Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 2 of 2 for “"Prefabricated Deck Panels"”
-
Toward Successful Implementation of Prefabricated Deck Panels to Accelerate the Bridge Construction Process
… the technologies for pre-fabricated bridge decks are relatively mature. However, this technology has not been incorporated in Nevada. The goal of this research project is to develop design guidelines and specifications on the use of pre-fabricated bridge decks for Nevada based on existing …
-
Evaluate the performance of closure joints for side-by-side accelerated bridge construction (ABC) superstructure systems by using field instrumentation methods
… disruptions and construction time by utilizing prefabricated elements and systems. In order to provide continuity between these prefabricated elements, a connection known as a closure joint must be used. Closure joints are critical in ABC and help transfer shear and moment between prefabricated …