Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 55 for “"Project owners"”

  1. Underpinning project; owners' views on technology, economy and project management

    … cost-controlled implementation of underpinning projects. The property owner - in Finland, commonly a residents' association - typically commissions a single underpinning project, which means that the owner generally does not have any empirical knowledge of such projects. Property owners …

    aalto Repository record for Underpinning project; owners' views on technology, economy and project management (opens in a new tab)

  2. Defining KPIs to assess the impact of innovation in construction: Insights from Public Project Owners

    … of current practice was carried out with public project owners (PPOs) in Québec to understand what is measured, how it is measured, and why. A Design Science Research (DSR) approach was used. First, a literature review assembled 42 KPIs grouped into nine categories: Cost, Time, Productivity, …

    ets-quebec

  3. Identifying the impact of preconstruction elements on project budget and time using BIM-generated data: developing a decision-making guideline for project owners

    Preconstruction is the preliminary part of a project’s lifecycle during which the plan for construction is established. There are many critical decisions made during this phase that may lead to variances in preconstruction budget and time. Controlling budget variances is a key objective during the …

    oklahoma-thes Repository record for Identifying the impact of preconstruction elements on project budget and time using BIM-generated data: developing a decision-making guideline for project owners (opens in a new tab) Restricted access

  4. Project execution EPC, EPCM of IPT : which method works best for large scale projects

    The final outcome of a project is what owners look at, to determine if a project was successful or failure. The iron triangle is most often used as indicator, the cost (below budget), time (on schedule) and quality (is it fit for purpose). One part that will affect the outcome of a project is the …

    reykjavik Repository record for Project execution EPC, EPCM of IPT : which method works best for large scale projects (opens in a new tab)

  5. Identifying private construction project owner inefficiencies that affect project goals

    <p>Construction project owners play a critical role in the pre-construction, construction and post-construction phases of a construction project. Their role on the team has not been properly analyzed to inform owner employers of the shortcomings project owners may display during a project. In order …

    iastate Repository record for Identifying private construction project owner inefficiencies that affect project goals (opens in a new tab)

  6. Benefits and Barriers of Offsite Construction in Hospital Projects

    Project owners of all types typically want to save time and money and increase the quality and safety of their projects. Owners continue to look towards alternate building methods to realize these benefits on their construction projects. One area that project owners continue to look at is modular …

    washington Repository record for Benefits and Barriers of Offsite Construction in Hospital Projects (opens in a new tab)

  7. Emergy based procurement framework to improve sustainability performance in construction.

    … perspectives of construction managers and project owners across Canada, it was concluded that sustainable procurement is rarely being used in the Canadian construction industry. The empirical study indicated that a limited number of sustainability initiatives are used in construction …

    ubc Repository record for Emergy based procurement framework to improve sustainability performance in construction. (opens in a new tab)

  8. Novel Data-Driven Approaches for Enhanced Project Duration and Cost-Related Decision Making

    Proper and effective decision-making by project owners during pre-construction phases is highly critical to the successful completion of construction projects. Due to the lack or uncertainty of project information during the project development phases, many essential decisions are typically made …

    tamu Repository record for Novel Data-Driven Approaches for Enhanced Project Duration and Cost-Related Decision Making (opens in a new tab)

  9. Collaborative risk management in complex construction projects

    Construction project success depends on efficient and effective risk management (RM) and collaborative working. Standard RM frameworks are currently focused on single-firm organizations, whereas in practice, construction project RM involves multiple organizations. Therefore, the adaptation of RM …

    aalto Repository record for Collaborative risk management in complex construction projects (opens in a new tab)

  10. Benefit Cost Analysis of Solar Power over On-Grid Electricity for Residential Systems: Is Photovoltaic Technology Really Effective?

