  1. Lowest Price, Technically Acceptable evaluation criteria used in the November 2014 request for proposal for the program executive office soldier Systems Engineering and Technical Assistance (SETA) contract

    … analyzed aspects of the evaluation process for replies received in response to a request for proposal (RFP) for systems engineering and technical assistance (SETA) support. This was an objective analysis of the risks associated with the U.S. government’s (USG) use of LPTA for a specific SETA …

    nps Repository record for Lowest Price, Technically Acceptable evaluation criteria used in the November 2014 request for proposal for the program executive office soldier Systems Engineering and Technical Assistance (SETA) contract (opens in a new tab)

  2. An evaluation of the acquisition streamlining methods at the Fleet and Industrial Supply Center Oakland

    … issuance of a draft Statement of Work (SOW)/Request for Proposal (RFP), utilization of early synopsis and development of a management information system

    nps Repository record for An evaluation of the acquisition streamlining methods at the Fleet and Industrial Supply Center Oakland (opens in a new tab)

  3. A Project Plan for Software that Advances Museums' Prospect Research Effectiveness

    Due to intense competition for donations from a limited pool of individuals who are inclined to support museums, these institutions are increasingly challenged to engage their donors on many levels. The aim of this capstone is to provide museums with a project plan for software that facilitates …

    usfca Repository record for A Project Plan for Software that Advances Museums' Prospect Research Effectiveness (opens in a new tab)

  4. A study of the processes, methjods and techniques used in negotiated or Best Value procurements of construction services

    … process is awarding the contract to perform the construction in a timely manner to a qualified contractor. The owner must choose a delivery method and a selection method. The four basic delivery methods are: Traditional Design-Bid-Build, Construction Management, Design-Build, and …

    nps Repository record for A study of the processes, methjods and techniques used in negotiated or Best Value procurements of construction services (opens in a new tab)

  5. ANALYSIS OF VALUE ADJUSTED TOTAL EVALUATED PRICE (VATEP) SOURCE SELECTION METHOD

    … production (LRIP) and full rate production (FRP) request for proposal. The authors assessed mathematical calculations utilized in the evaluation of the total evaluated cost/price factor, and a risk assessment was conducted. The authors found that VATEP is a great tool to incentivize …

    nps Repository record for ANALYSIS OF VALUE ADJUSTED TOTAL EVALUATED PRICE (VATEP) SOURCE SELECTION METHOD (opens in a new tab)

  6. I Can! Kid-Abilities Day Brooklyn Children's Museum

    This capstone project lays out a project plan for an annual event for children with disabilities, I Can! Kid -Abilities Day, presented at the Brooklyn Children's Museum on October 121 h, 2014. The project is based on my experience organizing this educational event. I focus on the operational needs …

    usfca Repository record for I Can! Kid-Abilities Day Brooklyn Children's Museum (opens in a new tab)

  7. Cost Estimation and Production Evaluation for Hopper Dredges

    … suction hopper dredge project or bidding on the request for proposal for such a project, having an accurate cost prediction is essential. This thesis presents a method using fluid transport fundamentals and pump power characteristics to determine a production rate for hopper dredges. With a …

    tamu Repository record for Cost Estimation and Production Evaluation for Hopper Dredges (opens in a new tab)

  8. Curating Adjacent Shores: A Contemporary Art Exhibition at USF's Thacher Gallery

    This capstone is a project management plan for the curation of a real-world contemporary art exhibition at the University of San Francisco’s Mary and Carter Thacher Gallery. Adjacent Shores: Hughen Starkweather was on view from March 7 through April 24 of 2016, and featured an eighteenth century …

    usfca Repository record for Curating Adjacent Shores: A Contemporary Art Exhibition at USF's Thacher Gallery (opens in a new tab)

  9. A model for the effective integration of past performance information into organizational acquisition and contracting processes

    … make trade-offs between cost or price, past performance, and technical merit to ensure the best value to the Government. One of the tools that Government procurement officials have for reducing procurement risk is the ability to request, via the request for proposal, information regarding a …

    nps Repository record for A model for the effective integration of past performance information into organizational acquisition and contracting processes (opens in a new tab)

  10. Targeting and fire control system analysis of the New Turkish Attack Helicopter "The AH-1Z Kingcobra"

    In May of 1997, the Turkish Military issued a Request for Proposal for the purchase of 145 attack helicopters. Turkey has chosen Bell Helicopter's KingCobra as its attack helicopter. The major difference between the USMC version of AH-1Z and the Turkish version KingCobra is the Targeting and Fire …

    nps Repository record for Targeting and fire control system analysis of the New Turkish Attack Helicopter "The AH-1Z Kingcobra" (opens in a new tab)

