Global ETD Search

Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.

Results

Showing 1 to 4 of 4 for “"Schedule updating"”.

  1. Automatic Transit Schedule Updating Using AVL/APC System

    Observing and fixing transit vehicle’s schedule adherence problems have always been one of the main priorities of a transit agency, and different approaches have been developed over time to help reflect transit vehicle’s performance and where the improvements should be focuses. Unlike traditional …

    waterloo Repository record for Automatic Transit Schedule Updating Using AVL/APC System (opens in a new tab)

  2. Modelling issues in repetitive construction and an approach to schedule updating

    … are planned and to the requirements of the updating process necessary to monitor, and hence control the project. Two models evolved. The definition of the general repetitive structure was formulated to provide construction personnel with a tool by which to model the process of repetition. …

    ubc Repository record for Modelling issues in repetitive construction and an approach to schedule updating (opens in a new tab) Download PDF for Modelling issues in repetitive construction and an approach to schedule updating (opens in a new tab)

  3. Autonomous Robot-Enabled Data Collection, Classification, and Processing Method for Real-Time Construction Schedule Updating

    … and quality. Monitoring, data collection, and updating the schedule are some of project management's most time-consuming and labor-intensive tasks. Modern technologies such as robots and computer vision present a potential solution to this issue. Although previous research enhanced data …

    gatech Repository record for Autonomous Robot-Enabled Data Collection, Classification, and Processing Method for Real-Time Construction Schedule Updating (opens in a new tab)

  4. Developing a framework for using artificial intelligence to update and maintain 4D BIM schedules

    … Modeling (BIM) to streamline construction schedule updating and maintenance processes. It accepts voice and text inputs for schedule updates, facilitating real-time integration with Autodesk Navisworks, and eliminates the need for direct access to or advanced knowledge of BIM tools. It also …

    manitoba Repository record for Developing a framework for using artificial intelligence to update and maintain 4D BIM schedules (opens in a new tab)