Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 37 for “"Program Budget"”.
-
A program budget model for selected school programs in the province of Ontario
… the reasons for the current trend of introducing program budgeting into the public sector. A framework of criteria was identified within which a model could be developed. The purpose of the study was to develop a model program budget which could be used by school boards in the Province of Ontario …
-
Congress and the Navy Budget : the impact of the budget process on the FY 1990 Navy Program Budget
… is to study the impact of the Congressional Budget process on the Department of the Navy (DoN) fiscal year 1990 budget. The thesis focuses on four specific events that took place during the FY 1990 budget process. These four events are (1) the actions of the Authorizing and Appropriating …
-
A study into the origins and nature of performance and program budgeting
Performance budgeting has been a by-word within the Department of Defense for over ten years. It was proposed as a means of finding out what was done with the money expended for military programs. The program budget is now being introduced in order to achieve this same purpose. This study sought to …
-
A Budgetary Look At Public Health In New Mexico
… has shown that the traditional agency line-item budget does not serve as a tool for making rational decisions about state government because it does not present the appropriate information needed by the decision-makers. To make rational decisions and policies, the Governor and the Legislature …
-
An analysis of government furnished material (GFM)--in new construction ships.
… and provides regression models for use in program budget formulation and execution. The discussion includes the criteria for determining contractor versus government furnished equipment and material. The report also presents the results of a test case involving the transfer of parts …
-
The effects of the Comprehensive School Improvement Process on gifted and talented programming in Iowa as perceived by middle level principals and teachers
… (CSI) Process, for Gifted and Talented (GT) Programming in Iowa. The study examined the assumption that mandates lead to internal changes in schools, increased collaboration among various groups, and improved school programs. Based on the mandated provisions of the Iowa Administrative Code, …
-
Management control systems in not-for-profit organizations: a case study
… system utilizing tailored output measures and a program budget structure.
-
Valstybės biudžeto programų vertinimo modelis /
The method of budget expenditures distribution directly influences on results of state government resources. Recently the program budget is used more often, all other modified distribution models of budget expenditures as well. Analysing the scientific literature, the different analytic …
-
Aviation depot level repairable carcass tracking and billing: the effect of the two price system on budgeting and flying hour cost reporting
… hour costs result in inaccurate flying hour program budget requests. This thesis also explored the feasibility of a two price/one bill system of charging for AVDLRs which has often been proposed as a solution to the problem mentioned above. The conclusion reached is that the problems with the …
-
Program budgeting to improve decision making and resource planning in Estonian Defense
The thesis examines the linkage between budgeting, budget structure and decision making, discusses different functions a budget must fulfill and identifies criteria a budget structure should meet to support rational decision making. An examination of the most common budgeting approaches and the …
-
Identifying the Essential Reliability, Availability, and Maintainability Tasks for Aerospace Systems
… tasks to apply towards smaller aerospace programs. Though the report is specifically focused on aerospace projects, these essential RAM tasks and principles can be applied across all types of complex systems that require a high level of reliability. Methods of analysis were primarily …
-
Viešųjų programų ir projektų valdymas įgyvendinant jaunimo politiką Lietuvoje /
… of Master‘s analyses the management of public programmes and projects‘ while implementing the Youth Policy in Lithuania. On purpose to clarify the programmes and projects‘ management efficiency, this study discusses the main aspects of programmes, projects, programming management theoretical …
-
Forecasting workload for Defense Logistics Agency distribution
… used instead of the current model for recent Program Budget Review (PBR) cycles. Our results suggest that an auto-regressive integrated moving average (ARIMA) model used with critical assessment and managerial judgment offers a viable alternative to the current model for predicting …
-
NPS CubeSat Launcher program management
… experience, and results of managing the NPSCuL program, including the program budget and schedule in support of a flight opportunity as early as August 2010. NPSCuL is designed to utilize excess capacity on U.S. launch vehicles to place a significant volume of CubeSats into orbit in a single …
-
Maintenance trend analysis of air conditioning systems for ship operations in the Arabian Gulf
In December 2000, Program Budget Decision (PBD) 096 changed the way the Department of the Navy (DoN) budgets for Arabian Gulf operations. The cost of operations is now required to be submitted as part of the annual budget vice funded as contingency operations. In order to justify increased funding …
-
At the Confluence of Citizen Monitoring and Government Regulation: Opportunities to Increase Monitoring and Improve Environmental Management
… monitoring has been conducted and the annual program budget, with government use of Citizen Monitoring data. Likewise this study found that data quality was not associated with government use of Citizen Monitoring data. By contrast, the monitoring purpose as defined by the CM program, where it …
-
A conceptual methodology for assessing acquisition requirements robustness against technology uncertainties
The lack of system capability, budget, and schedule robustness against technology performance and development uncertainties has led to major setbacks in recent acquisition programs. This lack of robustness stems from the fact that immature technologies have uncertainties in their expected …
-
Inclusive Musical Theatre in Music Therapy Clinical Practice: A Conceptual Framework
… arts manager (n = 1), and a community theatre program director (n = 1). Information gathered during a survey, examination of materials, and semi-structured interviews was used to design a six-phase conceptual framework. Results revealed similarities between participants’ composition and …
-
An analysis of Aviation Depot supply support
… of the Secretary of Defense (OSD) issued a Program Budget Decision (PBD) requesting a study of supply material availability (SMA) and related issues for Naval Aviation Depots (NADEPs). PBD-405 shows a disparity between percentage levels of supply support for the NADEPs and the current …
-
State-Sponsored Agriculture Promotion Programs: Growing Brands
… through a state-sponsored agriculture promotion program. These programs seek to increase consumer awareness of and demand for in-state products, and developing an umbrella brand for promotion is key to this mission. The purpose of this research is to describe the inputs and strategies that …
Page 1 of 2