Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 11 of 11 for “"Precast Girder"”.

  1. Integral precast girder-to-cap connections for accelerated bridge construction in seismic regions

    … demand placed on our nation's highway system. Precast concrete is a common way to incorporate ABC techniques. Advantages over typical cast-in-place concrete methods include speed of field construction, improved quality control, and decrease in detoured traffic during construction, among others. …

    iastate Repository record for Integral precast girder-to-cap connections for accelerated bridge construction in seismic regions (opens in a new tab)

  2. Seismic performance of accelerated bridge construction (ABC) precast bulb-tee girder-to-bent cap connection

    … Bridge Construction (ABC) techniques using the precast components are beneficial to effectively repair and replace the deficient bridges by reducing the period of onsite construction and improving the construction quality. However, the knowledge gap regarding the seismic performance of …

    iastate Repository record for Seismic performance of accelerated bridge construction (ABC) precast bulb-tee girder-to-bent cap connection (opens in a new tab)

  3. Transverse Sub-Assemblage Testing of the Inverted-T Bridge System

    … bridge construction technique that consists of precast inverted-T girders placed adjacent to one another and covered with a cast-in-place deck. This system was first implemented in the U.S. by the Minnesota Department of Transportation (Mn/DOT). This research focuses on improving the …

    vt Repository record for Transverse Sub-Assemblage Testing of the Inverted-T Bridge System (opens in a new tab)

  4. Design of Continuous Prestressed Concrete Spliced Girder Bridges

    Traditionally, prestressed concrete girder bridges are limited to 150 ft span lengths in Texas due to restrictions on handling and transportation. An effective way of increasing span lengths of precast, prestressed concrete girder bridges is demonstrated using splicing technique. In spliced girder …

    tamu Repository record for Design of Continuous Prestressed Concrete Spliced Girder Bridges (opens in a new tab)

  5. Field Evaluation of Transverse Post-Tensioning and Latex Modified Concrete on Bridge Load Distribution

    … In addition to a field evaluation, LMC-topped girders were tested to flexural failure to determine the improvement LMC may have on flexural capacity. Field testing revealed that the use of a PT only retrofit improved load distribution on interior girders by over 24.8% compared to the initial …

    clemson Repository record for Field Evaluation of Transverse Post-Tensioning and Latex Modified Concrete on Bridge Load Distribution (opens in a new tab)

  6. Seismic analysis of a steel-concrete composite, integral-pier bridge

    … The use of integral piers with steel-girder bridges rather than their concrete, precast-girder counterparts decreases the mass and seismic loads on the structure, further decreasing the susceptibility of the bridge to damage from seismic events. However, research conducted to date on …

    iastate Repository record for Seismic analysis of a steel-concrete composite, integral-pier bridge (opens in a new tab)

  7. Performance of GFRP headed-end bars as interface shear friction reinforcement

    … where shear transfer between prestressed precast girder and cast-in-place slab is vital for composite action. While the interface shear transfer mechanism (IST) of steel-RC joints has been well-established and forms the basis of current design standards, limited research has explored the …

    manitoba Repository record for Performance of GFRP headed-end bars as interface shear friction reinforcement (opens in a new tab)

  8. Seismic performance of an I-girder to inverted-T bent cap bridge connection

    … seismic response and overall moment capacity of precast I-girder to inverted-T bent cap bridge connections for seismic applications. The current design practice, as outlined by Caltrans' Seismic Design Criteria, assumes that the connection between the precast I-girders and the inverted-T bent cap …

    iastate Repository record for Seismic performance of an I-girder to inverted-T bent cap bridge connection (opens in a new tab)

  9. Interface Shear Strength in Lightweight Concrete Bridge Girders

    Precast girders and cast-in-place decks are a typical type of concrete bridge construction. A key part of this type of construction is developing composite action between the girder and deck. In order to develop composite action, adequate horizontal shear resistance must be provided at the …

    vt Repository record for Interface Shear Strength in Lightweight Concrete Bridge Girders (opens in a new tab)

  10. In-Span Splicing for Continuous Prestressed Concrete Girder Bridges

    … In-span splicing of prestressed concrete girders to extend span length of bridges have been effectively used in several recent bridge construction projects. However, the extent and limitation of such a construction approach, as well as associated analysis and design challenges have not …

    tamu Repository record for In-Span Splicing for Continuous Prestressed Concrete Girder Bridges (opens in a new tab)

  11. Montovaná konstrukce autosalonu

    Předmětem diplomové práce je návrh nosné montované konstrukce budovy, která bude sloužit jako administrativní budova a předváděcí plocha (showroom) pro automobilku. Dále budou dimenzovány a posouzeny některé hlavní nosné dílce této konstrukce. Pro tyto dílce potom budou provedeny podrobné výkresy …

    brno-tech Repository record for Montovaná konstrukce autosalonu (opens in a new tab)