Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 15 of 15 for “"Quantity take-off"”.

  1. A 3D modeling for detailed quantity take-off for building projects

    Quantity Take-off, the process of obtaining the dimensions and calculating the quantities from given plans and specifications, is perhaps the most basic and important phase in the detailed estimation of construction costs. The pricing strategies of cost estimation vary greatly in different …

    concordia Download PDF for A 3D modeling for detailed quantity take-off for building projects (opens in a new tab)

  2. The State of BIM-Based Quantity Take-Off Implementation Among Commercial General Contractors

    … industry. Models are tools that help stakeholders communicate, visualize building geometry, perform trade coordination and clash detection among others. A less popular aspect of BIM that shows high potential is the quantity take-off (QTO) feature. Yet, its implementation among …

    byu Repository record for The State of BIM-Based Quantity Take-Off Implementation Among Commercial General Contractors (opens in a new tab) Download PDF for The State of BIM-Based Quantity Take-Off Implementation Among Commercial General Contractors (opens in a new tab)

  3. AN INTEGRATED SOLUTION FOR NET-ZERO STRUCTURAL DESIGN USING BIM-BASED LIFE CYCLE ASSESSMENT AND ARTIFICIAL INTELLIGENCE

    … implemented in Revit and Dynamo with automated quantity take off, multi level reporting, and a hybrid color coding system that benchmarks each element against an optimized reference. Third, a hybrid GA and ANN optimization framework minimizes embodied carbon under Eurocode constraints at both …

    nus Repository record for AN INTEGRATED SOLUTION FOR NET-ZERO STRUCTURAL DESIGN USING BIM-BASED LIFE CYCLE ASSESSMENT AND ARTIFICIAL INTELLIGENCE (opens in a new tab) Download file for AN INTEGRATED SOLUTION FOR NET-ZERO STRUCTURAL DESIGN USING BIM-BASED LIFE CYCLE ASSESSMENT AND ARTIFICIAL INTELLIGENCE (opens in a new tab)

  4. Computer design of steel framed buildings

    … aid to make such studies practical in a design office. The program, developed on a mini-computer, is capable of designing structural components of steel framed buildings. These components include gravity columns and floor framing members such as simply supported beams and girders, cantilevers, …

    ubc Repository record for Computer design of steel framed buildings (opens in a new tab) Download PDF for Computer design of steel framed buildings (opens in a new tab)

  5. Current BIM Practices of Commercial MEP Contractors

    … prefabrication, design creation, and quantity take-off/cost estimating. Most MEP contractors have not yet incorporated BIM for scheduling, sequencing, or safety analysis. Additionally most MEP contractors did not have a formal BIM training program in their company.

    byu Repository record for Current BIM Practices of Commercial MEP Contractors (opens in a new tab) Download PDF for Current BIM Practices of Commercial MEP Contractors (opens in a new tab)

  6. Integrated cost budgeting and cost estimation model for building projects

    … model is implemented by integrating an automated quantity take-off system, with a relational database to generate cost estimate reports. The dynamic environment of the proposed model, streamlines the preparation of cost estimates in order to reflect, virtually instantly, the impact of changes in …

    concordia Download PDF for Integrated cost budgeting and cost estimation model for building projects (opens in a new tab)

  7. Integrated system for earthmoving operations

    … Linear Programming which determines optimum quantity of materials to be moved between different cut and fill sections, borrow pits and disposal sites. The standard Microsoft Excel Solver has been used to run the presented MILP model. This study also proposes an algorithm for determining …

    concordia Download PDF for Integrated system for earthmoving operations (opens in a new tab)

  8. A Framework for BIM Model-Based Construction Cost Estimation

    This thesis presents a framework to conduct a quantity take-off (QTO) and cost estimate within the Building Information Modeling (BIM) Environment. The product of this framework is a model-based cost estimating tool. The framework addresses the cost uncertainty associated with the detailed …

    calpoly Repository record for A Framework for BIM Model-Based Construction Cost Estimation (opens in a new tab)

  9. A framework to enhance the adoption of building information modelling amongst Sri Lankan quantity surveying organisations to increase the accuracy of pre-tender cost estimates

    … As a result, several studies have been undertaken to investigate the causes of cost overruns and found that inaccurate project cost estimates are a major reason for project cost overruns. Conventional tasks, such as manual quantity take-off, the use of 2D drawings, and a lack of information …

    salford Download PDF for A framework to enhance the adoption of building information modelling amongst Sri Lankan quantity surveying organisations to increase the accuracy of pre-tender cost estimates (opens in a new tab)

  10. A Knowledge-based system framework for semantic enrichment and automated detailed design in the AEC projects

    … projects’ lifecycle will provide the project stakeholders with the rich information embedded in the parametric design models. Users can incorporate this rich information in various activities, improving efficiency and productivity of project activities and potentially enhancing accuracy and …

    gatech Repository record for A Knowledge-based system framework for semantic enrichment and automated detailed design in the AEC projects (opens in a new tab)

  11. Study of Possible Applications of Currently Available Building Information Modeling Tools for the Analysis of Initial Costs and Energy Costs for Performing Life Cycle Cost Analysis

    … be generated is studied. The functions of the quantity take-off tools and estimating tools along with the interoperability between these tools are analyzed. The operating costs are generated from the software that focuses on sustainability. And the currently used tools for performing the …

    tamu Repository record for Study of Possible Applications of Currently Available Building Information Modeling Tools for the Analysis of Initial Costs and Energy Costs for Performing Life Cycle Cost Analysis (opens in a new tab)

  12. Southeast Connector

    … geotechnical survey, culvert design, earthworks quantity takeoff, flexible pavement design, environmental assessment, and an engineer estimate. Each of these topics is covered in full-depth in the report. Traffic elements include the lane configuration of the intersection of Pembroke Drive, the …

    unr Repository record for Southeast Connector (opens in a new tab)

  13. Detection and Segmentation of Bulk Material Heaps in Remote Sensing Imagery using Deep-Learning-based Computer Vision

    … prerequisite for inventory measurement, quantity take-off and process monitoring in the construction, mining and material handling industry. The approach proposed in this thesis is based on the fact that bulk material heaps do not contain significant overhangs. Therefore, the relevant …

    qucosa-diss