CONSTRUCTION PROGRESS MEASUREMENT USING DEEP LEARNING
Failing to keep track of the construction progress in time and making current construction progress falling behind the schedule will cause a significant loss of time and money. Monitoring the progress of the constructing structure in construction sites is one of the significant challenges today. …
-
Linked Data Quality Assessment and its Application to Societal Progress Measurement
In recent years, the Linked Data (LD) paradigm has emerged as a simple mechanism for employing the Web as a medium for data and knowledge integration where both documents and data are linked. Moreover, the semantics and structure of the underlying data are kept intact, making this the Semantic Web. …
-
Semi automatic construction progress measurement using a combination of CAD modelling, photogrammetry and construction knowledge
… solutions to monitor and visualise construction progress. Photogrammetric measurements offer reliable results at the cost of more human intervention. This approach offers the possibility of using a hand held camera as a measurement tool. This method also offers complete independence from reliance …
-
Project Controls for Engineering Work in Practice
… the relationship between cost, schedule and progress. This research aims to improve project control of engineering work in practice by adapting Earned Value Management (EVM) techniques used in construction to the requirements of engineering work. Techniques for EVM baseline development and …
-
Measuring global progress towards a transition away from mercury use in artisanal and small-scale gold mining
… the demonstration of credible, continuous progress to secure political support and financing, and ultimately achieve success. Focused progress measurement has been lacking to date for ASGM at the global level. This research analyses information on appropriate options to measure mercury …
-
A Virtual Haptic Motor Rehabilitation System
… to configure each exercise. We designed a progress measurement component for automated advancements without requiring an occupational therapist to analyze performance results. An LSR Analyzer normalizes the raw sensor values read from the Immersion CyberGlove, for better sensor readings to …
-
Project failures : a comparative study of information and communication technologies (ICT) and construction projects
… industry might be better off by comparing its progress against that already made by the construction industry, an industry involved in projects with similar characteristics such as complex relationships, detailed information and long delivery periods over many phases. A framework demonstrating …
-
Trending and forecasting in construction operations
This research aims to understand the process of progress reporting and forecasting project status of different future targeted dates. The study focuses mainly on trending and time/Cost control of engineering, procurement and construction (EPC) project. A field study of the practices of the …
-
All Learnings: um nova abordagem para o ensino de idiomas para adultos focada na aquisição de competências sociocomunicativas
… learning, and methods that allow for practical progress measurement, adapting to various contexts and individual needs. The characteristics of this group are often overlooked by traditional methodologies and online courses, which tend to focus on rigid grammatical elements or lack a clear …
-
Quality integrated earned value management for construction projects
… EVM (Earned Value Management). EVM is a powerful progress measurement method, integrating cost, schedule and scope successfully. However, the EVM method lacks one of the major components of the iron triangle, namely the quality component. Thus, this study aims to develop a framework which enables …
-
Computerized site documentation of public sector construction projects
… is to improve the ability of owners to monitor progress on and manage the site documentation of construction projects. Public agencies in particular often collect exhaustive site data which is used for such on-site purposes as decision-making and reporting, as well as serving claims support and …
-
Integrated Project Management Framework for a Pipe Spool Fabrication Shop
… the labour costing system and the production progress control system. Experiments were conducted inside the fabrication shop of a partner company in order to evaluate the potential and limitations of the proposed research framework. The proposed system is not only able to automatically track …
-
Automated data acquisition for tracking and control of construction projects
… accordingly, for generating period-by-period progress reports. These reports are commonly developed by essentially comparing the collected actual data pertinent to work performed on site to that planned. The objectives of this research thesis are to study and analyze the characteristics of …
-
Analytical Framework for Field Positioning and Work Planning for a Backhoe Excavator
… construction project depends on proper planning, progress monitoring and adaptation to the continually changing complex situations in the field. Efficient remote tracking of multiple disparate resources and establishing the collaboration and coordination between them in field operations are …
-
Analytical Framework for Field Positioning and Work Planning for a Backhoe Excavator
… construction project depends on proper planning, progress monitoring and adaptation to the continually changing complex situations in the field. Efficient remote tracking of multiple disparate resources and establishing the collaboration and coordination between them in field operations are …
-
Progress in Transferable Work-load Projects : Development of a Robust Method for the Evaluation and Forecasting of Distributed Progress
… de la valeur acquise (Earned Value Analysis), Progress Plot, Milestone and Resource slip charts, Concurrent Engineering, peuvent être utilisés. Le problème étudié est lié à l'industrie pharmaceutique où de nouveaux traitements ou médicaments sont développés, et où l'efficacité d'un traitement …
-
Measuring and Visualizing Integrated Project Interface Status
… of interface health, workload, and engineering progress. Collaboration, communication, and interactions between project stakeholders have a high impact on the overall success of complex capital projects. Managing interactions between stakeholders, tracking deliverables, measuring workload, and …
-
Measuring progress and defining productivity in model-based engineering
… and standardized processes for measuring progress and productivity of a model-driven engineering process; particularly, when the deliverable type, schedule reporting, and their impacts have changed. The key underlying challenge is how progress and level of effort in a model-driven …
-
Evaluación de la medición del progreso en el proyecto “Viviendas Sociales” y su efecto en el reconocimiento de ingresos en la empresa “JM Constructores & Servicios Generales E.I.R.L”, 2024
La investigación se lleva a cabo en un contexto donde la evaluación del progreso en proyectos de construcción es crucial para el reconocimiento de ingresos; siendo el objetivo principal evaluar la medición del progreso en el proyecto “Viviendas sociales” y su efecto en el reconocimiento de ingresos …