Continuity development between precast beams using prestressed slabs, and its effect on flexure and shear
Development of continuity between precast prestressed bridge girders by post-tensioning the insitu top slab In the regions of hogging moment is a relatively new technique which forms the basis for this research study. Compared to the more conventional method of using reinforcing steel in the slab …
-
Shear transfer between precast prestressed bridge beams and in-situ concrete crosshead in continuous structures
… was made to study the shear transfer between precast prestressed beams and in-situ concrete in a relatively new method of construction of continuous bridge decks where the ends of precast beams are connected to an integral in-situ crosshead away from the supports. Two series of tests were …
-
Full-depth precast concrete bridge deck system: phase II
… Transportation (MnDOT) developed a design for a precast composite slab span system (PCSSS) to be used in accelerated bridge construction. The system consists of shallow inverted-tee precast beams placed between supports with cast-in-place (CIP) concrete placed on top, forming a composite slab …
-
Refinement of the Inverted T-Beam Bridge System for Virginia
The inverted T-beam bridge system is a bridge construction technique that follows accelerated bridge construction processes. The system was discovered in France and first adopted in the U.S. by the Minnesota Department of Transportation. In 2012 the system was modified and adopted by Virginia, with …
-
Behavior of a six-story office building under moderate seismicity
… under the auspices of the U.S.-Japan coordinated Precast Seismic Structural Systems (PRESSS) Phase II program. Primary objectives of the research are to investigate the behavior of a mid-rise precast office building under moderate seismicity and to develop design recommendations for similar …
-
Development of a Composite Concrete Bridge System for Short-to-Medium-Span Bridges
The inverted T-beam bridge system provides an accelerated bridge construction alternative for short-to-medium-span bridges. The system consists of adjacent precast inverted T-beams finished with a cast-in-place concrete topping. The system offers enhanced performance against reflective cracking, …
-
Live Load Distribution Factors and UHPC Shear Key Performance of SCDOT NEXT D Beam and Solid Slab Bridges
… utilizes both hollow core and solid slab precast concrete span bridge sections. The intended advantages of these bridge sections were that they could be built according to an accelerated bridge construction (ABC) schedule and have increased durability. Increasing a bridge's durability has …
-
Modified NEXT-D Beam Bridge --- Experimental and Simulation Evaluation of Shear Key Performance and Development of a Design Strategy of the Superstructure
… Carolina, the Northeast Extreme Tee (NEXT) D beam system, proposed by the Precast/Prestressed Concrete Institute Northeast (PCINE), was identified to be a promising alternative to the cast-in-place (CIP) flat bridge that has been widely used in the state. In order to accommodate a span length …
-
Nadjezd ulice Hlavní ve Frýdku-Místku
Předmětem bakalářské práce je návrh nadjezdu ulice Hlavní ve Frýdku-Místku. Hlavní náplni je statický výpočet nosné konstrukce o jednom poli. Byli zpracované dvě studie a druhá varianta s předem předpjatých prefabrikovaných nosníku VSTI2000 byla vybraná. Nosníky jsou 18 metru dlouhé a jsou spřažené …