Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 7 of 7 for “"Schedule variance"”.
-
TRIDENT submarine logistics data system (LDS): a case study in life cycle management and budgeting.
… of controlling the rapidly rising costs and schedule delays plaguing software systems, Department of Defense (DOD) has implemented the concept of life cycle management for automated information systems (AIS) . This thesis analyses the DOD life cycle management directives through the …
-
A PROBABILISTIC APPROACH TO JOB-SHOP MANUFACTURING ESTIMATION AND PERFORMANCE FORECASTING
In defense job-shop manufacturing, cost and schedule estimates along with performance to those estimates have a heavy impact on overall project budget and schedule for pre-milestone B activities. Variations at this stage of the project tend to directly influence the availability of the system under …
-
Tools to Improve the Process of Engineering Design: An Analysis of Team Configuration and Project Support
… design cycle time, cost effectiveness, cost variance, schedule variance, mental workload, and job satisfaction. For treatments that called for groups, group process was evaluated in addition to group workload. The results showed groups took 61% more time to plan their projects compared to …
-
Analyzing cost, schedule, and engineering variances on acquisitions programs
This study of cost, schedule, and engineering variance (CV, SV, and EV) data identified in the Selected Acquisition Reports (SARs) of acquisition programs indicates that early program variances are significantly associated with future program variances. An enhanced understanding of CV, SV, and EV …
-
Analytic Evaluation of the Expectation and Variance of Different Performance Measures of a Schedule under Processing Time Variability
… only on the expected value and ignoring the variance of the measure used, the scheduling problem becomes purely deterministic and the significant ramifications of schedule variability are essentially neglected. In many a practical cases, a scheduler would prefer to have a stable schedule with …
-
Supervisión y control de obras de edificación bajo los enfoques de Lean Construction y del PMI
El propósito de esta investigación consistió en la realización de una propuesta para la implementación de un sistema de gestión para la apropiada supervisión y control de obras de edificación con base en el trabajo colaborativo. El caso de estudio se basó en la construcción de un hotel en el …
-
Cost/Schedule Control Criteria for Selected Government Contracts
This report presents and interprets the Cost/Schedule Control System Criteria, management techniques which have been determined by the Department of Defense to represent appropriate methods for adequately controlling program costs and schedules. Applied to selected contracts of significantly large …