Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 6 of 6 for “"Re-entrant flow"”

  1. Automation techniques for short interval scheduling in a complex manufacturing environment

    Aircraft Company X (ACX) designs and manufactures aircraft. ACX operates Manufacturing Center 1 which produces parts and assemblies for both assembly and spares business lines. Accurate scheduling is crucial for meeting demand and the on time delivery of parts, a key driver of customer …

    mit Repository record for Automation techniques for short interval scheduling in a complex manufacturing environment (opens in a new tab)

  2. THREE ESSAYS ON PRODUCTION AND INVENTORY MANAGEMENT

    <p>This dissertation consists of three essays that address issues in production and inventory management.</p> <p>The first essay focuses on inventory management. We study a fixed-reorder-interval, order-up-to <em>(R, nT)</em> inventory replenishment policy in a two-stage serial system with …

    ohiolink Repository record for THREE ESSAYS ON PRODUCTION AND INVENTORY MANAGEMENT (opens in a new tab)

  3. Simulation of Cloud Cavitation: Evaluation and Qualitative Assessment of Turbulence Predicted by k-omega SST and k-omega SAS Models

    Cloud cavitation is a strongly unsteady two-phase flow in which vapor formation, cavity shedding, collapse, and turbulence interact over a wide range of spatial and temporal scales. In numerical simulations, these processes are commonly modeled using Reynolds-averaged or scale-adaptive turbulence …

    vt Repository record for Simulation of Cloud Cavitation: Evaluation and Qualitative Assessment of Turbulence Predicted by k-omega SST and k-omega SAS Models (opens in a new tab)

  4. Assembly and test operations with multipass requirement in semiconductor manufacturing

    In semiconductor manufacturing, wafers are grouped into lots and sent to a separate facility for assembly and test (AT) before being shipped to the customer. Up to a dozen operations are required during AT. The facility in which these operations are performed is a reentrant flow shop consisting of …

    texas Repository record for Assembly and test operations with multipass requirement in semiconductor manufacturing (opens in a new tab)

  5. Makespan Minimization in Re-entrant Permutation Flow Shops

    Re-entrant permutation flow shop problems occur in practical applications such as wafer manufacturing, paint shops, mold and die processes and textile industry. A re-entrant material flow means that the production jobs need to visit at least one working station multiple times. A comprehensive …

    qucosa-diss Repository record for Makespan Minimization in Re-entrant Permutation Flow Shops (opens in a new tab)