Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 118 for “"Prestressed concrete bridge"”

  1. Behavior of Prestressed Concrete Bridge Girders

    … prestress losses were monitored in six HPC bridge girders. These measured losses were compared to predicted losses according to four sources. Prestress loss predictive methods considered for this research were: 1- AASHTO LRFD 2004, 2- AASHTO LRFD 2004 Refined, 3- AASHTO LRFD 2007, and 4- …

    utahstate Repository record for Behavior of Prestressed Concrete Bridge Girders (opens in a new tab)

  2. Seismic Design of a Prestressed Concrete Bridge

    … this thesis is to examine dynamic responses of bridges in seismic activity with the help of such tool as CSi Bridge. Therefore, throughout this study, a prestressed concrete bridge model will be thoroughly designed. In the first section, the required materials and structural components will be …

    uno Repository record for Seismic Design of a Prestressed Concrete Bridge (opens in a new tab)

  3. Repair of prestressed concrete bridge girders for shear

    This item was digitized as part of a project to share McGill's intellectual legacy with the public. If you are the copyright holder or a relative of the copyright holder who is deceased, you may request withdrawal by emailing escholarship.library@mcgill.ca. The full policy for eScholarship may be …

    mcgill Repository record for Repair of prestressed concrete bridge girders for shear (opens in a new tab)

  4. Self-consolidating concrete for precast, prestressed concrete bridge elements

    … for the use of self-consolidating concrete (SCC) in precast pretensioned bridge girders. The test specimens had an overall length of 31 ft (9.4m) with a center-to-center span of 29 ft (8.8m). They were cast in four batches with different concrete attributes: two non air-entrained …

    mcgill Repository record for Self-consolidating concrete for precast, prestressed concrete bridge elements (opens in a new tab)

  5. Serviceability criteria for decompression in prestressed concrete bridge girders

    … allowing the designer to create a better bridge that will last longer. The objective of this study is to identify the load and resistance parameters, develop analysis procedure to estimate the number of decompressions and corresponding reliability, and formulate a basis for the analysis …

    nebraska Repository record for Serviceability criteria for decompression in prestressed concrete bridge girders (opens in a new tab)

  6. Anchorage-controlled shear capacity of prestressed concrete bridge girders

    … the anchorage controlled shear capacity of prestressed concrete bridge girders was in this research studied in two distinct ways, experimentally and analytically. The results of this research are an important step towards improving understanding of strand anchorage related issues. For the …

    texas Repository record for Anchorage-controlled shear capacity of prestressed concrete bridge girders (opens in a new tab)

  7. Anchorage of shear reinforcement in prestressed concrete bridge girders

    … the tension zone as transverse reinforcement in prestressed concrete bridge girders. With the straight legs of the U-shaped stirrups anchored into the bottom flange of the girders, this configuration is readily placed after stressing the prestressing strands. American Concrete Institute (ACI) and …

    umn Repository record for Anchorage of shear reinforcement in prestressed concrete bridge girders (opens in a new tab)

  8. Bearing Zone Cracking of Precast Prestressed Concrete Bridge Girders

    … techniques on the bearing ends of precast prestressed concrete bridge girders. The five techniques were the following: an oil coated surface, embedded steel plate with an oil coated surface, embedded steel angle with an oil coated surface, teflon pad, and a wax lubricant.

    gatech Repository record for Bearing Zone Cracking of Precast Prestressed Concrete Bridge Girders (opens in a new tab)

  9. Structural Assessment of 50-year-old Prestressed Concrete Bridge Girders

    L'abstract è presente nell'allegato / the abstract is in the attachment

    poli-torino Repository record for Structural Assessment of 50-year-old Prestressed Concrete Bridge Girders (opens in a new tab)

  10. Repair of damaged prestressed concrete bridge girders using cementitious materials

    Prestressed concrete bridge girders are used widely across the United States. These girders often face damage at the beam-ends caused by corrosion from water and contaminants from the roadways above. In this project, alternative methods for the repair of the beam-end region are studied through …

    iastate Repository record for Repair of damaged prestressed concrete bridge girders using cementitious materials (opens in a new tab)

