Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 20 of 26 for “"Project Delay"”
-
Factors causing delay of modification projects at Koeberg Power Station
Project delays are common in construction projects, and at Koeberg Nuclear Power Station, modification and outage projects are not exempted from these delays. Subsequently, these project delays have a detrimental effect on the Eskom organization in terms of its mandate to supply electricity to …
-
A fuzzy logic approach to model delays in construction projects
Delays in construction projects are inevitable; as a result claims and disputes arise among different construction parties. Different causes of delay can come into play, therefore, there is a need to identify and classify different causes of project delay. Estimation of the likelihood of delay …
-
Identifying delay factors in electrical distribution projects at Eskom Northern Cape Operating Unit
Delays on electrical engineering projects are a phenomenon at Eskom distribution due to a wide range of causes. These project delays result in Eskom to contravene with Electricity Regulation Act 4 of 2006 in terms of providing efficient, effective and sustainable operation of electricity supply …
-
Addressing the project implementation challenges in the Saudi Arabian power supply industry: an investigative approach towards improving project delivery
… challenge is through delivering power supply projects with maximum efficiency. Project delivery delay, however, is not uncommon in this highly capital-intensive industry, indicating electricity supplies are not coping with the demand increases. To provide a deeper insight into the challenges …
-
A lean production approach to materials management in the Nigerian construction industry
… poor quality of work, poor materials flow, project delay and cost overrun. Overcoming these challenges, requires the rethinking the current modus operandi of the Nigerian construction industry. One such method that has been espoused as having potential to improve materials management, and …
-
Causes of delays in construction projects & how the project manager can act to avoid delays
… at identifying the most important causes of delays in civil engineering construction projects in Dubai from the viewpoint of construction contractors.<br/><br/>Dubai presents a special set of circumstances in which the Project Manager has to operate e.g. rapid growth in construction, tight …
-
System dynamic models for construction projects
… dynamics principles and models to construction project negotiations and schedule. It helps improve the efficiency of the negotiation processes and allows planners to realize the shortcomings of their proposed schedules through showing the relationships and interactions between variables in the …
-
The effect of regional geology, regulatory environments, and project value propositions on emerging discoveries and impending developments in the North Slope of Alaska
… derail the development of new Alaskan drilling projects. The aim of this thesis is to understand these plays from a geological, production potential, value, and impact perspective to better understand impending developments in the North Slope region and formulate proposals to mitigate impact and …
-
Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries : a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project’s schedule (PPP vs. traditional projects)
… water and wastewater, and transportation projects with the help and expertise of the private sector. While PPP was proven to be successful in several instances, there are also several failure stories where the PPP scheme was used. In order to avoid such problems and due to the complex …
-
Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries : a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project’s schedule (PPP vs. traditional projects)
… water and wastewater, and transportation projects with the help and expertise of the private sector. While PPP was proven to be successful in several instances, there are also several failure stories where the PPP scheme was used. In order to avoid such problems and due to the complex …
-
Heuristic procedures for project scheduling under a limited resource
Activities of a project often must be scheduled under limited resources. In general, the aim of the scheduling task is to find a feasible schedule that minimizes the project duration. However, obtaining feasible and optimal schedule for most practical problems have been computationally intractable. …
-
Fuzzy Time-Delay Model in Fault-Tree Analysis for Critical Path Method
Construction projects are always expected to be delayed, but the likelihood of a delay varies between projects because of the particular circumstances and schedule for that project. It is usually left to the scheduler to estimate these future circumstances of the project when preparing the schedule …
-
Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects
… winning contractor can lead to problems in the project delivery phase such as bad quality and project delay; which ultimately results in cost overruns. There are two strategies involved with selecting contractors: one is the lowest tender, the other is called best value.Selecting the lowest …
-
Challenges and opportunities in environmental planning and permitting on transportation design-build projects
… planning and permitting for transportation projects is often seen as one of the top reasons for project delay. On design-build projects, this process is often treated as the critical path to advertising the project and on all transportation projects many critical phases of the project such …
-
As-built schedule comparison between urban and rural bridge construction projects
… between urban and rural bridge construction projects. It provides useful information for both contractors and organizations, such as Iowa DOT. This information allows the setting up of reasonable and reliable as-planned schedules for urban area bridge construction projects and facilities …
-
Managing Supply for Construction Project with Uncertain Starting Date
… from different sources can adversely affect the project financially or its timely completion. Some risks of construction projects are out of managers’ control while other risks such as supply related ones can usually be controlled and directed by effective managerial tactics. In this thesis, we …
-
Development of the Change Management Method for Small and Medium Construction Projects
… happen during the process of the construction project. Main changes could be absence of workers, breakdown of machines, and adverse weather. These changes can impact the project at all kinds of levels. Meanwhile, the project manager needs to make appropriate decisions to minimize the impact of …
-
A Rule Based Expert System for Delay Analysis in Construction Projects
… of the main problems encountered in construction projects is the delay of the project. Delay has negative consequences for all participants in the projects. In fact, when the necessary action is not taken on time and a consensus cannot be reached between the parties, disputes arising from delay …
-
Developing an Interface Management (IM) Model for Construction Projects
… is a main factor in the success of construction projects. Although there is no agreement about the definition of interfaces and IM, many researchers discuss the boundary conditions between tools, phases, systems, physical elements/components, people, organizations, and other elements. For the …
-
A Comprehensive Practice of Total Float Pre-Allocation and Management for the Application of A CPM-Based Construction Contract
… technique as a management tool. In such projects, many participating parties commonly attempt to appropriate float time shown in the CPM schedules in order to advance their own interests. Under current scheduling practices, float time is considered "free" and therefore does not belong to …
Page 1 of 2