  1. Drilled Shaft Socket Connections for Precast Column in Seismic Regions

    … construction costs and traffic delays. Using precast bridge elements is one solution. However, achieving good connections between precast elements is challenging, particularly in seismically hazardous areas, like the Pacific Northwest, in which the largest forces are developed at the …

    washington Repository record for Drilled Shaft Socket Connections for Precast Column in Seismic Regions (opens in a new tab)

  2. Development and validation of a precast column solution for Texas bridges

    … examines a novel construction method utilizing Precast Prestressed Concrete Piles (PCP) filled with concrete cast-in-place, working as one complete column to evaluate their structural performance under varying levels of eccentricity, with the goal of introducing a new precast column system. A …

    texas Repository record for Development and validation of a precast column solution for Texas bridges (opens in a new tab) Embargoed until 2028-05-01

  3. Precast Column-Footing Connections for Accelerated Bridge Construction in Seismic Zones

    … main components; testing of five large-scale precast reinforced concrete column models, a series of individual component tests on mechanical reinforcing bar splices, and extensive analytical studies. Column studies included the design and construction of five half-scale bridge column models …

    unr Repository record for Precast Column-Footing Connections for Accelerated Bridge Construction in Seismic Zones (opens in a new tab)

  4. INNOVATION IN RIGID JOINTS BETWEEN COMPOSITE BEAM TO PRECAST COLUMN FOR RAPID ASSEMBLY – CONSTRUCTION PRODUCTIVITY ANALYSIS

    … productivity of the proposed Reinforced Concrete column and Steel beam (RCS) system for rapid assembly, in comparison to conventional beam-column connection systems. The thesis covers the following: (i) describe and document the Manufacturing Technique and Assembly Sequence (MTAS) for the proposed …

    nus Repository record for INNOVATION IN RIGID JOINTS BETWEEN COMPOSITE BEAM TO PRECAST COLUMN FOR RAPID ASSEMBLY – CONSTRUCTION PRODUCTIVITY ANALYSIS (opens in a new tab) Download file for INNOVATION IN RIGID JOINTS BETWEEN COMPOSITE BEAM TO PRECAST COLUMN FOR RAPID ASSEMBLY – CONSTRUCTION PRODUCTIVITY ANALYSIS (opens in a new tab)

  5. Shifted Plastic Hinge Column Connections Using Grouted Sleeves for Accelerated Bridge Construction

    … tolerances and load transfer between precast elements. However, previous research identified some performance issues with precast columns employing GS connections for seismic regions. Therefore, there is a need to develop improved connection details. This research consists of three …

    ucf Repository record for Shifted Plastic Hinge Column Connections Using Grouted Sleeves for Accelerated Bridge Construction (opens in a new tab)

  6. Ultra-High Performance Concrete for Precast Seismic Bridge Column Connection

    … seismic regions remain limited, particularly for precast columns where connections typically coincide with plastic hinge (PH) regions. Ultra-high performance concrete (UHPC), characterized by high compressive and tensile strength, and superior bond properties, is a potential material that can …

    ucf Repository record for Ultra-High Performance Concrete for Precast Seismic Bridge Column Connection (opens in a new tab)

  7. Mechanically Spliced Precast Bridge Columns

    … though mechanical bar splices can be used as new precast column connections to accelerate the bridge construction (ABC), The use of bar couplers in the plastic hinge region of bridge columns is prohibited by the current US codes since the effects of bar couplers on the seismic behavior of columns …

    sdstate Repository record for Mechanically Spliced Precast Bridge Columns (opens in a new tab)

  8. Analytical investigation of precast columns for bridge substructures

    … (FEA) results of entirely cast-in place (CIP) column, and precast columns subjected to flexural analysis with different eccentricity loading rates, in ATENA 3D software. Precast columns can be a viable part of Accelerate Bridge Construction (ABC) approach as the construction process can be …

    texas Repository record for Analytical investigation of precast columns for bridge substructures (opens in a new tab)

