Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 5 of 5 for “"Proactive scheduling"”.
-
Adaptive Scheduling Systems: A decision-theoretic approach
… generated. This thesis proposes an adaptive scheduling system based on decision theory. Influence diagram is used as the main modeling tool in the approach. It facilitates the inclusion of all possible variables that influence the current shop-floor conditions into a single framework and also …
-
Proactive methods to maximize mmWave WLAN performance
… in this dissertation, we focus on using proactive approaches to mitigate potential network outage caused by dynamic blockages. Our approach thus far consists of two aspects. The first part considers maximizing signal coverage in the the spatial aspect in the interior planning phase after …
-
Including Childhood Disability in School Transportation Planning: A Study of Family Work and Practitioner Perspectives
… a student-centred and inclusive approach, with proactive scheduling and thoughtful route design that reflects the diverse realities of students’ experiences. Greater attention to accessibility from the outset, supported by targeted training for transportation planners, can help create more …
-
Probabilistically Robust Continuous-time Multi-Agent Path Finding Dynamic Risk Allocation and Chance-Constrained Planning under Execution Uncertainty
… maintaining predictable throughput by enabling proactive scheduling instead of reactive halting. To accurately model execution uncertainty, the proposed approach uses Gaussian distributions bounded by strict kinematic hardware limits. Instead of bounding maximum delays, the proposed approach …
-
Analysing the business impact of vertical roller technology in the mining sector
… of predictive maintenance is simply to warrant proactive scheduling of remedial work and prevent unexpected equipment downtime. Accurate results can only be obtained when the equipment is running. This can be achieved by connecting sensors to the equipment to record operating metrics such as …