Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 28 for “"Schedule Management"”.
-
What the Department of Defense non-major acquisition project manager should know about cost and schedule management
… will likely be an increase in the number of Cost/Schedule Status Report (C/SSR) managed contracts. Thus it is imperative that the DoD non-major system project manager understand how to integrate performance measurement information and analysis into responsible management decision making. This …
-
An Innovative Approach to Schedule Management on the F/A-22 Major Defense Acquisition Program (MDAP): Demonstration of Critical Chain Project Management
… process by examining Critical Chain Project Management (CCPM) as an innovation with the potential to address an important schedule planning and execution performance gap in DOD weapon system development programs. The contextually different Integrated Product Team case studies in DOD's F/A-22 …
-
Cost and schedule control management: what the Department of Defense major acquisition system program manager needs to know
… to bring about better programmatic cost and schedule control for major defense acquisitioin programs. thus, it is imperative for the DoD major system program manager to achieve a thorough understanding of cost and schedule control management and apply these principles to management decision …
-
Assessment of highway construction schedule review problems of Departments of Transportation : case study of Texas
Schedule review is an important aspect of schedule management for the owners like the state Department of Transportation (DOTs) to successfully deliver projects on time. However, the quality of schedules submitted by the contractors varies greatly, without having the required formats and …
-
Applying the Principles of Project Management to a Collegiate Automotive Engineering Design Project
… is responsible for coordinating high-level management and planning activities with the goal of better aligning the team with business and automotive industry practices. Project management responsibilities within the Hybrid Electric Vehicle Team are divided into four categories: human …
-
Organizational project management methodologies - Structures, contents, and use
This research investigates organizational project management methodologies – structured collections of project management knowledge and experience – by focusing on their structures and contents, and the specific reasons why organizations use them. This research comprises a mixed-method multiple …
-
BusyBeeTaskManager : visual, hosted, collaborative task management
… industry into designing products for Business Management, Project Planning and Schedule Management on web and device platforms. However, these tools are either designed for novices or industrial level managers. A large number of individuals fall in between; their projects require intensive …
-
A comparative analysis of cost and schedule performance in public and private construction projects
This research investigates the cost and schedule performance differences between construction projects from public and private organizations, emphasizing the significance of effective management for successful project execution. Utilizing data from the Construction Industry Institute (CII), the …
-
An analysis of Earned Value Management Implementation within the F-22 System Program Office's Software Development
Department of Defense (DoD) use of Earned Value Management (EVM) program control tool has significantly increased in the last ten years. DoD acquisition policy and training promotes EVM as a cost and schedule management tool, tracking the earned value of the work completed per the baseline plan. …
-
Exploring the role of integration management in facilitating partnerships between state DOTs and designer-builders in highway construction
… many obstacles in managing projects, such as schedule management, cash flow, and supply chain protection, all of which make project management more complex. The design-build project delivery method has emerged as an approach that can overcome these obstacles and meet the needs of various …
-
A Model Records Management System for Texas Public Utilities: An Information Science Tool for Public Managers
… is to lay a framework for an effective records management program. Purpose: The first purpose of this paper is to develop a model records management system for public utilities in Texas using relevant scholarly literature. Second, the model was evaluated by a pool of experts. Third, a revised …
-
Assessing the Efficacy: Statistical Models vs. Machine Learning (ML) Approaches for Prediction Modeling In the Construction Industry
… insights and potential remedies for project management issues. The construction technology landscape is gradually evolving towards integrated software platforms to meet customer needs more effectively. However, the construction sector lacks comprehensive predictive analytics solutions for …
-
Unified Simulation Methodology and Project Risk Assessment Framework
Simulation applications in construction-project management are primarily limited to academic research. Where simulation has been used in project risk assessment in the industry, it has not been used to its potential. This research addresses two problems: the difficulty associated with using …
-
Locating En-Route Charging Stations and Time Points for a Transit Route with Battery- Electric Buses
… station placement) and operations (comprising schedule management and holding control). Overall, life cycle emissions of BEBs tend to be lower than those of diesel buses. However, the actual environmental impact depends on various factors, including the energy source for electricity generation, …
-
Constructors' Decision-Support Framework for NZEB Projects
Efficient construction project management is crucial to project success. As the construction industry changes, constructors find themselves confronted by new issues and must undertake roles that have not traditionally been part of their responsibility. This change in roles requires their …
-
PROPUESTA PARA LA TRANSICIÓN DE UN SISTEMA CON SUMINISTRO DE AGUA INTERMITENTE A SUMINISTRO CONTINUO
… the severity of external events, and poor management of water supply systems threaten the continuity of drinkable water supply. When a scenario under these conditions is set, water supply companies opt for intermittent supply and thus deliver water to users for just few hours during the …
-
Live Music Venue Marketing in a Post-COVID Northwest Arkansas
… private events alongside its 1 regular concert schedule. Management has been successful in embracing this concept of change, and continued with their openness to adaptation as they emerged from their recent hiatus. Being a public gathering space, revenue streams are limited to those of a bar, …
-
Aplicación de los lineamientos PMBOK en la gestión de cronogramas en los proyectos de construcción civil en centros educativos
La presente tesis propone la implementación de la gestión de cronogramas, fundamentada en las directrices del PMBOK, con el objetivo de cumplir con los plazos establecidos por los usuarios en los tres proyectos de construcción de instituciones educativas en la costa peruana (I.E. Ricardo Palma del …
-
Propuesta de mejora en los cumplimientos de tiempo para proyectos de construcción urbanos de una pyme constructora, basado en la filosofía Lean Construction y Estimación Basada en Tres Valores
Actualmente, el sector de la construcción enfrenta desafíos debido a un modelo de producción tradicional deficiente, afectando especialmente a las pequeñas y medianas empresas (pymes) que operan en esta industria. Estas pymes experimentan pérdidas operacionales, sobrecostos y retrasos en sus …
-
Propuesta de implementación de la gestión del Cronograma en obras ejecutadas bajo la modalidad de administración directa para el saneamiento básico rural en el proyecto Piedra Grande - La Convención, Cusco-Perú
El presente trabajo de investigación presenta una propuesta de implementación de la gestión del cronograma en obras ejecutadas bajo la modalidad de administración directa para el proyecto de Saneamiento básico rural en la Provincia de La Convención, Cusco Perú. De acuerdo al portal Transparencia …
Page 1 of 2