Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results 1 to 13 of 13 for “"Schedule Impact"”

  1. The application of advanced hydrodynamic analyses in ship design

    … conducted much sooner, reducing the economic and schedule impact of any necessary changes.

    mit Repository record for The application of advanced hydrodynamic analyses in ship design (opens in a new tab)

  2. Supporting design planning through process model simulation

    … in the process and reduce the resulting project schedule impact. The results from the simulation analyses were evaluated against historical data from the case study company and heuristics for design planning were defined. Overall, this research demonstrated how simulation analysis of both …

    cambridge Repository record for Supporting design planning through process model simulation (opens in a new tab)

  3. Analyses of Highway Project Construction Risks, Performance, and Contingency

    … with project characteristics, cost growth, schedule growth, and project contingency. This study has adopted 31 relevant and significant programmatic and project-specific risk drivers from different past studies. These risk drivers have been analyzed and evaluated using survey responses from …

    ndsu Repository record for Analyses of Highway Project Construction Risks, Performance, and Contingency (opens in a new tab)

  4. Analyses of Highway Project Construction Risks, Performance, and Contingency

    … with project characteristics, cost growth, schedule growth, and project contingency. This study has adopted 31 relevant and significant programmatic and project-specific risk drivers from different past studies. These risk drivers have been analyzed and evaluated using survey responses from …

    ndsu Repository record for Analyses of Highway Project Construction Risks, Performance, and Contingency (opens in a new tab)

  5. The application of advanced hydrodynamic analyses in ship design.

    … conducted much sooner, reducing the economic and schedule impact of any necessary changes.

    nps Repository record for The application of advanced hydrodynamic analyses in ship design. (opens in a new tab)

  6. Effective planning of end-of-life scenarios for offshore wind farm

    … to environmental, financial, safety Criteria, Schedule impact, and Legislation and guidelines.

    strathclyde Repository record for Effective planning of end-of-life scenarios for offshore wind farm (opens in a new tab)

  7. Effective planning of-end-of-life scenarios for offshore windfarm

    … to environmental, financial, safety Criteria, Schedule impact, and Legislation and guidelines.Keywords: Offshore Wind Turbine; Decommissioning; End-of-life scenarios; Decision making; Levelized Cost of Energy; Machine learning, Forecasting

    strathclyde Repository record for Effective planning of-end-of-life scenarios for offshore windfarm (opens in a new tab)

  8. Sustainable and User-Driven Scope Development Framework for Engineering Design Services of Transportation Infrastructure Projects

    … Key metrics such as redundancy ratio, project schedule impact, and co-occurrence patterns among decision variables were analyzed to validate the framework’s reliability and optimize its performance. Furthermore, a structured process for updating and maintaining the framework was established, …

    clemson Repository record for Sustainable and User-Driven Scope Development Framework for Engineering Design Services of Transportation Infrastructure Projects (opens in a new tab)

  9. Characterization of Fractured Reservior and Simulation of EOR Techniques

    … the micro-mechanisms of these methods, the impact of fracture network on production enhancement has not been systematically studied. In this study, unstructured gridding algorithms are improved to apply to the reservoir with high fracture density. Then the depletion behavior of the …

    tamu Repository record for Characterization of Fractured Reservior and Simulation of EOR Techniques (opens in a new tab)

  10. Forecasting cost at completion with growth models and Earned Value Management

    … an S-shaped growth model and combines the Earned Schedule (ES) concepts into its equation to provide more accurate and stable cost estimates. Widely used conventional index-based methods for CEAC have inherent limitations such as reliance on past performance only, unreliable forecasts in early …

    poli-torino Repository record for Forecasting cost at completion with growth models and Earned Value Management (opens in a new tab)

  11. TIMING OF RISK MANAGEMENT ACTIONS DURING THE CONSTRUCTION PROCESS: RELATIONSHIP WITH CONTROLLING PROJECT COST AND SCHEDULE IMPACTS

    … risk management actions and project cost and schedule performance. In the construction literature, many studies have analyzed project cost and schedule performance, qualitative perceptions regarding the relative importance of construction risk factors, and the cause, effect, and timing of …

    ku Repository record for TIMING OF RISK MANAGEMENT ACTIONS DURING THE CONSTRUCTION PROCESS: RELATIONSHIP WITH CONTROLLING PROJECT COST AND SCHEDULE IMPACTS (opens in a new tab)

  12. Alternative Foam Treatments For The Space Shuttle's External Tank

    … the importance of maintaining the shuttle launch schedule. This research will also be used to evaluate the potential application of the alternative product on future platforms. There are several possible outcomes to this research. This research could result in a recommended change to the ET foam …

    ucf Repository record for Alternative Foam Treatments For The Space Shuttle's External Tank (opens in a new tab)

  13. Evaluación de Metodologías para Análisis del Impacto de Cronograma en Proyecto de Defensa Ribereñas Río Matagente Bajo Contratación NEC 3

    … estudio analiza las metodologías para evaluar impactos al cronograma conforme a los lineamientos contractuales establecidos. Se propone una revisión retrospectiva de los eventos que generaron retrasos, utilizando enfoques en los Modelled Impacted Plan (MIP) establecidos en las prácticas …

    upc-peru Repository record for Evaluación de Metodologías para Análisis del Impacto de Cronograma en Proyecto de Defensa Ribereñas Río Matagente Bajo Contratación NEC 3 (opens in a new tab)