Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 132 for “"Ramp-Up"”.
-
Investigations Toward Power Ramp-up of FRIB and Increasing Scientific Reach
Thesis (Ph.D.)--Michigan State University. Physics - Doctor of Philosophy, 2025
-
A Comprehensive Methodology For Well Ramp-up of Open Hole Stand-Alone Screen Completions
… fluids, wells face the most critical step of ramping up production toward a peak rate for the first time. The challenge is delivering the maximum rate with limited well performance information and without damaging the completion integrity at the same time. This research develops a production …
-
Ridership Ramp-Up for Fixed-Guideway Transit Projects: An Evaluation of Initial Ridership Variation
… a process commonly referred to as ridership ramp-up. While this idea is both intuitive and appealing, especially for projects that seem to be underperforming in their initial years, there is a need for empirical analysis to determine the typical magnitude and extent of ridership ramp up in …
-
REUSE OR TABULA RASA? AN INVESTIGATION ON THE FUTURE OF RAMP-UP FACTORIES IN JURONG WEST
… buildings in the area, specifically the ramp-up factory typology that is unique to land-scarce Singapore. As opposed to building replacement, the paper aims to testify adaptive reuse as a more environmental means of redevelopment, by prototyping a framework of strategies based on …
-
THE TRANSIENT SITUATION : RE-APPROPRIATING THE WAY WE HOUSE TRANSIENT WORKERS
… of worker’s dormitories with the light ramp-up factory typology to intensify the land use of our low-density industrial zones, bring mixed-use to the existing mono-functional industrial districts, and in turn provide more living space for the transient workers by tapping into the …
-
Effect of Reconfiguration Characteristics on Manufacturing System Capacity Selection
… force today's companies to continuously upgrade their production capacities. The frequent revision of production capacities and the capacity loss during this period increase the importance of ramp up duration in evaluating capacity investments. This thesis aims to explore how a firm …
-
Upward Gas-Liquid Flow in Concentric and Eccentric Annular Spaces
A limited amount of work exists on upward gas-liquid flow in annular spaces. This is a common scenario in drilling operations, especially in underbalanced drilling, and in high-production wells. To carry out this study, a 40-meter high laboratory facility with an annulus flow loop composed of a …
-
Modified Decline Curve Analysis Workflow Aids Forecast Certainty
… reservoirs. These flow regimes are ramp-up, transient, transition, and boundary-dominated flow. Arps parameters used in forecasting should be different for each of the observed flow regimes; therefore, a multi-segment model can be used. Current operator practice in the oil and gas …
-
Innovative defense acquisition concept Deployer Equipment Bundle (DEB)
… readiness and buys time for industrial base ramp-up. The Deployer Equipment Bundle (DEB) concept would outfit early deploying brigade combat teams (BCTs) to the next major contingency with the most modern, lifesaving equipment available, providing sufficient buffer stock to enable the …
-
Hygrothermal Effects on Viscoelastic Properties of Amine-Hardened Epoxy
… after exposure to hygrothermal conditions for up to 2400 hours. The objectives of the study were to determine the diffusion coefficient, the viscoelastic and glass transition temperature changes as result of long-term aging. Due to the large number of samples required, inherent material …
-
MARTINI : smart meter driven estimation of HVAC schedules and energy savings based on WiFi sensing and clustering
… increased and decreased respectively during unoccupied periods with the goal of obtaining energy savings. However, knowledge of a building’s real occupancy is required to maximize the success of this measure. In addition, there is the need for a scalable way to estimate energy savings potential …
-
Computer aided design for work injury elimination in production assembly systems
… more efficient manner – perhaps reduction of the ramp-up process in the automobile industry from 6 months (typically) to one month in addition to the removal of wasted materials and potential injuries in the ramp-up process.
-
Transient Temperature Analysis of SAGD Processes
… (TTA) to evaluate the earlystage SAGD (start-up and ramp-up) steam conformance through analyzing the temperature falloff data after shut-in. Both forward and inverse mathematical models are presented to facilitate the application of this technique. The four 2D forward mathematic models, …
Page 1 of 7