Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 8 of 8 for “"Production scheduling. Computer simulation."”
-
An evaluation of dispatching, due date, labor assignment, and input control policy decisions in a dual resource constrained job shop
… as well as machinery. The majority of job shop scheduling research has assumed that labor was always available to process any job. This assumption does not portray the actual environment of most job shops. In reality, not all machines can be manned simultaneously, and labor is both a flexible …
-
The effect of labor force reduction on work in process inventory, product cycle time, and product throughput in flexible job shops
… facility. Thus, the importance of developing a simulation model that can be used to study the effects of reduced labor on operator utilization, product throughput, product cycle time, and WIP inventory levels becomes clear. In order to explore the effect that labor reduction has on specific …
-
Strategic planning of long term production schedule using 4D network relaxation method
Includes bibliographical references (pages 218-219).
-
Open pit mine production scheduling
Includes bibliographical references.
-
Comparative analysis of open pit mine scheduling techniques for strategic mine planning of a copper mine in southern Peru
Includes bibliographical references (pages 236-238).
-
Automated user friendly implementation of an optimum open pit production scheduling algorithm
Includes bibliographical references (pages 76-78).
-
Conceptual study of open pit transition depth determination through comparative analysis of open pit and underground mine production scheduling at Kibali gold mine in DRC, Africa
… process by optimizing the life of the mine production of both the open pit and underground combined. A series of pits are generated by constraining the Lerchs and Grossmann algorithm by the elevation using Whittle software. The underground mining lodes and stopes are sequenced using CAE's …