Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 25 for “"Schedule Delay"”.
-
CRUISER MODERNIZATION: AN ORGANIZATIONAL KNOWLEDGE CAPTURE
… knowledge transfer contributed to cost growth, schedule delay, rework, and delivery of non-operational capability. The background is the Navy’s cruiser modernization effort where compressed schedules, limited shipyard capacity, firm-fixed-price contracting pressures, and fragmented authority …
-
Multi-Criterion Dynamic Traffic Assignment Models and Algorithms for Road Pricing Applications with Heterogeneous Users
… trip-makers with different VOT and values of schedule delay (VOSD) making simultaneous route and departure time choices so as to minimize their respective trip costs, defined as the sum of travel cost, travel time weighted by VOT, and schedule delay weighted by VOSD. The MSRDUE problem is also …
-
LOOK-AHEAD SCHEDULING FOR ELECTRICAL CONTRACTORS
… high risk of subpar productivity performance and schedule delay due to many unique challenges in the field. More often than not, this subpar performance is a planning issue. Published short term planning methods, such as Workface Planning, Enhanced Work Packaging, and Last Planner, which have …
-
Determining the Feasibility of Using Abandoned Big Box Stores as Modular Construction Factories
… to improve quality control, decrease project schedule, decrease project costs, and a reduction in onsite safety risks. Research conducted in this thesis looks into the feasibility of developing a new space for modular construction factories inside abandoned big box stores. Big box stores house …
-
A Predictive Model for Scaffolding Manhours in Heavy Industrial Construction Projects: An application of machine learning
… ones, which may cause budget overrun and schedule delay. However, due to the lack of systematic and scientific models to estimate scaffolding productivity, the heavy industrial company has difficulty to plan and allocate the resources for scaffold activities before construction. To …
-
Designing air transport networks that serve sparse demands
… of the passengers by reducing their travel and schedule delay times. The third network was designed to minimize the total combined cost of both the airline and the passengers. This was done by minimizing the airline unit costs of operations, schedule delays, and travel times. As a case study, …
-
Risk analysis in tunneling with imprecise probabilities
… have to face potential risks of cost overrun or schedule delay. Risk analysis has become a required tool (by insurers, Federal Transit Administration, etc.) to identify and quantify risk, as well as visualize causes and effects, and the course (chain) of events. Various efforts have been made to …
-
Development of a Decision Support Tool for Planning Rail Systems: An Implementation in TSAM
… logit model are travel time, travel cost and schedule delay. Travel times and travel costs for different rail technologies are calculated using a rail network and actual or proposed rail schedules. The concept of relational databases is used in the development of the network topology. Further, …
-
A Decision Support System for Dynamic Integrated Project Scheduling and Equipment Operation Planning
… under limited resource availability is to first schedule activities with the assumption of unlimited resources, and then assign required resources to activities until available resources are exhausted. The process of matching a feasible resource plan with a feasible schedule is called resource …
-
Essays on the effectiveness of environmental and urban transportation policies
… road congestion and addresses the importance of schedule delay cost occurred due to uncertain traffic time. We propose the notion of a "reliability standard" that commuters use to calculate their schedule time --- the buffer time added to a commute so as to ensure being at work on time most of …
-
Strategic airline alliance : modelling and empirical analysis
… surplus level during the post-alliance period. Schedule delay times are also reduced, owing to the alliances. Partners' stock values are positively affected by alliance announcements and by alliance operations. Most partners have experienced greater traffic increases on alliance routes than …
-
Robust Optimization Model for Bus Priority under Arterial Progression
… on a performance index that is a function of bus schedule delay, automobile and bus passenger delays, and vehicle delays, subject to bandwidth and minimum green constraints. Minimum green constraints ensure that other traffic users are not unduly penalized. Bandwidth constraints allow for …
-
Exploring Travel and Activity Behavior in Transit-Oriented Developments: Insights Into Transportation Benefits and Travel Demand Modelling
… choice and sequence, and commute time and schedule delay. With a strong research design of comparing TOD (0.5 mile buffer areas around transit stations) with auto-oriented development (AOD) that features relatively low density and mainly residential use, behavioral differences in each …
-
Developing Travel Behaviour Models Using Mobile Phone Data
… to understand the sensitivity attached to schedule delay, thus enabling its valuation, despite the passive nature of the data. The model results are in line with the expected travel behaviour, and the schedule delay valuation estimates are reasonable for the study area. Finally, a joint …
-
Operational, supply-side uncertainty in transportation networks: causes, effects, and mitigation strategies
… comprise between one-third and one-half of all delay on freeways. Although past research has considered many individual aspects of this problem, this dissertation is unique in bringing a comprehensive approach, beginning with study of its causes, moving to discussion of its effects on traveler …
-
Perceptions of Production Home Builders on Primary Causes of Delay in Homebuilding in Texas
On-schedule delivery of projects has been a concern and major criticism of the construction industry. The recurring failure in the on-time delivery of projects has emphasized the need for a systematic investigation of the causes influencing delay. This research has employed an extensive literature …
-
Problems and Models in Strategic Air Traffic Flow Management
… trade-off between benefits from queuing delay reduction and costs due to simultaneous schedule delay increase to passengers while imposing slot limits at airports. A set of quantitative models and simulation procedures are developed to explore the possible airline scheduling responses …
-
Enhanced Construction Cost Estimation of Highway Projects using Emerging Statistical and Machine Learning Techniques
… can lead to cost overrun, scope change, schedule delay, postponement, and cancellation of transportation projects, which are problematic for both owner organizations and highway contractors. There is a critical need to enhance the quality of construction cost estimates to efficiently …
-
Empirical Analysis of Issue Management in Small Vertical Construction Projects: Relationship between Project Performance, Project Team Actions, and Issue Types
… (mostly negative) from their base cost, schedule, and quality. Therefore, even smaller magnitude of cost and schedule growth on projects, can quickly cumulate to millions of dollars and months of schedule delay across the entire portfolio. Project control techniques can be used reduce the …
Page 1 of 2