  9. Simplifying Cast-in-Place Joint Design Using ABC Pocket Connection Details in High Seismic Regions

    Accelerated bridge construction (ABC) utilizes precast members to minimize on-site construction time, making it an appealing alternative to conventional cast-in-place (CIP) construction. The connections between these precast members are crucial as they must maintain structural integrity, and in …

    unr Repository record for Simplifying Cast-in-Place Joint Design Using ABC Pocket Connection Details in High Seismic Regions (opens in a new tab)

  10. Seismic performance of prefabricated bridge piers supported on pile foundations

    … for seismic regions. A pier system consisting of precast column, precast pile cap, and pile foundation was developed. For this system, the prefabricated components are integrally connected utilizing column socket connection and pile pocket connections that are preformed in the pile cap with …

    iastate Repository record for Seismic performance of prefabricated bridge piers supported on pile foundations (opens in a new tab)

  11. Non-Proprietary UHPC for Anchorage of Large Diameter Column Bars in Grouted Ducts

    … time. A non-coupled plunged, also referred to as precast column with no couplers (PNC), detail for column to footing and column to cap connections using ducts filled with ultra-high performance (UHPC) has been demonstrated as an effective connection for seismic applications. To expand the use of …

    unr Repository record for Non-Proprietary UHPC for Anchorage of Large Diameter Column Bars in Grouted Ducts (opens in a new tab)

  12. Next Generation of Bridge Columns for Accelerated Bridge Construction in High Seismic Zones

    … was to develop new ABC connections for bridge columns using novel detailing and advanced materials. Three low-damage materials were incorporated: ultra-high performance concrete (UHPC), Nickel-Titanium shape memory alloy (NiTi SMA), and engineered cementitious composite (ECC). Furthermore, two …

    unr Repository record for Next Generation of Bridge Columns for Accelerated Bridge Construction in High Seismic Zones (opens in a new tab)

  13. Addressing Seismic and Serviceability Challenges of Precast Bridge Systems Under Climate Change and Emerging Transportation Technologies

    … tackles the multifaceted challenges faced by precast bridge elements and systems (PBES) under both service and extreme load conditions. It focuses on two distinct PBES substructures: emulative piers, which replicate the behavior of cast-in-place structures, and non-emulative piers, which use …

    mcmaster Repository record for Addressing Seismic and Serviceability Challenges of Precast Bridge Systems Under Climate Change and Emerging Transportation Technologies (opens in a new tab)

  14. Experimental and Analytical Seismic Studies of Bridge Piers with Innovative Pipe Pin Column-Footing Connections and Precast Cap Beams

    … reduce the moment transfer between the column and footing, and 2) pocket connections to provide structural continuity at column-cap beam joints. The pipe pin consists of two steel pipes to transfer shear and a tension member to transfer uplift forces. Pocket connection is formed by …

    unr Repository record for Experimental and Analytical Seismic Studies of Bridge Piers with Innovative Pipe Pin Column-Footing Connections and Precast Cap Beams (opens in a new tab)

  15. Seismic Performance of Bridge Column-Pile-Shaft Pin Connections for Application in Accelerated Bridge Construction

    … or "pin" connections may be used to connect columns to pile-shafts to reduce the overall force demand in the integral bridges, leading to smaller and more economical foundations. Additionally, prefabrication of structural elements facilitates accelerated bridge construction (ABC), which could …

    unr Repository record for Seismic Performance of Bridge Column-Pile-Shaft Pin Connections for Application in Accelerated Bridge Construction (opens in a new tab)

  16. Seismic Response of Precast Bridge Columns with Energy Dissipating Joints

    … delays and construction site safety risk. Precast bridge components are an essential for ABC to succeed. However, knowledge of the behavior and performance of precast bridge columns and their connections during earthquakes is lacking, and consequently their widespread use in high seismic …

    unr Repository record for Seismic Response of Precast Bridge Columns with Energy Dissipating Joints (opens in a new tab)