Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 20 of 363 for “"Project Delivery"”.

  1. Comparing claims and disputes performance between traditional project delivery method and alternate project delivery methods

    Claims and disputes are common in construction projects and the costs associated with these adversarial relationships can reach up to $4-12 billion per year. While previous studies have indicated that project delivery methods (PDMs) might impact the frequency and severity of claims and disputes on …

    colostate Repository record for Comparing claims and disputes performance between traditional project delivery method and alternate project delivery methods (opens in a new tab)

  2. The design-build project delivery system

    <p>The design-build project delivery system possesses fundamental advantages over other project delivery methods practiced in the United States. Design-build is a project delivery system wherein a single entity provides comprehensive design and construction services to an owner, under one contract. …

    ut-knoxville Repository record for The design-build project delivery system (opens in a new tab)

  3. Integrated project delivery for industrial projects

    <p>Industrial capital projects are risky business ventures with increasing size, uncertainty, and complexity that frequently experience growth in cost and time to deliver, and oftentimes do not achieve their desired performance results. From Merrow (2011), “65% of all industrial projects fail to …

    iastate Repository record for Integrated project delivery for industrial projects (opens in a new tab)

  4. Cost Comparison of Collaborative and IPD-like Project Delivery Methods Versus Competitive Non-collaborative Project Delivery Methods

    Collaborative project delivery methods are believed to contribute to faster completions times, lower overall project costs and higher quality. Contracts are expected to influence the degree of collaboration on a given project since they allow or restrict certain lines of communication in the …

    tamu Repository record for Cost Comparison of Collaborative and IPD-like Project Delivery Methods Versus Competitive Non-collaborative Project Delivery Methods (opens in a new tab)

  5. An evidence-based comparison of construction project delivery

    … to a patient. As with a patient, construction projects are all unique and take on their own characteristics throughout the life of the project. This research used the analysis-of-variance (ANOVA) method to analyze the risks associated with economics, environment, project, and technology on the …

    colostate Repository record for An evidence-based comparison of construction project delivery (opens in a new tab)

  6. Program project delivery method evaluation waste water facilities

    … and operating a range of assets. The projects that are undertaken are often chosen due to their importance, cost and need to the residents they serve. Municipalities vary greatly in size, from a few hundred people to a few thousand. While varying greatly in size, many have a similar …

    iastate Repository record for Program project delivery method evaluation waste water facilities (opens in a new tab)

  7. Planning for strategic change in the project delivery strategy

    … adopting a new approach to procure services for delivery of construction projects requires significant organizational changes; modifications to both their work processes and existing organizational structures may be needed. These adjustments, encompassing many different aspects of the …

    texas Repository record for Planning for strategic change in the project delivery strategy (opens in a new tab)

  8. Stakeholder perspectives on adoption of Integrated Project Delivery (IPD)

    Projects in the Architecture, Engineering, and Construction (AEC) industry frequently perform below expectations related to a variety of metrics for success. Various reasons have been found for these persistent performance gaps; the segregation of processes, services, and actors involved in project …

    ubc Repository record for Stakeholder perspectives on adoption of Integrated Project Delivery (IPD) (opens in a new tab) Download PDF for Stakeholder perspectives on adoption of Integrated Project Delivery (IPD) (opens in a new tab)

  9. Project delivery configuration for satisficing building energy renovation activities

    … of value within building energy renovation projects. How it is understood, from which activities it is derived, who is responsible for its creation, how it is distributed. The temporary multi-firm configurations that coalesce to deliver such renovations are central to the research. Adopting …

    cork Repository record for Project delivery configuration for satisficing building energy renovation activities (opens in a new tab)

  10. Involvement of electrical contractors in integrated project delivery (IPD)

    … ability to pursue, and ultimately complete IPD projects successfully. This was largely accomplished by conducting interviews with thirteen ECs—six who had experience with IPD and seven who did not have experience with IPD. Overall, the majority of issues/risks expressed by both sets of …

    colostate Repository record for Involvement of electrical contractors in integrated project delivery (IPD) (opens in a new tab)

  11. Construction Digital Twin: From Early Design to Project Delivery

    … The fragmented nature of construction projects is challenging the collaboration and innovation needed for the industry and society to benefit from the digitalization. The purpose of this research is to investigate the digital twin technology as a tool to integrate the different phases …

    chalmers Repository record for Construction Digital Twin: From Early Design to Project Delivery (opens in a new tab)

  12. Campus Planners' Preferences For Residence Hall Project Delivery Methods

    This research determined the preferred project delivery method utilized by campus planners when building student housing on a university campus. Four key performance indicators were also evaluated to determine if they influenced the campus planner to select a particular project delivery method. The …

    unf Repository record for Campus Planners' Preferences For Residence Hall Project Delivery Methods (opens in a new tab) Download PDF for Campus Planners' Preferences For Residence Hall Project Delivery Methods (opens in a new tab)

  13. Knowledge transfer and application in integrated project delivery teams

    … Engineering, and Construction (AEC) project teams gather experts from different disciplines and organizations to develop a common project. Promoting knowledge transfer among these experts is vital to effectively integrate their diverse knowledge and optimize project out-comes (i.e., …

    msu Repository record for Knowledge transfer and application in integrated project delivery teams (opens in a new tab)

  14. In-depth case study of a partnered project delivery

    … on a case study of a partnered construction project is missing. There is a gap in the literature in empirical and rigorous studies for project partnering in the AEC industry, especially focusing on and documenting its immediate implications, that is: the mediating effects on project …

    msu Repository record for In-depth case study of a partnered project delivery (opens in a new tab)

  15. An evaluation of skillsets required for capital project delivery today

    The practice of managing capital project delivery in America evolves. By proxy, the skillsets necessary to fulfill the requirements of this profession also evolve. This report attempts to identify sources that define which skillsets are most valuable for professionals managing capital project …

    texas Repository record for An evaluation of skillsets required for capital project delivery today (opens in a new tab)

  16. BIM-ENABLED PROJECT COST MANAGEMENT THROUGH THE PROJECT DELIVERY PROCESS

    … THE FINDINGS SUGGEST THAT A BIM-ENABLED PROJECT COST MANAGEMENT PROCESS LEADS TO IMPROVEMENT IN WORKFLOW PRODUCTIVITY (MAN-HOURS), AND COST CERTAINTY AS COMPARED TO THE CONVENTIONAL COST MANAGEMENT METHODOLOGIES, AND THE EXTENT OF ADVANTAGES/BENEFITS VARIES ACCORDING TO THE DIFFERENT …

    nus Repository record for BIM-ENABLED PROJECT COST MANAGEMENT THROUGH THE PROJECT DELIVERY PROCESS (opens in a new tab) Download file for BIM-ENABLED PROJECT COST MANAGEMENT THROUGH THE PROJECT DELIVERY PROCESS (opens in a new tab)

  17. Alliance contracting : when is it the best project delivery method?

    … together comprising of the best people for the project, drawn from the organisation of each of the alliance participants, whereby all partners to the alliance decide the directions of the project. It is an open book arrangement, and there are certain performance indicators that each partner has …

    adelaide Repository record for Alliance contracting : when is it the best project delivery method? (opens in a new tab)

Page 1 of 19