  1. Program project delivery method evaluation waste water facilities

    … and operating a range of assets. The projects that are undertaken are often chosen due to their importance, cost and need to the residents they serve. Municipalities vary greatly in size, from a few hundred people to a few thousand. While varying greatly in size, many have a similar …

    iastate Repository record for Program project delivery method evaluation waste water facilities (opens in a new tab)

  2. Alliance contracting : when is it the best project delivery method?

    … together comprising of the best people for the project, drawn from the organisation of each of the alliance participants, whereby all partners to the alliance decide the directions of the project. It is an open book arrangement, and there are certain performance indicators that each partner has …

    adelaide Repository record for Alliance contracting : when is it the best project delivery method? (opens in a new tab)

  3. Geotechnical risk decision tools for alternative project delivery method selection

    … (DOT), especially they seek to accelerate project delivery schedules. The nature of the DB delivery requires that projects are awarded before a complete subsurface has been done. Hence, projects are awarded without a comprehensive geotechnical scope, nor completed geotechnical design. DOTs …

    iastate Repository record for Geotechnical risk decision tools for alternative project delivery method selection (opens in a new tab)

  4. Risk and innovation in project delivery method selection for complex highway projects

    The selection of a project delivery method (PDM) is a crucial decision that state highway agencies (SHAs) must make during the pre-procurement stage of infrastructure projects. The chosen PDM will determine the project's stakeholders, contract structure, final design, and construction. However, the …

    texas Repository record for Risk and innovation in project delivery method selection for complex highway projects (opens in a new tab)

  5. An Empirical Comparison of Project Delivery Method Performance for Highway Construction Projects

    … study was to provide an empirical analysis of project performance between the traditional design-bid-build (DBB) method and alternative design-build (DB) method of project delivery for highways. The study examined five major performance metrics: cost growth, schedule growth by notice to …

    ku Repository record for An Empirical Comparison of Project Delivery Method Performance for Highway Construction Projects (opens in a new tab)

  6. Comparison of Design-Build to Design-Bid-Build as a project delivery method

    … the Design-Bid-Build (DBB) and Design-Build (DB) project delivery methods. The project delivery method defines the acquisition process, relationships, roles and responsibilities of the project team and the sequence of events to deliver the facility. Southwest Division, Naval Facilities Engineering …

    nps Repository record for Comparison of Design-Build to Design-Bid-Build as a project delivery method (opens in a new tab)

  7. Development of Fuzzy Hybrid Approaches to Project Delivery Method Selection in Highway Construction

    Selection of project delivery methods is a success factor in delivering highway construction projects because it has a substantial impact on the project performance, such as cost, time, and quality. Project delivery decision-making processes have been heavily relied on experts’ opinions and …

    ku Repository record for Development of Fuzzy Hybrid Approaches to Project Delivery Method Selection in Highway Construction (opens in a new tab)

  8. Construction Management Project Delivery Method: A Case Study of the Centre Block Rehabilitation Project

    … applicable when it comes to heritage restoration projects. Heritage buildings typically have an extra layer of regulation since they have an underlying site and historical value that creates limitations during construction even when they are kept and restored or renovated. Such buildings, most of …

    waterloo Repository record for Construction Management Project Delivery Method: A Case Study of the Centre Block Rehabilitation Project (opens in a new tab)

  9. Comparing claims and disputes performance between traditional project delivery method and alternate project delivery methods

    Claims and disputes are common in construction projects and the costs associated with these adversarial relationships can reach up to $4-12 billion per year. While previous studies have indicated that project delivery methods (PDMs) might impact the frequency and severity of claims and disputes on …

    colostate Repository record for Comparing claims and disputes performance between traditional project delivery method and alternate project delivery methods (opens in a new tab)

  10. Analysis of the Texas A&M University System's Construction Project Delivery Method Performance: CMAR and CSP

    … (CMAR) has surged as an innovative construction project delivery method in comparison to traditional competitive bid procurement methods. The conceptual pros and cons of the method are widely accepted throughout the construction industry; however, very little quantitative research exists …

    tamu Repository record for Analysis of the Texas A&M University System's Construction Project Delivery Method Performance: CMAR and CSP (opens in a new tab)

