbon emissions from powering the trucks a priority. Battery electric trucks have the potential of reducing total emissions significantly if they are charged with renewable electricity. Pursuing business models to increase customer use of renewable electricity would …

    chalmers Repository record for Business Models for a Battery Electric Truck Manufacturer to Increase Customer Use of Renewable Electricity A Case Study of a Swedish Truck Manufacturer (opens in a new tab)

  6. Marknadsdiffusion av solceller i Sverige

    … genom ett tredjepartsägandeskap, specifikt Power Purchase Agreement (PPA) och leasing. I rapporten används affärsmodeller som utgångspunkt för att bättre förstå varför vissa svenska företag och kommuner föredrar en lösning med tredjepartsägandeskap. Mot bakgrund i säljande företags …

    chalmers Repository record for Marknadsdiffusion av solceller i Sverige (opens in a new tab)

  7. Long-Term Power Purchase Agreements and the Benefits and Costs of Exported Electricity to Domestic Consumers in Ontario

    The purpose of this thesis is to interpret through an economic framework the debate within the public literature surrounding the benefits and costs of exported electricity from Ontario caused by payments to producers through procurement contracts and revenue regulation. When accounting for …

    guelph Repository record for Long-Term Power Purchase Agreements and the Benefits and Costs of Exported Electricity to Domestic Consumers in Ontario (opens in a new tab)

  8. The impact of the South African Renewable Energy Independent Power Producers Procurement Programme on South African communities: A case study

    … introduced the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP). The REIPPPP is a competitive bidding scheme and once independent power producers (IPPs) are appointed as preferred bidders a nonnegotiable, standardised and rand (ZAR)-dominated 20-year power purchase …

    cape-town Repository record for The impact of the South African Renewable Energy Independent Power Producers Procurement Programme on South African communities: A case study (opens in a new tab)

  9. Financial viability of offshore wind on the Texas Gulf Coast

    … to determine potential competitiveness in the Power Purchase Agreement (PPA) market in the ERCOT region. Results indicate that without significant cost reductions or major changes to either market conditions or federal/state incentive schemes, Texas Gulf Coast offshore wind cannot compete with …

    texas Repository record for Financial viability of offshore wind on the Texas Gulf Coast (opens in a new tab)

  10. Three essays on the economics of renewable energy in small island economies

    … future fossil fuel prices, negotiations of the power purchase agreement (PPA) price and wind capacity factor. In Chapter 2, we investigate the impacts of wind and solar renewable power sources on both electricity generation and planning by employing and applying a cost minimization model in …

    birmingham Download PDF for Three essays on the economics of renewable energy in small island economies (opens in a new tab)

  11. Strategic Fit of Solar Power Solutions for a Non-Electricity- Producing Company A Case Study of Liseberg AB

    … electricity supply becomes apparent. Solar power is one of several renewable electricity production methods, which is assessed as being suitable for NEP companies, both because of its relatively low cost, and its flexible applications. However, little guidance exists for NEP companies …

    chalmers Repository record for Strategic Fit of Solar Power Solutions for a Non-Electricity- Producing Company A Case Study of Liseberg AB (opens in a new tab)

  12. PHM-BASED PREDICTIVE MAINTENANCE SCHEDULING FOR WIND FARMS MANAGED USING OUTCOME-BASED CONTRACTS

    … using an outcome-based contract, specifically a Power Purchase Agreement (PPA), with multiple turbines indicating RULs concurrently can be analyzed. The predictive maintenance value for each wind turbine with an RUL indication depends on the operational state of all the other turbines, the amount …

    maryland Repository record for PHM-BASED PREDICTIVE MAINTENANCE SCHEDULING FOR WIND FARMS MANAGED USING OUTCOME-BASED CONTRACTS (opens in a new tab)

  13. Study of UPLAN based resources planning & analysis by power generation utilities in the deregulated electricity market

    … success of any generation utility. UPLAN Network Power Model provides a convenient way to model & simulate the different expected conditions related to transmission, fuel costs & other variables which are of significant importance for generation planning and also allows us to analyze the way the …

    texas Repository record for Study of UPLAN based resources planning & analysis by power generation utilities in the deregulated electricity market (opens in a new tab)

  14. Preliminary Cost and Economic Performance Assessment of Utility‐Scale Solar Photovoltaics at the Snohomish County, Washington’s Tulalip Tribes’ “Big Flats” Site

    … PV to be cost competitive with conventional power resources, without the aid of subsidies and incentives, at $0.06 per kilowatt-hour (kWh), or $1 per watt ($/W) (U.S. DOE, 2018 ). In this 2010-2017 period, a quick drop in levelized costs from $0.28 to $0.06 per kWh and an increase of …

    washington Repository record for Preliminary Cost and Economic Performance Assessment of Utility‐Scale Solar Photovoltaics at the Snohomish County, Washington’s Tulalip Tribes’ “Big Flats” Site (opens in a new tab)

  15. Financing Public Solar Projects: California Public Jurisdictions' Experiences in Acquiring and Financing Solar Photovoltaic Installations

    … obtain solar PVs. As an alternative to outright purchase, a promising financing option made available to jurisdictions in recent years is ownership by a third party, usually the solar company, including various forms of Power Purchase Agreements (PPA’s) and leasing. Due in part to state and …

    calpoly Repository record for Financing Public Solar Projects: California Public Jurisdictions' Experiences in Acquiring and Financing Solar Photovoltaic Installations (opens in a new tab)

  16. Modelling of input data uncertainty based on random set theory for evaluation of the financial feasibility for hydropower projects

    The design of hydropower projects requires a comprehensive planning process in order to achieve the objective to maximise exploitation of the existing hydropower potential as well as future revenues of the plant. For this purpose and to satisfy approval requirements for a complex hydropower …

    qucosa-diss