Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 18 of 18 for “"Resource leveling"”.
-
Resource leveling and linear scheduling
Resource leveling in the context of linear scheduling has been explored in this thesis. Multilocation projects such as high rise construction, bridges and so forth have special characteristics which should be taken into account in resource leveling procedures - e.g., flow line characteristics …
-
A neural network model for resource leveling
A new neural network model aimed at solving the resource leveling (RL) problem in construction is developed. The model is derived by mapping a formulation of the RL problem as a quadratic augmented Lagrangian multiplier (QALM) optimization, onto an artificial neural network (ANN) architecture …
-
A multi-resource leveling algorithm for project networks.
… extension to the Burgess and Killebrew heuristic resource leveling procedure for project networks. In contrast to previous algorithms appearing in the literature, the objective function of this algorithm is the minimization of the sum of the squared errors in each time period (deviations around …
-
The U.S. Coast Guard 87’ Patrol Boat Maintenance Program: An Analysis of a Scheduling and Resource Leveling Problem
… balance between software-based scheduling, resource loading, and risk mitigation strategies. The U.S. Coast Guard Industrial Yard, through use of Oracle’s Primavera software, has historically used the Critical Path Method (CPM) of scheduling for their maintenance projects. With the …
-
Νοήμονες μέθοδοι επίλυσης προβλημάτων εξομάλυνσης πόρων σε έργα
The present thesis deals with Resource Leveling optimization problems in projects. Resourceleveling is a problem that has not been accurately solved so far, for large scale projects. Forsmall scale projects accurate solutions can be found in literature, achieving global optimum. Formedium and large …
-
Balancing labor requirements in a manufacturing environment
… projects with multiple execution modes and resource constraints. The model is developed to represent real-world conditions in which project activities do not have a fixed, prespecified duration but rather a total amount of work that is directly impacted by the level of resources assigned. To …
-
Multi-objective optimization for resource driven scheduling in construction projects
… many capabilities and contributions of available resource-driven scheduling techniques and models, they still suffer from a number of important limitations including their inability to (1) provide efficient resource utilization schedules that are capable of directly measuring and minimizing the …
-
Ανάπτυξη υπερευρετικών αλγορίθμων για τον χρονοπρογραμματισμό έργων
… in this study. Chapter 3 describes the classic resource-constrained project scheduling problem, and the recent literature is referred. The extensions of the classic problem are illustrated, as well, including the resource leveling problem, and the resource availability cost problem/ resource …
-
The design and implementation of a real-time distributed application emulator
… distributed systems, and as a programmable resource consumer. The AE system is currently being used in the HiPer-D test bed to activate a resource leveling tool that monitors several software components for real-time response. The AE system is highly flexible and can be used in the context …
-
The Use of Computers in Construction Management
… such as the bar chart b. to solve the problem of resource leveling with a method named the Minimum Moment Algorithm.
-
Determination of project duration for resource constrained projects without using resource scheduling procedure
… of equating measures of network and resource characteristics to the early finish date of a project which is constrained by resources. The output of standard critical path calculations along with information on resource profiles that are easy to calculate can be of use in estimating …
-
Ανάπτυξη συστήματος υποστήριξης αποφάσεων για τον χρονοπρογραμματισμό έργων με χρήση μεταευρετικών και πολυσκοπικών αλγόριθμων
… algorithms. Chapter 6 presents a new model for resource leveling. The problem is treated as multi-objective -minimizing simultaneously resource leveling and the duration of the project, and is resolved by the three Pareto metaheuristics. Chapter 7 is devoted to the construction of the …
-
Optimized Resource-Constrained Method for Project Schedule Compression
… project execution. This acceleration requires resource planning techniques such as resource leveling and allocation. Various optimization methods have been proposed for the resource-constrained schedule compression and resource allocation and leveling individually. However, in real-world …
-
A Decision Support System for Dynamic Integrated Project Scheduling and Equipment Operation Planning
Common practice in scheduling under limited resource availability is to first schedule activities with the assumption of unlimited resources, and then assign required resources to activities until available resources are exhausted. The process of matching a feasible resource plan with a feasible …
-
EVOLVING CONSTRUCTION SCHEDULES UNDER RESOURCE CONSTRAINTS
… studies the problem of project scheduling under resource constraints and employs a evolutionary algorithm called genetic algorithm (GA) to solve it. Previously existing models were studied to identify likely difficulties encountered in such problems. It was realized that the mathematically-based …
-
Νοήμονες υπολογιστικές μέθοδοι εμπνευσμένες από τον φυσικό κόσμο για την βελτιστοποίηση συστημάτων: βελτιστοποίηση εμπνευσμένη από τον ηχοεντοπισμό
… application domains (Portfolio Optimization, Resource Leveling in Project Management, Economic Load Dispatch, Production Lines Optimization). What is more, compared with other state-of-the-art methods of literature and other Nature-Inspired Algorithms, the proposed approach obtains a superior …
-
Χρονικός και οικονομικός προγραμματισμός έργων και χαρτοφυλακίων με ασαφείς περιορισμούς
… the focus is on optimizing the use of shared resources with resource leveling techniques and heuristic algorithms.iv) At the level of programmes of projects, the impacts of fuzziness of individual projects on the cost and duration of the entire programme are examined. Additionally, elements …