Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 7 of 7 for “"Rammed Aggregate Piers"”.
-
Support mechanism of rammed aggregate piers
… element model to study the behavior of isolated rammed aggregate piers subjected to compressive load. The load transfer mechanism along pier shaft and pier-soil interactions is particularly investigated in this paper. Constitutive parameters of the materials involved in the numerical analysis …
-
Embankment foundation reinforcement using rammed aggregate piers in Iowa soils
… and preloading (preconsolidation) methods, rammed aggregate piers (Geopier[Superscript registered trademark symbol] foundation elements) were installed within and around the Ramp "C" abutment footprint for the I-35 overpass at the Hwy 5/I-35 interchange in Des Moines, IA. The rammed …
-
Effectiveness of Compacted Fill and Rammed Aggregate Piers for Increasing Lateral Resistance of Pile Foundations
Compacted fill and rammed aggregate piers (RAPs) were separately installed adjacent to a 9-ft by 9-ft by 2.5-ft driven pile foundation founded in soft clay. The compacted fill used to laterally reinforce an area of 11 ft by 5 ft by 6 ft deep adjacent to the pile cap was clean concrete sand. The …
-
Numerical Analysis of RAP Elements under Dynamic Loading
… field testing program was initiated and Rammed Aggregate Piers� (RAP) were shown to be a feasible method to mitigate the risk from liquefaction during future events. To better design and more fully assess the efficacy of reinforcement techniques against liquefaction, pre- and …
-
Performance of a full-scale Rammed Aggregate Pier group in silty sand based on blast-induced liquefaction testing in Emilia-Romagna, Italy
… the liquefaction mitigation capability of Rammed Aggregate Piers® (RAP) in silty sand, blast liquefaction testing was performed at a soil profile treated with a full-scale RAP group relative to an untreated soil profile. The RAP group consisted of 16 piers in a 4x4 arrangement at 2 m …
-
Propuesta de diseño de mejoramiento de suelos con pilas de agregado compactado en cimientos corridos del hospital San Martin de Pangoa - Junín
… mejoramiento de suelo se utilizó la metodología Rammed Aggregate Piers o RAP en castellano seria pilas de grava compactada, para el mejoramiento de suelos donde se cimentará. El objetivo de este sistema es minimizar los asentamientos diferenciales por efecto de las cargas de servicio que ejerce …
-
The novel application of sensor technologies to monitor long-term vertical track displacement pre and post rehabilitation
… The section of track was then rehabilitated with rammed aggregate piers, which were installed in pairs between every other tie in the settlement zone. Digital Image Correlation (DIC) and SAAs were used to measure the instantaneous and long-term displacement of the track, respectively, in order to …