  11. Improving predictions of instantaneous camber for prestressed concrete bridge girders

    … prediction of long-term camber in precast prestressed concrete beams (PPCB) creates discrepancies in bridge construction which results in increased costs and construction challenges. Although emphasis is placed on erection and long-term camber, these challenges have been found to originate …

    iastate Repository record for Improving predictions of instantaneous camber for prestressed concrete bridge girders (opens in a new tab)

  12. Improving Predictions for Camber in Precast, Prestressed Concrete Bridge Girders

    Most of the modern medium-span bridges in the United States are constructed with precast, prestressed concrete girders. An accurate estimate of girder camber is important for all parties involved in the precast concrete industry for several reasons. The most important reason is that achieving …

    washington Repository record for Improving Predictions for Camber in Precast, Prestressed Concrete Bridge Girders (opens in a new tab)

  13. Dynamic response and impact effects in precast, prestressed concrete bridge ties

    This item was digitized as part of a project to share McGill's intellectual legacy with the public. If you are the copyright holder or a relative of the copyright holder who is deceased, you may request withdrawal by emailing escholarship.library@mcgill.ca. The full policy for eScholarship may be …

    mcgill Repository record for Dynamic response and impact effects in precast, prestressed concrete bridge ties (opens in a new tab)

  14. Shear and Flexural Capacity of High Strength Prestressed Concrete Bridge Girders

    … Orem, Utah is made up of two separate three span bridges. The bridges were originally constructed in 1960 and were expanded in 2004 to accommodate for one extra lane per bridge. During the fall of 2012 both bridges were scheduled for demolition and four girders were salvaged from the southernmost …

    utahstate Repository record for Shear and Flexural Capacity of High Strength Prestressed Concrete Bridge Girders (opens in a new tab)

  15. Optimization of prestressed concrete bridge ties for open deck railway bridges

    concordia

  16. Analytical Modeling of the Repair Impact-Damaged Prestressed Concrete Bridge Girders

    Highway bridges in the United States are frequently damaged by overheight vehicle collisions. The increasing number of prestressed concrete bridges indicates that the probability of such bridges being impacted by overheight vehicles has increased. This thesis, sponsored by the Virginia Center for …

    vt Repository record for Analytical Modeling of the Repair Impact-Damaged Prestressed Concrete Bridge Girders (opens in a new tab)

  17. Enhancement of service life of prestressed concrete bridge girders using FRP composites

    Cette recherche vise à améliorer la durée de vie des poutres de pont en béton précontraint à l'aide de coquilles de composite de polymères renforcés de fibres (FRP) appliquées à la semelle inférieure pour empêcher l'infiltration d'éléments nocifs dans le béton. La coque en FRP permettrait de …

    mcgill Repository record for Enhancement of service life of prestressed concrete bridge girders using FRP composites (opens in a new tab)

  18. Effect of Temperature on Prestressed Concrete Bridge Girder Strand Stress during Fabrication

    … has reported erection cambers of many prestressed concrete bridge girders that were much lower than anticipated. A previous University of Minnesota study (O’Neill and French, MN/RC 2012-16) attributed the discrepancies to inaccurate estimates of the concrete strength and stiffness at …

    umn Repository record for Effect of Temperature on Prestressed Concrete Bridge Girder Strand Stress during Fabrication (opens in a new tab)

  19. Design and Construction Integration of a Continuous Precast Prestressed Concrete Bridge System

    … is presented. The proposed precast elevated UFS bridge system is analyzed for the operational vehicular loading as provided by TTI and a number of design alternatives for the various bridge components are provided. This includes: the design of the fully precast deck panels for long continuous …

    tamu Repository record for Design and Construction Integration of a Continuous Precast Prestressed Concrete Bridge System (opens in a new tab)

Page 1 of 6