Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results 1 to 2 of 2 for “"Rework Impact"”
-
Improved Schedule Analysis Considering Rework Impact and Optimum Delay Mitigation
Rework has been a primary cause of cost and schedule overruns in the construction of heavy industrial projects such as those related to oil and gas. It has been reported that the direct cost of rework is about 5% of total construction costs. Several research studies have analyzed the causes and …
-
Advanced Time-Series Forecasting of Construction Project Cost Estimate At Completion (EAC) Incorporating Inefficiency Impacts
… factors such as adverse weather conditions and rework, both of which can significantly distort productivity, schedules, and cost forecasts. Traditional Earned Value Management (EVM) methods, while widely adopted, rely primarily on historical performance indices and often fail to account for such …