Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 20 of 29 for “"Replacement Decision"”

  1. The Impact of Relational Switching Costs on the Decision to Retain or Replace IT Outsourcing Vendors

    … from the experience of other vendors. The decision to replace or retain vendors thus involves considering the costs and benefits of switching. This study examines how relational switching costs affect this decision, and how organisations perceive them vis-à-vis other types of costs. The …

    auckland-tech Repository record for The Impact of Relational Switching Costs on the Decision to Retain or Replace IT Outsourcing Vendors (opens in a new tab)

  2. Condition Based Maintenance Decision Making with Delay Time Modeling

    … based maintenance models for better maintenance decisions. We address a condition and age based replacement decision problem using the complete history of measured condition observations to minimize long-run average cost or maximize long-run average availability, or both. To estimate the residual …

    alberta Repository record for Condition Based Maintenance Decision Making with Delay Time Modeling (opens in a new tab)

  3. Energy analysis and diagnostics in wood manufacturing industry

    … downsizing, an extensive analysis of the motor replacement decision is performed using the Motor Master + software. (Abstract shortened by UMI.).

    wvu Repository record for Energy analysis and diagnostics in wood manufacturing industry (opens in a new tab)

  4. Development of Optimal Migration Plan for New Traffic Signal Controllers Using Gis and Multi-Criteria Decision Making

    Signal Replacement decisions are often made based on the experience of the Traffic Engineers. These decisions are made while considering the deployment time of the system, the new technology available, and the performance of the system in the given location. However, there is no set of proper …

    vt Repository record for Development of Optimal Migration Plan for New Traffic Signal Controllers Using Gis and Multi-Criteria Decision Making (opens in a new tab)

  5. Prediction Intervals of Railway Tie Deterioration

    … tackle the model's uncertainty and make a robust decision-making prediction model, prediction intervals are constructed using the bootstrap method. Tie deterioration prediction model will help estimate the number of good ties and bad ties milepost wise, which helps in tie replacement …

    buffalo Repository record for Prediction Intervals of Railway Tie Deterioration (opens in a new tab)

  6. Capital replacement modelling with a fixed planning horizon

    For equipment or plant replacement, when to replace an existing plant, fleet or apart of it, is one of the main concerns in decision-making. The thesis considersthis decision-making problem using capital replacement models with a fixedplanning horizon, and we took at the behaviour of optimal policy …

    salford

  7. Capital replacement modelling with a fixed planning horizon

    For equipment or plant replacement, when to replace an existing plant, fleet or apart of it, is one of the main concerns in decision-making. The thesis considersthis decision-making problem using capital replacement models with a fixedplanning horizon, and we took at the behaviour of optimal policy …

    salford Repository record for Capital replacement modelling with a fixed planning horizon (opens in a new tab)

  8. Practical Application of Machine Learning to Water Pipe Failure Prediction

    … rising water main break rates and insufficient replacement funds. Machine learning is a promising tool to support efficient water pipe replacement decisions. This thesis explores the practical application of machine learning for water pipe failure prediction using a dataset of over 10 million …

    waterloo Repository record for Practical Application of Machine Learning to Water Pipe Failure Prediction (opens in a new tab)

  9. State and parameter estimation techniques for stochastic systems

    … filteringapproach to establish an adaptive decision model. The decision model can be used toschedule the subsequent maintenance intervention during the course of anoperational cycle and can potentially provide an improvement on fixed intervalmaintenance policies.The second problem scenario …

    salford

  10. State and parameter estimation techniques for stochastic systems

    … filteringapproach to establish an adaptive decision model. The decision model can be used toschedule the subsequent maintenance intervention during the course of anoperational cycle and can potentially provide an improvement on fixed intervalmaintenance policies.The second problem scenario …

    salford Repository record for State and parameter estimation techniques for stochastic systems (opens in a new tab)

  11. Optimum life of production assets in short and medium term timber harvesting projects

    An optimal equipment replacement model was developed, that is useful for evaluating machinery replacement proposals. The model is based on discounted cash flow methods, and performs the evaluation by comparing the cash flow profile of the currently owned machine (the "defender") against that of a …

    ubc Repository record for Optimum life of production assets in short and medium term timber harvesting projects (opens in a new tab)

  12. Corporate wrongdoing exposure and recovery time: A two-study examination of direct and moderating effects

    … However, this varies based on the CEO replacement decision (i.e., no turnover, inside succession, outside succession). Together, these studies show that firms can work to destigmatize after corporate wrongdoing, mitigating the long-term negative effects of stigma (Hampel et al. 2016).

    ttu Repository record for Corporate wrongdoing exposure and recovery time: A two-study examination of direct and moderating effects (opens in a new tab)

  13. Energy Considerations for Pipe Replacement in Water Distribution Systems

    … managers need to take a holistic approach to decision-making in order to determine all of the impacts of their plans. The intention of this thesis is to present a set of considerations for utility planners and managers to provide clarity to the trade-offs associated with any pipe replacement …

    queens Repository record for Energy Considerations for Pipe Replacement in Water Distribution Systems (opens in a new tab)

  14. Stochastic modelling and maintenance optimization of systems subject to deterioration

    … optimal preventive maintenance scheduling model (decision model) and optimal maintenance-repair and inspection-scheduling model (intensity control model). In chapter 4 under both periodic and non-periodic inspection policy a novel approach to the determination of optimal repair and replacement …

    city-london Repository record for Stochastic modelling and maintenance optimization of systems subject to deterioration (opens in a new tab)

  15. An Optimal Pipe Replacement Scheduling Model for Water Distribution Systems

    … rate equation gives a rule of thumb for pipe replacement decision. Input parameters to obtain the threshold break rate of a pipe are repair and replacement costs, interest rate, and the length of the pipe. In addition, a methodology that enables the use of threshold break rate with the failure …

    vt Repository record for An Optimal Pipe Replacement Scheduling Model for Water Distribution Systems (opens in a new tab)

  16. Equipment replacement analysis for publicly owned fleets

    … some method of prioritizing the equipment replacement list. -- In order to effectively plan equipment replacement purchases, the fleet manager must have the ability to forecast future costs. In some cases, geographic location has an impact on delivery time of new equipment to the public …

    newfoundland Repository record for Equipment replacement analysis for publicly owned fleets (opens in a new tab)

  17. Fragility Analysis of Instream Bridges Subjected to Flood and Scour

    … is essential for making repair, maintenance, and replacement decision in a rational way to maximize the utilities of limited resources. The current flood vulnerability assessment method of bridges is based on visual inspection hence subjective in nature, which does not consider associated …

    arizona-thes Repository record for Fragility Analysis of Instream Bridges Subjected to Flood and Scour (opens in a new tab)

  18. Sequential Decision-Making Models and Algorithms for Piping Maintenance Optimization

    … or corrective maintenance activities, usually replacements, are carried out. It is crucial to have an optimal maintenance policy for the piping system replacement to minimize the total maintenance cost and prevent the consequences associated with a failed pipe. The research also explores two …

    ttu Repository record for Sequential Decision-Making Models and Algorithms for Piping Maintenance Optimization (opens in a new tab)

Page 1 of 2