Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 1 of 1 for “"Purchasing and shop floor control"”

  1. Considerations Involved in Implementing Material Requirements Planning in a Government Contractor Firm

    … their contractors for the purpose of monitoring and control. Many government contractors utilize a matrix organization structure to help cope with the government's ever changing and challenging requirements. It is both the government requirements and this matrix organization which lead to the …

    ucf Repository record for Considerations Involved in Implementing Material Requirements Planning in a Government Contractor Firm (opens in a new tab)