Global ETD Search
Search theses and dissertations gathered from participating repositories worldwide. Every result links back to the library that holds it. No account is needed.
Results
Showing 1 to 19 of 19 for “"Sequencing and Scheduling"”.
-
Heuristic Procedures to Solve Sequencing and Scheduling Problems in Automobile Industry
… system with high variety. Efficient production scheduling and sequencing is important to achieve the overall material supply, production, and distribution efficiency around the mixed-model assembly line. This research addresses production scheduling and sequencing on a mixed-model assembly line …
-
On merging sequencing and scheduling theory with genetic algorithms to solve stochastic job shops.
… genetic algorithm to minimize total tardiness and to evaluate chromosomes using probability Gantt charting. The second was a stochastic constrained genetic algorithm to minimize total tardiness and to evaluate chromosomes using simulation. In these two algorithms, the fitness function was …
-
Optimal Sequencing and Scheduling Algorithm for Traffic Flows Based on Extracted Control Actions Near the Airport
… on safety to perform a benefits' analysis when sequencing and scheduling aircraft at the runway. The viability of creating a decision-support tool to aid air traffic controllers in sequencing and optimizing airport operations is evaluated through the benefits' analysis. Air traffic control is a …
-
Planning in parallel machine shops and scheduling of flexible process plans in mould manufacturing shop
… the planning tasks in parallel machine shops. Sequencing and scheduling complexities prevalent in parallel machine shops are usually solved using heuristic and Meta heuristic algorithms. Two heuristic algorithms are proposed to solve the computational time complexities of parallel machine …
-
Scheduling of jobs on a single machine to minimize total cost
… total of work-in-process, earliness, tardiness, and machine idle costs involved in the sequencing and scheduling of jobs on s single machine.
-
A methodology to solve single-model, stochastic assembly line balancing problem and its extensions
… (dictated by the number of stations on the line) and expected incompletion cost arising from tasks not completed within the prespecified cycle time. The proposed procedure is an approximation procedure that divides the problem into subproblems. For each subproblem, an approximate solution is …
-
Applications of Genetic Algorithms, Dynamic Programming, and Linear Programming to Combinatorial Optimization Problems
… problems are important in operations research and computer science. They include specific, well-known problems such as the bin packing problem, sequencing and scheduling problems, and location and network design problems. Each of these problems has a wide variety of real-world applications. In …
-
Arrival management for eVTOL aircraft in on-demand urban air mobility
<p>The electric vertical takeoff and landing (eVTOL) aircraft can alleviate transportation congestion on the ground by utilizing three-dimensional airspace efficiently. However, the endurance (specific energy) of Lithium-ion Polymer (Li-Po) batteries imposes severe constraints on the operational …
-
Data-Driven Decision-Making under Uncertainty in Surgery Planning
The growing demand for healthcare services, fueled by demographic changes and rising patient volumes, poses significant challenges for hospital operations. Nowhere is this more apparent than in surgical departments, which represent both the largest revenue source and the most complex cost center …
-
Improving Indoor Air Quality (IAQ) in Kuwaiti Housing Developments at Design, Construction, and Occupancy Stages
… weather climate. The prevailing wind is north and northeast and that causes sand storms. Also most of the towns and cities are situated and constructed within the vicinity of many industrial sites, petroleum downstream/upstream facilities (including Kuwait's three refineries, petrochemical …
-
An experimental investigation of composite priority rule scheduling for quality improvements in multi-stage production systems
… research has been conducted in the area of sequencing and scheduling of manufacturing operations. There has been a great deal of research work on investigating the performance of various priority rules. Previous studies have concluded that in general composite priority rules perform better …
-
Some topics on deterministic scheduling problems
Sequencing and scheduling problems are motivated by allocation of limited resources over time. The goal is to find an optimal allocation where optimality is defined by some problem specific objectives. This dissertation considers the scheduling of a set of ri tasks, with precedence constraints, on …
-
The end of time as we know it: ethics and inequalities in mothers and fathers experience of time for work, family and health
… in Australia have higher total time commitments and more gendered time-use patterns than other adults, with most 'juggling' their time between paid work and family caring responsibilities. Responding to the time demands of both the labour market and the family presents considerable challenges. …
-
Analysis and Design of Communication Policies for Energy-Constrained Machine-Type Devices
This thesis focuses on the modelling, analysis and design of novel communication strategies for wireless machine-type communication (MTC) systems to realize the notion of Internet of things (IoT). We consider sensor based MTC devices which acquire physical information from the environment and …
-
Investigation of stage ordering impact on fracture growth in multi-stage hydraulic fracturing of horizontal wells in stacked plays
Resource extraction and utilization from unconventional reservoirs have become the main focus of the oil and gas industry in the past few decades. Advances in technological capabilities made the unconventional reservoirs congested with horizontal wells with multi-stage hydraulic fracture …
-
A STOCHASTIC APPROACH TO APPOINTMENT SEQUENCING
… SHORTEST EXPECTED PROCESSING TIME FIRST (SEPT) AND THE SMALLEST VARIANCE FIRST (SV) RULES IN GENERAL. A SUFFICIENT CONDITION TO VIOLATE THE OPTIMALITY OF SEPT/SV IS FOUND. THEN WE IDENTIFY AND PROVE AN IMPORTANT PROPERTY OF THE OPTIMAL SEQUENCE IMPLYING THAT EACH FAST CUSTOMER MUST BE SCHEDULED …
-
Performance Evaluation and Integrated Management of Airport Surface Operations
The demand for aviation has been steadily growing over the past few decades and will keep increasing in the future. The anticipated growth of traffic demand will cause the current airspace system, one that is already burdened by heavy operations and inefficient usage, to become even more congested …
-
Job Sequencing & WIP level determination in a cyclic CONWIP Flowshop with Blocking
… studies namely; stochastic processing times and limited intermediate storage. One of the main issues in the design of a CONWIP system is the WIP level 'M', to be maintained. This research proposes an iterative procedure to determine this optimal level. The second main issue is the …