Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 49 for “"Resource estimation"”.
-
Reactive Prediction Models for Cloud Resource Estimation
… of this thesis is to propose a new reactive resource estimation model to achieve more reasonable resource allocation and higher server utilization for cloud providers. The model is flexible enough to adapt to different situations given the current server utilization, the customer loyalty, the …
-
Change of support correction in mineral resource estimation
… then there is a high probability of incorrect estimation of the tonnage and the grade of ore, and this can have serious implications for the economic side of the mining project. Various techniques for correction for the change of support of data, in other words change of the volume on which the …
-
Quantum Computational Particle Physics: Algorithms, Resource Estimation, and Model-Building
… and minimize fault-tolerant computational resource requirements of quantum simulations of lattice gauge theories so that they can be implemented sooner than later. To this end, complete gate-by-gate quantum algorithms with concrete fault-tolerant resource estimates are constructed to …
-
RISK CONTROL IN PRODUCTION SCHEDULING BY CONSIDERING VOLUME AND GRADE UNCERTAINTIES IN RESOURCE ESTIMATION
… and geological controls increases difficulty in resource estimation. In these situations, volume (tonnage) and grade are often over- or underestimated, resulting in inaccurate mine plan that leads to costly financial decisions. In this study, a multiple-point geostatistical method, namely Single …
-
Geostatistical Analysis of Vein Geometry: A Comparative Study and Proposed Framework for Improved Resource Estimation
… These delineations are crucial for precise resource estimation and directly impact the economic viability of mining projects. Existing methodologies, including conventional geostatistical techniques, often fail to adequately capture the complex geological nature of vein deposits, potentially …
-
The application of the jackknife in geostatistical resource estimation: Robust estimator and its measure of uncertainty.
… application of the jackknife in geostatistical resource estimation (in conjunction with kriging) is shown to yield two significant contributions. The first one is a robust new estimator, called jackknife kriging, which retains ordinary kriging's simplicity and global unbiasedness while at the …
-
Resource estimation of roll front uranium deposits by using traditional and machine learning methods for Nichols Ranch uranium deposit in Wyoming
The fundamental component of resource estimation is domain modeling. However, in such deposits like roll front uranium is deposited in sandstone and on the contact of oxidized and reduced rock domains which makes it difficult to model. Grade - Thickness (GT) contour method is one of the most …
-
Migration and gamma ray assessment of uranium on a gold tailings disposal facility
… methods as alternative methods for uranium resource estimation modelling in gold tailings. Uranium migration within the New Machavie TDF was also investigated as migration affects both the grade of the TDF as a uranium resource and poses a threat to the environment. In order to determine the …
-
Ore reserve estimation, Silver Queen vein, Owen Lake, British Columbia
… a 2-dimensional problem for purposes of reserve/resource estimation. Complexities in obtaining reserve/resource estimates arise from (i) uncertainties in geological interpolation and extrapolation of the vein system, (ii) uncertainties in the distinction between vein and highly altered wallrock …
-
Analysis and evaluation of computer support for afloat submarine IMA maintenance planning
… maintenance planning process. The Maintenance Resource Management System's (MRMS) Engineered Time Value standards provide significant improvement in resource estimation accuracy over the Maintenance and Material Management (3-M) Intermediate Maintenance Management System (IMMS). However, both …
-
Constraints and quantifying uncertainty on resource domain boundaries
… of mineralisation is a critical step of mineral resource estimation in the mining industry. Mineralisation zones are defined by domains used to determine the distribution of target minerals via established mineral resource estimation procedures. These domains can be modelled using manual …
-
Integration of built in self test during behavioural synthesis
… novel and accurate incrementally iterative BIST resource estimation methods and integrating them within a unified synthesis flow. BIST resource estimation is done from the target architecture control path of the design behaviour during design space exploration. In the proposed integration for …
-
Multivariate Simulation Using A Locally Varying Coregionalization Model
… show complex relationships, posing a problem for resource modeling. The thesis proposes three novel methodologies, based on recent developments in geometry, with the unique motivation of extracting as much information as possible from a given multivariate data set sampled in a geographical domain …
-
Optimization of long-term quarry production planning to supply raw materials for cement plants
… sensitive to geological uncertainty in resource estimation, resulting in the deviation of the supply production of raw materials. More importantly, quarry managers lack the means to deal with these requirements of LTQPP. This research develops a stochastic optimization framework based on …
-
Delta-Sigma Modulator for Wideband and Multi-Band Radio Systems
… on wideband signals while being power and resource efficient. In this thesis, the utilization of delta-sigma modulators for wideband and multi-band applications in both the receiver and transmitter is addressed. The first model proposes a low-complexity frequency band decomposition-based …
-
Geometallurgical resource assessment for tailings storage facilities
… decreasing the volumes of tailings to be stored. Resource modelling of TSFs is complicated by their heterogeneity, which results from the sedimentary-style deposition of tailings, as well as post-depositional processes like weathering. Tailings particles are sorted based on size and density (i.e., …
-
Mesh sensitivity analysis on wind farms using CFD wind flow models and CFD wake models
… coming decades. A very effective tool for wind resource estimation is computational fluid dynamics (CFD). This technique solves the flow motion governing equations taking into account the recirculation effects and flow separation. Obviously, CFD results depend not only on modeling set up but …
-
Implementation of Long Short-Term Memory Neural Networks in High-Level Synthesis Targeting FPGAs
… to the complex implementation and significant resource demands. Thus, the need for FPGA resource estimation, as well as a means to simplify ML implementation on FPGAs is being fulfilled by HLS4ML [1] (High-Level Synthesis for Machine Learning). HLS4ML is a framework that translates traditional …
-
Modeling Logical Error Rates in Surface-Code Quantum Computing based on Lattice Surgery and Applications
… compact, reusable, and directly applicable to resource estimation and architecture-level studies. Together, these results provide a practical bridge between low-level hardware characteristics and high-level fault-tolerant quantum computation, enabling more informed design and evaluation of …
Page 1 of 3