Results

Showing 1 to 20 of 43 for “"Schedule Growth"”.

  1. Analyzing cost and schedule growth in public works projects

    … one-way ANOVA to determine if the mean cost and schedule growth were significantly different from each other. The results were summarized and conclusions drawn on the tests performed.

    unlv Repository record for Analyzing cost and schedule growth in public works projects (opens in a new tab) Download PDF for Analyzing cost and schedule growth in public works projects (opens in a new tab)

  2. Use of Team Building on Construction Projects to Reduce Cost Growth and Schedule Growth

    … provided the foundation for this research. Cost growth and schedule growth are two areas that were suspected to be improved by the use of team building. A thorough statistical and graphical analysis was conducted to evaluate the effects of the team building process on cost growth and schedule …

    vt Repository record for Use of Team Building on Construction Projects to Reduce Cost Growth and Schedule Growth (opens in a new tab)

  3. Impact of Design Cost Percentage on Cost Growth, Schedule Growth, and Construction Intensity of Road Construction Projects

    … projects is measured in terms of cost and schedule variation. Studies have identified that such variations are mainly due to design changes, which are more frequent on projects executed through the design-bid-build (DBB) delivery method. Thus, the design factor is identified as one of the …

    unlv Repository record for Impact of Design Cost Percentage on Cost Growth, Schedule Growth, and Construction Intensity of Road Construction Projects (opens in a new tab) Download PDF for Impact of Design Cost Percentage on Cost Growth, Schedule Growth, and Construction Intensity of Road Construction Projects (opens in a new tab)

  4. Cost and schedule growth during weapon system acquisition : an investigation of the impact of selected economic and political factors

    … two weapon system program outcomes, cost and schedule growth, and aspects of the political and economic climate during system development. The data sample selected for study was aerospace industry-related weapon system programs. The central methodology used in the analysis included: (1) The …

    nps Repository record for Cost and schedule growth during weapon system acquisition : an investigation of the impact of selected economic and political factors (opens in a new tab)

  5. Time waits for no program : schedule growth in technology development and systems acquisition of major U.S. defense weapons programs 1948-2009

    … determine the cause or causes of the significant growth in the time required to develop and field new technology in major weapon system programs in the U.S. Department of Defense that has occurred over the last sixty years. The effort revolved around the analysis of twenty-one case studies of …

    texas Repository record for Time waits for no program : schedule growth in technology development and systems acquisition of major U.S. defense weapons programs 1948-2009 (opens in a new tab)

  6. Causes and Impacts of Geotechnical Problems on Bridge and Road Construction Projects

    … during the construction phase generate cost growth, schedule delays, and claims in any project. However, the impact of geotechnical problems on construction costs, schedules, and claims in bridge and road projects had not been investigated in depth. The major objectives of this study were to …

    unlv Repository record for Causes and Impacts of Geotechnical Problems on Bridge and Road Construction Projects (opens in a new tab) Download PDF for Causes and Impacts of Geotechnical Problems on Bridge and Road Construction Projects (opens in a new tab)

  7. Correlation analysis: Army Acquisition Program cycle time and cost variation

    … are to explore the overall cycle time and cost growth trends in Army Acquisition Programs, and determine how program schedule growth affects program cost This analysis is relevant in facilitating development of acquisition reform initiatives targeted at reducing program schedule and cost. This …

    nps Repository record for Correlation analysis: Army Acquisition Program cycle time and cost variation (opens in a new tab)

  8. Investigating the relationships of project performance measures with the use of Building Information Modeling (BIM) and Integrated Project Delivery (IPD)

    … IPD experienced significantly less cost and schedule growth; what's more, projects that used BIM in construction were found to exhibit significantly higher levels of schedule growth. Lastly, healthcare projects using IPD had significantly fewer Requests for Information (RFI) at the 90% CL. A …

    emich Repository record for Investigating the relationships of project performance measures with the use of Building Information Modeling (BIM) and Integrated Project Delivery (IPD) (opens in a new tab)

  9. Impact of Disadvantaged Business Enterprises Participation and Mobilization Cost on Highway Project Performance

    … identified as factors affecting the cost and schedule performance of construction projects. However, no statistical analysis has yet been done to explore the nature of the relationship that mobilization costs and DBE participation have on the project performance metrics of highway projects. …

    unlv Repository record for Impact of Disadvantaged Business Enterprises Participation and Mobilization Cost on Highway Project Performance (opens in a new tab) Download PDF for Impact of Disadvantaged Business Enterprises Participation and Mobilization Cost on Highway Project Performance (opens in a new tab)

