Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 263 for “"Return period"”.
-
The return period of soil liquefaction
Soil liquefaction is one of the most damaging effects of earthquake shaking. Current methods of predicting liquefaction have proven to be effective for a given intensity of earthquake shaking but, because they consider only a single intensity at a time, their ability to communicate total …
-
How Pluvial Floods in Urban Areas Vary with Rain Return Period
… areas by estimating a manageable rain return period. The study evaluated floods generated by rain from return periods in the range of 10-100 years, in four different residential areas with nearby cloudburst areas, all located in the City of Gothenburg. Further, the study included an …
-
Probability structure and return period calculations for multi-day monsoon rainfall events at Subang, Malaysia
… develop and test an approach to calculate the return period of multi-day rainfall events with respect to the duration and amount. Daily monsoon rainfall data recorded at Subang Airport are gathered from the Malaysian Meteorological Department. Subang Airport is located near Kuala Lumpur (the …
-
Evaluation of GEV Over LP3 When Predicting Return Period Annual Exceedance For Santa Ana, San Gabriel and Urbanized Regions in California
… is not accurate to use a projection of 100-year return period, for example, to represent future projection. Comparing the LP3 and GEV CDFs, for the majority of the stream gages analyzed in this project, GEV proves to be the most conservative method, with smaller return periods.
-
Modeling the Impact of Future Climate on Drainage Infrastructures
… peak discharges for a 10, 25, 50, and 100 year return period using ArcGIS and HEC-HMS. A previously washed out 12 foot CMP culvert on BIA-route 32 was analyzed under each specified return period, using HY-8 and Hydraflow Express, to verify culvert performance. This was compared to the capacity …
-
Modeling the Impact of Future Climate on Drainage Infrastructures
… peak discharges for a 10, 25, 50, and 100 year return period using ArcGIS and HEC-HMS. A previously washed out 12 foot CMP culvert on BIA-route 32 was analyzed under each specified return period, using HY-8 and Hydraflow Express, to verify culvert performance. This was compared to the capacity …
-
Observed Extreme Rainfall Trends Along the United States Gulf and Southeastern Coasts
… pooled trends vary from -5% to +27% at the 2-yr return period and -8% to ~ +50% at the 100-yr return period. The trend estimates themselves are sensitive to various weather events and are therefore unreliable as individual estimates. The aggregate of the pooled trends yield mean trend estimates …
-
Erosion and Sediment Controls on Reclaimed Mine Refuse Impoundments
… was predicted to be 0.397 tons for a two-year return period, 0.661 tons for a five-year return period, 0.879 tons for a 10-year return period, 1.245 tons during a 25-year return period, 1.588 tons from a 50-year event, 1.922 tons during a 100-year event, and finally a total of 2.525 tons of …
-
Mapeamento de perigo de inundação incorporando o indicador tempo
… flood maps for 5, 10, 20, 50 and 100 years return period. From the hazard map for each return period the hazard map of the region was obtained, based on the frequency-weighted average. The indicators hazard maps for each return period were useful, and it was possible to verify the influence …
-
Advancing Flood Flow Prediction Models for Ungauged Basins
… presents a simple, unified equation to predict return period peak flows, incorporating influential and easy to obtain input variables. Two novel variables are introduced: the Land Use Soil (LUS) factor and the 2 – year return precipitation effect (PE2). The equation achieved an R2 of 0.95, 0.83 …
-
Predicting Low Probability Streamflow Using Lidar Data and Hydraulic Geometry
… was fitted to predict discharge to a 200-year return period. The method was compared with gauged sites in low-order streams (less than 90-meter bankfull width) resulting in SE/SY=1.31 for Qbf and SE/SY=1.90 for the 200-year return period discharge; model precision is poor. However, the relative …
-
Computation of Probable Maximum Precipitation (PMP) and Its Uncertainty
… distribution, and determination of the return period. This study determined the PMP values for different durations using data from the Brazos River basin, Texas. There are, however, uncertainties associated with the PMP values estimated using the statistical method. It was found that …
-
THE HYDROLOGIC CONTROL ON SHALLOW LANDSLIDE TRIGGERING: EMPIRICAL AND MONTE CARLO PYSICALLY-BASED APPROACHES
… approach has been applied for estimation of return periods of shallow landslide triggering and for the evaluation of the most commonly-used types of empirical rainfall threshold. Use of the Monte Carlo approach for estimation of the return period of landsling, represents an advance to …
-
Flow estimation for stream restoration and wetland projects in ungaged watersheds using continuous simulation modeling
… two times baseflow and less than flows with a return period of ten years. The hydrologic calibration parameters were related to watershed characteristics through regression analysis, and these equations were used to calculate regional model parameters based on watershed characteristics for a …
-
Reliability analysis of wave run-up
… the significant wave height for a given return period from the long-term distribution of storms. Then, the maximum wave height corresponding to the significant wave height, and its corresponding wave run-up are obtained. Method II consists of obtaining a long-term distribution of …
-
Mitigating Climate Change Induced Increases in Rainfall Intesity and Frequency Using Lid Stormwater Techniques
… outflow to pre-development values for specified return period storms. Increases in these return period storm depths, as predicted by many global climate models, will stress existing stormwater infrastructure. This thesis examines two issues related to the impact of climate change on stormwater …
-
Seismic hazard assessment and development of earthquake catastrophe model based on geological data and tectonic geomorphology
… (151-156 times over 15 kyrs, or up to 96 year return period) is observed in the central part of the Athens basin. The maximum intensity VIII recurrence (115 times over 15 kyrs, or up to 130 year return period) is observed in the western part of Attica, while the maximum intensity IX …
-
Multihazard Performance-Based Assessment of Multi-Storey Steel Braced Frame Buildings
… elastically under wind load. Further, the return period for the seismic and wind loads are not compatible in the building codes; hence, at design level, the seismic hazard is associated to 2500-year return period and the wind hazard (ultimate limit state) to 500-year return period. This …
-
A regional approach for estimating design storms in Canada.
… t-min to the 60-min rainfall depth of the same return period) are found to be independent of return period and geographical location for any storm less than 60 minutes. However, for storms of longer durations, depth-duration ratios depend on both the return period and the geographical location …
-
Uncertainty quantification and attribution in flood risk modelling
… ratios of the vulnerability curves, and the return period of flood events in the Rhine River Basin. I used these input uncertainty ranges to perform a global sensitivity analysis on the flood risk model over the Rhine River Basin. First, I identified the dominant input uncertainties in each …
Page 1 of 14