Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 3 of 3 for “"QTO"”.

  1. The State of BIM-Based Quantity Take-Off Implementation Among Commercial General Contractors

    … shows high potential is the quantity take-off (QTO) feature. Yet, its implementation among commercial general contractors (GC) has not received as much attention. The purpose of this study was to identify how the BIM QTO features were being implemented among commercial general contractors, what …

    byu Repository record for The State of BIM-Based Quantity Take-Off Implementation Among Commercial General Contractors (opens in a new tab) Download PDF for The State of BIM-Based Quantity Take-Off Implementation Among Commercial General Contractors (opens in a new tab)

  2. A Framework for BIM Model-Based Construction Cost Estimation

    … a framework to conduct a quantity take-off (QTO) and cost estimate within the Building Information Modeling (BIM) Environment. The product of this framework is a model-based cost estimating tool. The framework addresses the cost uncertainty associated with the detailed information defining …

    calpoly Repository record for A Framework for BIM Model-Based Construction Cost Estimation (opens in a new tab)

  3. A Knowledge-based system framework for semantic enrichment and automated detailed design in the AEC projects

    Adoption of a streamlined BIM workflow throughout the AEC projects’ lifecycle will provide the project stakeholders with the rich information embedded in the parametric design models. Users can incorporate this rich information in various activities, improving efficiency and productivity of project …

    gatech Repository record for A Knowledge-based system framework for semantic enrichment and automated detailed design in the AEC projects (opens in a new tab)