  10. Impact of design cost on project performance of design bid build projects

    … design are minimized, the construction cost and schedule growth of the project also will be minimized. This study analyzed data from Clark County, Nevada public works projects to determine the impact of design cost on construction cost and schedule growth. The sample included projects completed …

    unlv Repository record for Impact of design cost on project performance of design bid build projects (opens in a new tab) Download PDF for Impact of design cost on project performance of design bid build projects (opens in a new tab)

  11. Causes of Change Orders and Its Impact on Road Maintenance Contracts

    Change orders (CO) commonly generate cost-growth, schedule-growth or both, in construction as well as in maintenance contracts. Literature reviews revealed that the causes and impact of CO on new construction contracts had been comprehensively studied, but the causes and impact of CO in maintenance …

    unlv Repository record for Causes of Change Orders and Its Impact on Road Maintenance Contracts (opens in a new tab) Download PDF for Causes of Change Orders and Its Impact on Road Maintenance Contracts (opens in a new tab)

  12. Does Design-Build (DB) Outperform Construction Management at Risk (CMAR)? A cost and schedule comparative study of DB projects and CMAR projects

    … results on which of the two has better cost and schedule performances when applied in construction projects. This study chose unit cost, change order factor, cost growth, schedule growth, and construction intensity as the metrics to measure the cost and schedule performance of both DB projects …

    tamu Repository record for Does Design-Build (DB) Outperform Construction Management at Risk (CMAR)? A cost and schedule comparative study of DB projects and CMAR projects (opens in a new tab)

  13. An Empirical Comparison of Project Delivery Method Performance for Highway Construction Projects

    … examined five major performance metrics: cost growth, schedule growth by notice to proceed, schedule growth by construction start date, award growth and construction engineering inspection cost factor. The data were collected from six selected state departments of transportation (DOT): Florida, …

    ku Repository record for An Empirical Comparison of Project Delivery Method Performance for Highway Construction Projects (opens in a new tab)

  14. Empirical Analysis of Issue Management in Small Vertical Construction Projects: Relationship between Project Performance, Project Team Actions, and Issue Types

    … (mostly negative) from their base cost, schedule, and quality. Therefore, even smaller magnitude of cost and schedule growth on projects, can quickly cumulate to millions of dollars and months of schedule delay across the entire portfolio. Project control techniques can be used reduce the …

    ku Repository record for Empirical Analysis of Issue Management in Small Vertical Construction Projects: Relationship between Project Performance, Project Team Actions, and Issue Types (opens in a new tab)

  15. The relationship between alternative project approaches, integration, and performance

    … projects offer significant advantages in cost growth, schedule growth, modifications, and design deficiencies.

    uiuc Repository record for The relationship between alternative project approaches, integration, and performance (opens in a new tab)

  16. A performance and practice comparison between public and private projects

    … and project delivery systems as well as cost growth, change costs, and schedule growth. This research includes data from 341 public and private projects contained in the Construction Industry Institute Benchmarking and Metrics database. Various statistical comparisons are performed, and …

    texas Repository record for A performance and practice comparison between public and private projects (opens in a new tab) Restricted access

  17. Analyses of Highway Project Construction Risks, Performance, and Contingency

    … risk drivers with project characteristics, cost growth, schedule growth, and project contingency. This study has adopted 31 relevant and significant programmatic and project-specific risk drivers from different past studies. These risk drivers have been analyzed and evaluated using survey …

    ndsu Repository record for Analyses of Highway Project Construction Risks, Performance, and Contingency (opens in a new tab)

  18. Analyses of Highway Project Construction Risks, Performance, and Contingency

    … risk drivers with project characteristics, cost growth, schedule growth, and project contingency. This study has adopted 31 relevant and significant programmatic and project-specific risk drivers from different past studies. These risk drivers have been analyzed and evaluated using survey …

    ndsu Repository record for Analyses of Highway Project Construction Risks, Performance, and Contingency (opens in a new tab)

  19. A Critical Analysis of Construction Manager-at-Risk Project Delivery in Public University Capital Projects

    … and quantify the value of owner-driven scope growth in achieving critical success factors. Machine learning algorithms were used to support construction research and analysis, modeling cost and schedule growth using a sample of 37 CMR and 74 DBB projects, and accurately imputing missing data …

    oklahoma-thes Repository record for A Critical Analysis of Construction Manager-at-Risk Project Delivery in Public University Capital Projects (opens in a new tab)

  20. Effect of prime contractor financial position on major weapon system cost and delivery performance

    … between outcome measures reflecting cost and schedule growth and summary indexes of financial health, constructed using indexes computed from financial distress models. The summary indexes were used to indicate contractor financial health, and change in financial health, before and during both …

    nps Repository record for Effect of prime contractor financial position on major weapon system cost and delivery performance (opens in a new tab)