  11. Cost estimating in the Department of Defense and areas for improvement

    … the IGCE, the Cost Estimation Process, the Request for Proposal (RFP), and the Technical Evaluation. Our purpose was to highlight and prove that the cost-estimation process is the heart of the acquisition process, and that it merges and coordinates the other processes so that the government …

    nps Repository record for Cost estimating in the Department of Defense and areas for improvement (opens in a new tab)

  12. Relationship between procurement duration and project performance in design-build water/wastewater projects

    … lowered risk to the owner, improved project performance, and possibly reduced cost. Researchers have also studied the factors related to the improved performance in DB projects, especially in the building and transportation industries. Compared to the building and highway industries, the …

    unm Repository record for Relationship between procurement duration and project performance in design-build water/wastewater projects (opens in a new tab)

  13. Gestión de proyectos académicos para la acreditación ABET de la DAISIISCC

    … de las carreras de Ingeniería de Sistemas de Información e Ingeniería de Software. La gestión del proyecto interno de mejoras se enfoca en la implementación de nuevas funcionalidades al Sistema de Acreditación ABET 2014 con el fin de permitir la generación de evidencias desde estas nuevas …

    upc-peru Repository record for Gestión de proyectos académicos para la acreditación ABET de la DAISIISCC (opens in a new tab)

  14. A model of electronic warfare systems acquisition and engineering for Saudi Arabia

    … systems, planning this phase looks too technical for top management and too broad for the engineers specialized in narrow technical fields. This categorization (too technical/too broad) represents a gap between top management and specialized engineering. In Saudi Arabia, such a gap is believed to …

    must-thes Repository record for A model of electronic warfare systems acquisition and engineering for Saudi Arabia (opens in a new tab)

  15. DEVELOPMENT OF THE ECOCAR 3 PROPOSAL AND GUIDELINES FOR MODELING AND DESIGN IN YEAR ONE OF ECOCAR 3

    This report summarizes the work done for the Vehicle Powertrain Modeling and Design Problem Proposal portion of the EcoCAR3 proposal as specified in the Request for Proposal from Argonne National Laboratory. The results of the modeling exercises presented in the proposal showed that: An average …

    mtu Repository record for DEVELOPMENT OF THE ECOCAR 3 PROPOSAL AND GUIDELINES FOR MODELING AND DESIGN IN YEAR ONE OF ECOCAR 3 (opens in a new tab)

  16. A Framework for Virtual Leadership Development Training in the Intelligence Community

    … Community (IC)|leadership can use as a framework for creating or soliciting contract proposals to transition leadership development courses from the current face-to-face format to the virtual environment.|Face-to-face leadership development courses provided by IC agencies to employees are costly, …

    creighton Repository record for A Framework for Virtual Leadership Development Training in the Intelligence Community (opens in a new tab)

  17. Design-Build and CM at Risk- comparative analysis for owner decision making based on case studies and project surveys

    … believe that effective delivery systems for construction projects are key to improving project quality and value in the construction industry. Therefore, it is important that owners use the best project delivery system because there are significant consequence due to differences in …

    tamu Repository record for Design-Build and CM at Risk- comparative analysis for owner decision making based on case studies and project surveys (opens in a new tab)

  18. Adaptive Reuse: a chamber symphony for 13 musicians

    … in four continuous movements and is scored for 13 musicians: 1 flute (doubling piccolo); 1 oboe (doubling English horn); 1 B-flat clarinet (doubling bass clarinet); 1 horn in F; 1 trumpet in C; 1 percussionist (quad toms and vibraphone); 3 violins; 2 violas; 1 cello; and 1 double bass. The …

    maryland Repository record for Adaptive Reuse: a chamber symphony for 13 musicians (opens in a new tab)

  19. Preliminary Turboshaft Engine Design Methodology for Rotorcraft Applications

    … of individual rotorcraft design disciplines therefore, the use of an integrated product and process development (IPPD) methodology is necessary to drive the design solution. Through the use of parallel design and analysis, this approach achieves the design synthesis of numerous product and process …

    gatech Repository record for Preliminary Turboshaft Engine Design Methodology for Rotorcraft Applications (opens in a new tab)

  20. The development of a bidding and award process map for road PPP projects in Ghana

    … consequences. It has recently become necessary for private sector participation in the supply of this critical infrastructure to lessen the economic challenges of the country. However, very little has been accomplished in this regard due to scepticism, bankability issues, lack of standardised …

    salford Download PDF for The development of a bidding and award process map for road PPP projects in Ghana (opens in a new tab)