Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 6 of 6 for “"Quantity Take-Off (QTO)"”

  1. The State of BIM-Based Quantity Take-Off Implementation Among Commercial General Contractors

    … industry. Models are tools that help stakeholders communicate, visualize building geometry, perform trade coordination and clash detection among others. A less popular aspect of BIM that shows high potential is the quantity take-off (QTO) feature. Yet, its implementation among …

    byu Repository record for The State of BIM-Based Quantity Take-Off Implementation Among Commercial General Contractors (opens in a new tab)

  2. Evaluation of the reliability of BIM-based quantity take-off processes in construction projects

    Quantity take-off (QTO) process is a significant part of construction projects. Outputs of this process are used in many phases of the projects such as resource planning, scheduling, budgeting etc. Commonly, quantities are calculated by using 2D CAD drawings and CAD tools but this process requires …

    metu Repository record for Evaluation of the reliability of BIM-based quantity take-off processes in construction projects (opens in a new tab)

  3. A Framework for BIM Model-Based Construction Cost Estimation

    This thesis presents a framework to conduct a quantity take-off (QTO) and cost estimate within the Building Information Modeling (BIM) Environment. The product of this framework is a model-based cost estimating tool. The framework addresses the cost uncertainty associated with the detailed …

    calpoly Repository record for A Framework for BIM Model-Based Construction Cost Estimation (opens in a new tab)

  4. BIM-based formwork and cladding quantity take-off using visual programing

    Material quantity take-off (QTO) is an indispensable work item in construction projects since it is essentially utilized for scheduling and cost calculation. Traditionally, quantities are calculated based on 2D drawings, which require significant time. It is also an error-prone process because of …

    metu Repository record for BIM-based formwork and cladding quantity take-off using visual programing (opens in a new tab)

  5. Enhancing accuracy and security in BIM-based construction cost management leveraging AI and blockchain technologies

    … from cost overrun problems that lead to stakeholder disputes and potential failures in project deliveries. This highlights the critical role of effective construction cost management in ensuring the project adheres to a pre-agreed feasible cost framework. Nevertheless, traditional …

    hkust Repository record for Enhancing accuracy and security in BIM-based construction cost management leveraging AI and blockchain technologies (opens in a new tab)

  6. Příprava nabídky a informační management staveb

    … Práce dochází k závěru, že využitelnost DiMS pro QTO závisí především na kvalitě modelu, úrovni jeho geometrické podrobnosti a konzistenci klasifikace prvků, a že model nelze považovat za automaticky spolehlivý zdroj výkazu výměr.

    cz-tech Repository record for Příprava nabídky a informační management staveb (opens in a new tab)