Scheduling flexible flowshops with sequence -dependent setup times
… scheduling problem in a flexible flowshop with sequence-dependent setup times. The production line consists of S production stages, each of which may have more than one non-identical (uniform) machines. Prior to processing a job on a machine at the first stage, a setup time from idling is …
-
Scheduling flexible flow lines with sequence dependent setup times
… examines scheduling in flexible flow lines with sequence-dependent setup times to minimize makespan. This type of manufacturing environment is found in industries such as printed circuit board and automobile manufacture. Lower makespans can be associated with more efficient use of resources. Poor …
-
Scheduling optimization of cellular flowshop with sequence dependent setup times
… Cell (cellular flowshop) Scheduling Problem with Sequence Dependent Setup Times (FMCSP with SDSTs) considering two performance measures: the total flow time as a mono objective, and the makespan and total flow time combined as a bi-criteria scheduling problem. The proposed problem is known to be …
-
Heuristics for Scheduling Reentrant Flexible Job Shops with Sequence-dependent Setup Times and Limited Buffer Capacities
… complex job shop include possible non-zero ready times and sequence-dependent setup times. We categorize the complex job shop into two classes: the complex job shop with infinite or finite buffer capacities. We propose three solution methodologies for scheduling the problem with infinite buffer …
-
Multi-objective sequencing on a single processor with sequence dependent setup times : a simulated annealing approach
Thesis (Ph. D.)--Michigan State University. Department of Management, 1996
-
Minimizing the makespan in a flexible flowshop with sequence dependent setup times, uniform machines, and limited buffers
… the makespan in a flexible flowshop with sequence dependent setup times, uniform machines, and limited buffers. A mathematical model was developed to solve this problem. The problem is NP-Hard in the strong sense and only very small problems could be solved optimally. For exact methods, …
-
A Particle Swarm Optimization Using Random Keys For Flexible Flow Shop Scheduling Problem With Sequence Dependent Setup Times
… developed to schedule flexible flow lines with sequence dependent setup times to minimize makespan. The flexible flow line scheduling problem is a branch of production scheduling and is found in industries such as printed circuit board and automobile manufacturing. It is well known that this …
-
The international wine supply chain: challenges from bottling to the glass
… bottling lot sizing and scheduling problem with sequence dependent setup times, in an adequate time-frame, which can be implemented by large wineries. We have developed a model and algorithm that produces fast, good and robust solutions for the winery lot sizing and scheduling problem with …
-
Scheduling of Wafer Test Processes in Semiconductor Manufacturing
… temperatures. A test process consists of both setup operations and processing operations on the test stations. The test operations occur in a specified order on the wafer devices, resulting in precedence constraints for the schedule. Furthermore, the assignment of the wafer devices to test …
-
Development of Algorithm for Scheduling an Assembly Shop: An Industrial Case Study
… scheduling with parallel machines, incorporating sequence-dependent setup times and dual resource constraints. The model aims to minimize delays and optimize resource utilization. Due to computational limitations, a Genetic Algorithm (GA)-based framework was developed, which outperformed the …
-
Operation-Level Sequence- Dependent Setup Time Reduction In Dynamic Cellular Manufacturing Systems
… a repetitive basis, when there are significant sequence dependent setup times and costs involved, cell formation (CF) problem should consider minimizing the sequence-dependent setup times in order to minimize the production cost. Setup time reduction in CMS has gained little to modest attention …
-
Multistage Random Key Genetic Algortihm Optimization for Scheduling Flexible Flow Lines with Sequence Depenedent Setup Times
… in flexible flow line manufacturing with sequence dependent setup times. The proposed RKGA representation decodes scheduling information independently at each stage, unlike the traditional RKGA, which is only sequenced based on the first stage, limiting flexibility. The proposed method's …
-
Optimization of production schedules for a food production company
… Part of the production process is inherent to sequence- dependent setup times (sdst), where the exact value of the setup time depends on the job last processed on the machine as well as the task next in line. Therefore, the effect of the condition of sdst on the size and execution time of the …
-
Scheduling of single-stage noncontinous processes
… lines/units is considered with the release times for units, order due dates and sequence-dependent setup times. MILP models are developed for both batch and semicontinuous processes with one or multiple due dates using slot-based time representation. MILP models are also formulated using …