  11. Identifying the key innovative and collaborative strategies of integrated project delivery method to achieve owner goals in housing projects

    The fragmented nature of tradition project delivery in the Architecture, Engineering, and Construction industry causes many inefficiencies and results in missed project goals and expectations. Integrated Project Delivery (IPD) is new procurement method that has a potential to address these …

    ubc Repository record for Identifying the key innovative and collaborative strategies of integrated project delivery method to achieve owner goals in housing projects (opens in a new tab) Download PDF for Identifying the key innovative and collaborative strategies of integrated project delivery method to achieve owner goals in housing projects (opens in a new tab)

  12. Campus Planners' Preferences For Residence Hall Project Delivery Methods

    This research determined the preferred project delivery method utilized by campus planners when building student housing on a university campus. Four key performance indicators were also evaluated to determine if they influenced the campus planner to select a particular project delivery method. The …

    unf Repository record for Campus Planners' Preferences For Residence Hall Project Delivery Methods (opens in a new tab) Download PDF for Campus Planners' Preferences For Residence Hall Project Delivery Methods (opens in a new tab)

  13. Impact to alternative contracting methods using multivariate analysis in the regulatory environment

    … whether benefits exist when using alternative project delivery methods, and whether legislative limitations allowing the use of alternative project delivery methods impede any such benefits from being realized. The research begins by defining the project delivery method process, and explains in …

    gatech Repository record for Impact to alternative contracting methods using multivariate analysis in the regulatory environment (opens in a new tab)

  14. A comparison of design-bid-build and design-build project delivery methods on military construction projects

    … Corps of Engineers has adopted the design-build project delivery method as a means to produce military facilities faster and cheaper. An analysis was conducted on 119 military construction projects executed by the US Army Corps of Engineers. While design-build awards may be made earlier in the …

    iastate Repository record for A comparison of design-bid-build and design-build project delivery methods on military construction projects (opens in a new tab)

  15. Investigation into the effects of project delivery methods on LEED targets

    … and evaluation of green buildings. The project delivery method, chosen by the owner, can affect the achievement of project targets (e.g., budget, schedule, LEED certification). The most utilized project delivery method is the traditional Design-Bid-Build (DBB). Integrated Project …

    usfca Repository record for Investigation into the effects of project delivery methods on LEED targets (opens in a new tab)

  16. Comparison of design-build and design-bid-build performance of public university projects

    … where they are unable to complete their projects within cost and schedule using the traditional delivery method: Design-Bid-Build (DBB). Under the DBB project delivery method, many competent contractors are electing to send low bids on projects just to keep work on their books, with plans …

    unlv Repository record for Comparison of design-build and design-bid-build performance of public university projects (opens in a new tab) Download PDF for Comparison of design-build and design-bid-build performance of public university projects (opens in a new tab)

  17. Lessons learned from the selection of project delivery methods in highway projects : a case from the Texas Department of Transportation

    The selection of a project delivery method is a complex decision that can greatly affect the project outcome. Multiple methodologies have been developed to facilitate the selection for private entities as well as for public entities, like State Highway Agencies. The elements examined during the …

    texas Repository record for Lessons learned from the selection of project delivery methods in highway projects : a case from the Texas Department of Transportation (opens in a new tab)

  18. An evidence-based comparison of construction project delivery

    … to a patient. As with a patient, construction projects are all unique and take on their own characteristics throughout the life of the project. This research used the analysis-of-variance (ANOVA) method to analyze the risks associated with economics, environment, project, and technology on the …

    colostate Repository record for An evidence-based comparison of construction project delivery (opens in a new tab)

  19. An empirical comparison of design/build and design/bid/build project delivery methods

    This thesis project compares the performance of a homogeneous sample of United States Navy Bachelor Enlisted Quarters built using the Military Construction process. Projects will be broken into two sub-samples of design/bid/build and design/build projects to see if one project delivery method is …

    texas Repository record for An empirical comparison of design/build and design/bid/build project delivery methods (opens in a new tab) Restricted access