Results 1 to 11 of 11 for “"Project planning and scheduling"”

  1. Computer application of project planning and scheduling with CPM

    <p>Scheduling is one of the most important tools for project management and control, and the CPM is one of the techniques used in project scheduling.</p><p>The primary objective of this thesis is to develop a CPM computer package using a microcomputer. The package is constituted in Basic (Applesoft …

    njit Repository record for Computer application of project planning and scheduling with CPM (opens in a new tab)

  2. Understanding Applications of Project Planning and Scheduling in Construction Projects

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for …

    lund Repository record for Understanding Applications of Project Planning and Scheduling in Construction Projects (opens in a new tab)

  3. Auction-theories critical chain approach for resource-constrained multi-project planning and scheduling

    … technique for resource-constrained multi-project planning and scheduling. Though project management has developed for decades, most traditional network analysis techniques focus on time-only analysis and neglect resource constraints. Recently, a large volume of research has been conducted …

    nanyang Repository record for Auction-theories critical chain approach for resource-constrained multi-project planning and scheduling (opens in a new tab)

  4. Evaluation of the Factors Causing Cost and Time Overrun in the Namibian Construction Industry

    Cost and time are one of the two primary parameters that require due considerations throughout the project lifecycle and are the determining factors for project success. However, it is very common that many projects fail to achieve their goal of being completed within the planned budget and …

    cape-town Repository record for Evaluation of the Factors Causing Cost and Time Overrun in the Namibian Construction Industry (opens in a new tab)

  5. Integer-Programming-Assisted Path-Float-Based Method for Time-Cost Tradeoff Optimization in Project Planning

    … tradeoff (TCT) optimization is a classic planning problem appealing to construction management; yet, existing analytical methods are found inadequate to make a significant impact in practice. Heuristic methods lack a theoretical basis to ensure arriving at optimum solutions in solving …

    alberta Repository record for Integer-Programming-Assisted Path-Float-Based Method for Time-Cost Tradeoff Optimization in Project Planning (opens in a new tab)

  6. Planning and Scheduling Supply Chain Integrated Projects

    Project planning and scheduling are two major tasks directly impacting an organization’s profitability. Traditionally, project managers first schedule project activities and then plan for the associated supply chain, such as materials ordering, procurement, and supplier selection. This sequential, …

    unsw Repository record for Planning and Scheduling Supply Chain Integrated Projects (opens in a new tab)

  7. Methodology for Project Schedule Acceleration Integrated with Energy Source-Based Assessment of Occupational Health and Safety Risks

    There will always be uncertainties and hazards involved with project activities in the construction industry. Both long-term and short-term safety events reported to occupational health and safety authorities are impacted by the practice of schedule compression by crashing the project activities. …

    alberta Repository record for Methodology for Project Schedule Acceleration Integrated with Energy Source-Based Assessment of Occupational Health and Safety Risks (opens in a new tab)

  8. Enhancements to Methods for Planning and Scheduling Fabrication Projects Utilizing Multiskilled Labour Resources

    In prefabrication and off-site construction, various multiskilled work crews need to be assembled to work on different workstations to process custom-designed work units, each having specific requirements for material handling, assembly connections, welding, etc. However, the frequent labour …

    alberta Repository record for Enhancements to Methods for Planning and Scheduling Fabrication Projects Utilizing Multiskilled Labour Resources (opens in a new tab)

  9. Lean guidelines for improving construction operations in Zimbabwe

    The poor performance of construction projects in Zimbabwe, evidenced by cost over-runs, extensive delays, re -works, defects and accidents, has resulted in the need for cost-effective improvement strategies that entail the theory of constraints and lean construction. This is because the theory of …

    nmmu Repository record for Lean guidelines for improving construction operations in Zimbabwe (opens in a new tab)

  10. Prise en compte de la flexibilité des ressources humaines dans la planification et l’ordonnancement des activités industrielles

    … à la volatilité des marchés soulève une forte demande de la flexibilité dans leur organisation. Cette flexibilité peut être utilisée pour améliorer la robustesse du planning de référence d’un programme d’activités donné. Les ressources humaines de l’entreprise étant de plus en plus considérées …

    star-france Repository record for Prise en compte de la flexibilité des ressources humaines dans la planification et l’ordonnancement des activités industrielles (opens in a new tab)