Scheduling flexible flowshops with sequence -dependent setup times
… in a flexible flowshop with sequence-dependent setup times. The production line consists of S production stages, each of which may have more than one non-identical (uniform) machines. Prior to processing a job on a machine at the first stage, a setup time from idling is needed. Also sequence …
-
Scheduling flexible flow lines with sequence dependent setup times
… in flexible flow lines with sequence-dependent setup times to minimize makespan. This type of manufacturing environment is found in industries such as printed circuit board and automobile manufacture. Lower makespans can be associated with more efficient use of resources. Poor scheduling when …
-
Scheduling optimization of cellular flowshop with sequence dependent setup times
… Scheduling Problem with Sequence Dependent Setup Times (FMCSP with SDSTs) considering two performance measures: the total flow time as a mono objective, and the makespan and total flow time combined as a bi-criteria scheduling problem. The proposed problem is known to be the NP-hard problem …
-
Modeling and Analysis of the Batch Production Scheduling Problem for Perishable Products with Setup Times
… scheduling problems for perishable products with setup times, with the main applications in answering production planning problems faced by manufacturers of perishable products, such as beers, vaccines and yoghurts. The benefits of effective production plans can help companies reduce their total …
-
Energy-Aware Multiserver Queueing Systems with Setup Times: Structural Properties, Exact Analysis, and Asymptotic Performance
… be turned on, with an exponentially distributed setup time, or turned off instantaneously. What policy the model should employ, or rather when each server should be turned on and off is far from a trivial question. A specific policy is often examined, but determining which policy to study can be …
-
Multistage Random Key Genetic Algortihm Optimization for Scheduling Flexible Flow Lines with Sequence Depenedent Setup Times
… flow line manufacturing with sequence dependent setup times. The proposed RKGA representation decodes scheduling information independently at each stage, unlike the traditional RKGA, which is only sequenced based on the first stage, limiting flexibility. The proposed method's performance is …
-
Heuristics for Scheduling Reentrant Flexible Job Shops with Sequence-dependent Setup Times and Limited Buffer Capacities
… complex job shop include possible non-zero ready times and sequence-dependent setup times. We categorize the complex job shop into two classes: the complex job shop with infinite or finite buffer capacities. We propose three solution methodologies for scheduling the problem with infinite buffer …
-
Multi-objective sequencing on a single processor with sequence dependent setup times : a simulated annealing approach
Thesis (Ph. D.)--Michigan State University. Department of Management, 1996
-
Minimizing the makespan in a flexible flowshop with sequence dependent setup times, uniform machines, and limited buffers
… in a flexible flowshop with sequence dependent setup times, uniform machines, and limited buffers. A mathematical model was developed to solve this problem. The problem is NP-Hard in the strong sense and only very small problems could be solved optimally. For exact methods, the computation times …
-
SCHEDULING PROBLEM WITH DRYING REQUIREMENTS, MACHINE ELIGIBILITY RESTRICTIONS, SETUP TIMES, AND ASSEMBLY REQUIREMENTS FOR AN INJECTION MOLDING FACILITY
… parallel machine scheduling problem with setup and processing resources. However, some manufacturing environments, such as plastic injection molding, need different sequential and parallel processes before the facility can process jobs in the machines. For example, some raw materials are …
-
A Particle Swarm Optimization Using Random Keys For Flexible Flow Shop Scheduling Problem With Sequence Dependent Setup Times
… flexible flow lines with sequence dependent setup times to minimize makespan. The flexible flow line scheduling problem is a branch of production scheduling and is found in industries such as printed circuit board and automobile manufacturing. It is well known that this problem is NP-hard. …