Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 2 of 2 for “"Project management--Mathematical models"”.

  1. Analysis of the Beta Distribution Assumption in the Pert Algorithm

    … between the critical paths, the expected project durations, the project duration variances, and the durations required to give 95% probability that a project would be completed on schedule. The study was performed assuming that every activity in the network followed the same distribution. …

    ucf Repository record for Analysis of the Beta Distribution Assumption in the Pert Algorithm (opens in a new tab)