    … issue of natural energy resources. However, project owners’ general perception believes that a one-time high installation cost hampers the adoption of an alternative energy system like solar power. This study investigates the effectiveness of the solar-powered photovoltaic system over the …

    tamu Repository record for Benefit Cost Analysis of Solar Power over On-Grid Electricity for Residential Systems: Is Photovoltaic Technology Really Effective? (opens in a new tab)

  11. Incorporating Green-Building Design Principles into Campus Facilities Planning: Obstacles and Opportunities

    … Green Building Rating System in a new building project, the Integrated Learning and Research Facility (ILRF), located on the Ohio University campus. Through review of ILRF project documents, interviews with Ohio University building planning and maintenance staff as well as design professionals …

    ohiolink Repository record for Incorporating Green-Building Design Principles into Campus Facilities Planning: Obstacles and Opportunities (opens in a new tab)

  12. Reference Coupling: A Method for Identifying Software Ecosystems of Technically Dependent Projects

    Software projects are not developed in isolation. Open source software projects encourage a networked collaboration and interdependence across projects and developers. Recent research has shifted to studying software ecosystems, communities of projects that depend on each other and are developed …

    uvic Repository record for Reference Coupling: A Method for Identifying Software Ecosystems of Technically Dependent Projects (opens in a new tab)

  13. Taming the Invoice Review Monster

    … challenges in large-scale infrastruc ture megaprojects. This master’s thesis investigates the potential of using Artificial Intelligence (AI) to identify cost deviations within the invoice review process, focusing on the Swedish Transport Ad ministration (Trafikverket) and its West Link …

    chalmers Repository record for Taming the Invoice Review Monster (opens in a new tab)

  14. How should we consider non-human animal rights in projects?

    In Iceland, the share of work carried out in projects is 28% of total economic activities. Many have direct and indirect negative impacts on non-human animals and animal habitats, despite mandatory and voluntary advances to minimise that impact. Semi-structured interviews (n=9) were conducted, and …

    reykjavik Repository record for How should we consider non-human animal rights in projects? (opens in a new tab)

  15. Effective contract drafting for the avoidance and resolution of construction claims

    … are, however, primary concerns for many project owners. The ability to minimize the number of disputes and to resolve disputes effectively is an important factor in minimizing the cost and impact of construction projects.</p> <p>This thesis compared the Tennessee Department of …

    ut-knoxville Repository record for Effective contract drafting for the avoidance and resolution of construction claims (opens in a new tab)

  16. Sutelktinis finansavimas ir jo plėtros perspektyvos /

    … to developing a business, to an opportunity for project owners to address marketing concerns. However, crowdfunding comes with its own set of challenges such as arrivals of new competitors due to detailed information being revealed or existing uncertainty due to the absence of common legal …

    vilnius Repository record for Sutelktinis finansavimas ir jo plėtros perspektyvos / (opens in a new tab)

  17. Applications of Agent Based Approaches in Business: A Three Essay Dissertation

    … the value addition by the IT backgrounds of project owners in managing IT related projects. Then it investigates the impact of peer-pressure on a firm's outsourcing behavior.

    usf Repository record for Applications of Agent Based Approaches in Business: A Three Essay Dissertation (opens in a new tab)

  18. Nurses participating in Healthcare facility redesign: a qualitative descriptive study

    … Health Board (DHB). By examining their roles as project owners for facility and care redesign in project groups, we gain understanding of how such involvement currently exists, and what future recommendations might be formulated. Throughout New Zealand nurses have been involved in major hospital …

    auckland-tech Repository record for Nurses participating in Healthcare facility redesign: a qualitative descriptive study (opens in a new tab)

  19. Climate Change Risk Assessment of Hydropower Projects: Towards a Holistic Approach

    … of climate change impact on hydropower projects should consider the risks due to low flow as well as high floods. The High flows damage the in-stream structure, and can harm the riparian populations. Lower than expected flows, either form drought or shifts in the hydrologic regime, …

    ohiolink Repository record for Climate Change Risk Assessment of Hydropower Projects: Towards a Holistic Approach (opens in a new tab)

  20. Globally Distributed Teams: The Between-team Barriers That Impede The Successful Delivery Of Agile Software Development

    Software development projects fail far too often, costing companies billions in revenue, loss of the intended purpose and damage to both customers and suppliers in the process (A. Shenhar & V. Holzmann, 2017a). Understanding the challenge of ever-failing globally distributed software development …

    ucf Repository record for Globally Distributed Teams: The Between-team Barriers That Impede The Successful Delivery Of Agile Software Development (opens in a new tab)

Page 1 of 3