Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 20 of 21 for “"Quantity takeoff"”
-
Automation of Quantity Takeoff and Material Optimization for Residential Construction Manufacturing
Quantity takeoff is repetitive work in the modular construction industry. The current process, which is typically carried out manually, is time consuming and error-prone. This thesis proposes a methodology to automate the quantity takeoff process. The central aim of this research is to create a …
-
Building information modeling for construction applications : formwork installation and quantity takeoff
… the BC Hydro Substation project, and (2) BIM for quantity takeoff to support life-cycle assessment (LCA) and construction cost estimating on the Pharmaceutical Sciences project. The BC Hydro project provided an opportunity to examine the use of BIM for the field crew. I developed 3D coordinated …
-
Comparing Time and Accuracy of Building Information Modeling to On-Screen Takeoff for a Quantity Takeoff of a Conceptual Estimate
… The most tedious component of an estimate is the quantity takeoff. Different tools are available to improve an estimator's productivity for a quantity takeoff. Faster quantity takeoffs enable estimator to bid more jobs. This study analyzed the time and accuracy of performing quantity takeoffs when …
-
A Visual Approach to Construction Cost Estimating
… construction of a project. This is also known as quantity takeoff. Quantity takeoff is a very long and error-prone process that is performed manually by estimators. Missing or duplicating work items are among the errors that can occur during the quantity takeoff process. New Parametric CAD …
-
Building Information Modeling Integrated with Electronic Commerce Material Procurement and Supplier Performance Management System
… and practical value in construction material quantity takeoff and cost estimate. However, very few efforts have been directed to the application and integration of BIM in e-commerce material procurement. The author compares the present commercial BIM and non-BIM based quantity takeoff and cost …
-
Attitudes and Perspectives on BIM Adoption in Estimating
… have indicated that efficiency and accuracy of quantity takeoff can be increased through the adoption of BIM, but the industry usage for quantity takeoff continues to be low to moderate. Understanding construction professional’s views and attitudes toward the technology will help identify paths …
-
Total BIM in Swedish installation contracting; a comparative study of model-based and traditional ventilation contracting
… focused on three key areas: time spent on quantity takeoff, differences in cost estimation, and the workers’ experience with the installation process. The study also identifies several lessons and challenges related to the implementation of Total BIM. The results showed that model-based …
-
BIM-Based Data Mining Approach to Estimating Job Man-Hour Requirements in Structural Steel Fabrication
… concurrent steel-erection sites. Reliable quantity takeoff on each job and accurate estimation of shop fabrication man-hour requirements are crucial to plan and control fabrication operations and resource allocation on the shop floor. Building information modeling (BIM) is intended to …
-
The Use of Building Information Modeling in Generating Hard Bid Estimates
… a few of the contractors did use the model for quantity takeoff, and one actually used the quantities as the basis for the submitted bid. Additionally, the survey attempted to determine the prevailing attitudes of the estimators toward BIM as a tool in estimating, and their opinions of the …
-
A quantitative methodology for mapping project costs to engineering decisions in Naval Ship Design and procurement
… is not enough detail to allow for a traditional quantity takeoff estimate to be performed. Much of the budgeting process takes place during the early stages of a design and it is important to be able to develop a budget quality estimate so a design is allocated the necessary resources to meet …
-
BIM Implementation for Conventional On-site and Off-site Manufacturing Construction
… in processes such as drafting, 3D modelling, and quantity takeoff, practices to increase collaboration and a knowledge-sharing environment have been slow to develop. This research proposes a framework to integrate stakeholder information and workflow by applying the (i3) concept (information, …
-
Modelagem BIM para estimativa da geração de resíduos da construção civil: estudo de caso
… the waste generation rate based on the quantity takeoff tables generated by Revit software, making the process of waste characterization in the waste management plan more agile, efficient, and reliable.
-
Development of a method for recording energy costs and uses during the construction process
… designers, and owners. It is difficult to make a quantity takeoff for energy usage because these costs are imbedded in the materials, equipment, or overhead costs. This research examines energy consumption during the construction process, sets forth methods for recording this energy consumption …
-
Využití BIM modelu jako podkladu pro výkaz výměr
Tato bakalářská práce se zabývá problematikou tvorby výkazu výměr pomocí modelu BIM. V dnešní době se pomalu začínají tvořit výkazy výměr, ke kterým není potřeba projektová dokumentace, ale pouze samotný BIM model. Práce zkoumá, se kterými chybami se při tomto procesu lze setkat. Jejím cílem je …
-
Propuesta de una guía para mejorar la obtención de los metrados en la partida de encofrados en proyectos del sector público utilizando la metodología BIM (Revit + Dynamo) y Power BI: Caso de estudio Centro Cívico de Kimbiri
El presente trabajo de investigación tiene como objetivo proponer una guía técnica que mejore la obtención de metrados de la partida de encofrados en proyectos del sector público, mediante la aplicación de la metodología BIM con el uso de Autodesk Revit, Dynamo y Power BI, tomando como caso de …
-
Developing a sustainable construction waste estimation and management system
… principle, work breakdown structure, material quantity takeoff, conversion ratios between different waste measurement units and the wastage levels of various materials used in different work packages.</p><p>Furthermore, a more sophisticated construction waste model is presented by considering …
-
Southeast Connector
… geotechnical survey, culvert design, earthworks quantity takeoff, flexible pavement design, environmental assessment, and an engineer estimate. Each of these topics is covered in full-depth in the report. Traffic elements include the lane configuration of the intersection of Pembroke Drive, the …
-
Srovnání využití informačního modelu a tradiční projektové dokumentace pro tvorbu výkazu výměr
Bakalářská práce se zabývá srovnáním ve využití informačního modelu a tradiční projektové dokumentace pro tvorbu výkazu výměr. Informační modelování využívá automatického vykazování výměr z vymodelovaných objektů. Zatímco při tradičním projektování rozpočtář výkazy počítá manuálně, z čehož můžou …
Page 1 of 2