Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 20 of 893 for “"Scheduling problem"”.
-
Resident Scheduling Problem
This thesis is concerned with the Resident Scheduling Problem (RSP) in which a good schedule is desired that will meet both departmental requirements and residents' preferences. Three scenarios that represent most situations and account for various departmental requirements and needs are described. …
-
A general scheduling problem configuration
Not available
-
A dynamic vehicle-scheduling problem
… formal decision rules to solve a dynamic vehicle-scheduling problem provided by ALLTRANS EXPRESS LTD. ( Vancouver ). Computer simulation is used as the research tool. The computer simulated results are compared with ALLTRANS solutions based on the performance measures of mean travel time per …
-
Constraint-based master scheduling problem.
In the manufacturing industry, many problems pertain to part management, assembly and scheduling. Products today largely consist of a series of components which themselves can, in turn, consist of more components. The assembly of a product becomes an exercise in assembling all of the sub-components …
-
Many Shared Resources Scheduling Problem
… med många delade resurser är ett algoritmiskt problem där ett antal jobb ska schemaläggas på identiska maskiner. Varje maskin kan endast bearbeta ett jobb åt gången. Varje jobb hör till en specifik resurs, och två jobb som delar samma resurs kan inte behandlas parallellt. Att minimera makespan, …
-
On generalized movement scheduling problem
The problems of generalized movement scheduling (GMS) and its dual, the minimum pace length problem (MPL), are defined and investigated. In the generalized movement model a set of objects are to be scheduled to move from their individual sources to their individual destinations in a transportation …
-
A minimum distance sports scheduling problem
Electronic Thesis or Dissertation
-
Disruption managment for project scheduling problem
… studies the resource-constrained project scheduling problem under disruptions. The focus is on how to formulate such problems and solve them efficiently. The work includes mainly three parts. First, we present an exact branch-and-cut algorithm for the multi-mode resource-constrained …
-
The multiple resource constrained scheduling problem
… solutions to the Mutiple Resource Constrained Scheduling (MRCS) problem are presented. The MRCS problem can be considered an m machine, n job problem with batch setups subject to resource (worker) constraints with the objective of minimizing makespan, the maximum job completion time. …
-
On the economic lot scheduling problem
The Economic Lot Scheduling Problem (ELSP), that schedules production of multiple products on a single machine under capacity constraints, is one of the classic problems in operations research. The Extended Basic Period (EBP) and Power-of-Two (PoT) policy is used and several algorithms are …
-
The Distributed and Assembly Scheduling Problem
… challenges. This thesis studies a production problem in which both distributed manufacturing and assembly systems are considered. Although distributed manufacturing systems and assembly systems are well-known problems and have been extensively studied in the literature, to the best of our …
-
The Concurrent Development Scheduling Problem (CDSP)
… together later for a deliverable product. The CD Scheduling Problem (CDSP) is defined as most CD baseline project schedules being developed today are overly optimistic. That is, they finish late. This study researches those techniques being used today to produce CD project schedules and looks for …
-
Two-machine job shop scheduling problem
Includes bibliographical references.
-
The 2-stage Assembly Scheduling Problem
… response. In this context, improving the scheduling is of great importance. This is why, in this doctoral thesis, different ways to improve the scheduling of the considered problem are discussed in this thesis. More specifically, we address the 2-stage assembly scheduling problem. This …
-
The bidirectional-ordered flow shop scheduling problem
Not available
-
A Stochastic Model for Self-scheduling Problem
<p>The unit commitment (UC) problem is a typical application of optimization techniques in the power generation and operation. Given a planning horizon, the UC problem is to find an optimal schedule of generating units, including on/off status and production level of each generating unit at each …
-
Convex conic relaxations of the scheduling problem
Scheduling has been used to describe a resources optimization problem since the early 1950's and plays an important role in domains such as manufacturing, transportation, distribution, construction, engineering, and management. A scheduling problem is defined by determining a production …
-
Single Machine with Two-agent Scheduling Problem
Scheduling problems have been studied for many years for optimizing resource allocation as scheduling plays a critical role in many manufacturing and service industries. During last two decades, two-agent scheduling problems have been used in many systems, such as railroad allocation system, …
Page 1 of 45