Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 241 for “"Project cost"”.
-
An Analysis to Improve Interim Final Project Cost Predictions
<p>When managing a project, a project manager is often faced with the decision to act if a project appears to be over budget. While this decision seems straightforward, for some projects this can be a costly decision that causes delays and missed deadlines or spending even more resources on …
-
An Information Model for Real-Time Project Cost Integration
… the information model by using real-life project data. This information model, named OCIM, provides a new perspective for designing management information system for the construction industry. OCIM may serve as a blueprint for designing information systems that support cost integration for …
-
Descriptive multi-resource and multi-project cost models for subcontractors
… should be allocated simultaneously across many projects in a dynamic manner. Significant scheduling problems are posed by concurrent multi-projects with limited resources. Unfortunately, with a lack of appropriate models, subcontractors mostly make decisions based on their previous experiences …
-
BIM-ENABLED PROJECT COST MANAGEMENT THROUGH THE PROJECT DELIVERY PROCESS
… THROUGHOUT THE PHASES OF RESOURCE PLANNING, COST ESTIMATING, COST BUDGETING AND COST MONITORING AND CONTROL. THROUGH THE CASE STUDIES, THE AUTHOR SEEKS ELUCIDATIONS ON THE DISTINCTIONS BETWEEN CONVENTIONAL AND BIM-ENABLED COST MANAGEMENT METHODOLOGIES. THE FINDINGS SUGGEST THAT A BIM-ENABLED …
-
Transportation infrastructure project cost overrun risk analysis : risk factor analysis models
… to propose several useful analytical models for cost overrun risk analysis in transportation infrastructure investments. Probability models and regression models are proposed and partially (due to data insufficiency) applied using the VIHP (Vancouver Island Highway Project) data. The VIHP case …
-
Design of an integrated project cost/schedule monitoring and control system
iv, 64, [18] leaves
-
Financial Planning and Project Cost Control Techniques Applied to Building Management
… were available to assess and compare individual projects on the basis of their working capital requirements and internal rate of return prior to tender submission. Such findings support proposals concerning the adoption of financial planning procedures by the first mentioned company.
-
The relevance of project cost information in a modern pharmaceuticals company
… a limited set of companies to test transaction cost economics, and in the latter case have used structural equation modelling. Therefore this thesis originally aimed to emulate this with a questionnaire in a single pharmaceuticals company. However measurement of the concepts used in the three …
-
Improvement and implementation of analog based method for software project cost estimation
Cost estimation is an important issue in project management. The effective application of project management methodologies often relies on accurate estimates of project cost. Cost estimation for software project is of particular importance as a large amount of the software projects suffer from …
-
Control-Theoretic Decision Support for Mitigation of Modeled Software Project Cost Overruns
… In this work, the management problem of software project schedule adherence is re-cast as a problem in control theory. Below, a modeling framework is proposed for capturing the constraints and dependencies found in the arbitrary organization specific work-flows underlying software production. …
-
Database management system modeling for construction project cost and time data process
Thesis (M.S.)--Michigan State University. Department of Agricultural Engineering, 1998
-
Integration of project cost estimate and project time schedule : a project breakdown structure approach
Includes bibliographical references
-
ALLOCATION OF CONTINGENCY AND ITS MANAGEMENT FOR CONSTRUCTION PROJECT COST IN SINGAPORE: A PROBABILISTIC APPROACH USING ARTIFICIA
In planning and execution of any construction project, there always exists an element of unforeseen works and events. The allowance included in a project estimate to cover the cost associated with these unforeseen events is defined as contingency. An accurate assessment of such contingency amount …
-
TIMING OF RISK MANAGEMENT ACTIONS DURING THE CONSTRUCTION PROCESS: RELATIONSHIP WITH CONTROLLING PROJECT COST AND SCHEDULE IMPACTS
Risk Management is a critical aspect of effective project control within the construction industry. Considering the fact that the construction process is subject to a diverse set of risk elements, the objective of this study was to better understand the risk distribution across the construction …
-
An Examination Of The Variation In Information Systems Project Cost Estimates: The Case Of Year 2000 Compliance Projects
… to explore the relationship between estimated costs of software projects and five cost influence dimensions described by the Year 2000 Enterprise Cost Model (Kappelman, et al., 1998) -- organization, problem, solution, resources, and stage of completion. This research was a field study survey …
-
Understanding the issues of project cost and time in sustainable construction from a general contractor's perspective: case study
… delivering successful sustainable construction projects. If an integrated project delivery method is chosen, the General Contractor may offer insightful preconstruction assistance by providing ideas on green construction methods and materials. As sustainable building practices become more …
-
The effect of military construction transformation on project cost and schedule within the United States Army Corps of Engineers South Atlantic Division
… Force. Its members are considered the experts in project delivery for the Department of Defense (DoD). In 2006, the Base Realignment and Closure Program (BRAC) and the Global War on Terrorism (GWOT) led to increased workload which caused the USACE to adopt the Design-Build project delivery process …
-
Development of a system model for cost management in low-cost housing projects in Nigeria
Poor project cost performance is one of the vital issues challenging successful construction project delivery particularly in developing countries such as Nigeria. This issue is endemic particularly in Low-cost housing (LcH) projects with adverse effects on delivery, affordability of the target …
Page 1 of 13